flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

New ballpark is another draw for thriving downtown in Summerlin, Nev.

Sports and Recreational Facilities

New ballpark is another draw for thriving downtown in Summerlin, Nev.

Developer Howard Hughes views the stadium as an essential piece to this master-planned community’s growth.


By John Caulfield, Senior Editor | April 12, 2019

The 10,000-person capacity Las Vegas Ballpark is located in the heart of suburban Summerlin, Nev., with a population of more than 100,000. Image: Howard Hughes Corporation

On April 9, the Las Vegas Ballpark, home to the Las Vegas Aviators Triple-A baseball team, opened in Downtown Summerlin, Nev. The club and ballpark are wholly owned by Howard Hughes Corporation, which claims this is the first minor-league ballpark in the U.S. to be built within a master-planned community.

Summerlin, on the western rim of Las Vegas, has ranked among the country’s top-10 best-selling communities for two decades. Developed by Howard Hughes Corporation, it encompasses 22,500 acres where 100,000 residents live within 250 neighborhoods. There are 6,000 acres still available for growth. Downtown Summerlin is the city’s walkable urban center with has over 125 stores. Its newer buildings include the practice facility for the Las Vegas Golden Knights pro hockey franchise.

Summerlin drew more than 18 million visitors last year, and the new $150 million ballpark, with 8,200 fixed seats and a total capacity of 10,000, is expected to be another major attraction. The Aviators, which recently changed its name from the Las Vegas 51s, plays in the Pacific Coast League and is part of the Oakland Athletics system. Prior to opening its 37th season at Las Vegas Ballpark this spring, the team had been drawing at least 300,000 fans annually at its old home, Cashman Field.

“Tonight marks a dynamic new chapter for the community of Summerlin and its thriving downtown, which continues to grow as a vibrant destination for visitors throughout Nevada, and beyond,” said David Weinreb, CEO of Howard Hughes Corporation, during opening-day ceremonies that included Nevada Governor Steve Sisolak.

The $150 million ballpark is expected to attract even more people to Summerlin, which drew 18 million visitors last year. Image: Howard Hughes Corporation

 

Las Vegas Ballpark, which sits on 7.65 acres, was designed by HOK and built by a joint venture of AECOM Hunt and Penta Building Group. From groundbreaking, the stadium took about 13 months to complete. It includes 22 suites, 400 club-level seats and 350 party-deck seats. Howard Hughes Corporation claims that the Aviators are the first team in any sport with a home field that features 4Topps Premium Seating’s breathable AirFlow Mesh seats.

The ballpark also has the largest LED video screen in Minor League Baseball. The screen, designed by South Dakota-based Daktronics, is 31-ft high by 126-ft wide, with a 13-HD pixel layout. Two ribbon displays measure 3.5-ft high by 90-ft wide and feature a 15-HD pixel layout.

 

Related Stories

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

AEC Tech | Dec 17, 2020

The Weekly show: The future of eSports facilities, meet the National Institute for AI in Construction

The December 17 episode of BD+C's The Weekly is available for viewing on demand. 

Giants 400 | Dec 16, 2020

Download a PDF of all 2020 Giants 400 Rankings

This 70-page PDF features AEC firm rankings across 51 building sectors, disciplines, and specialty services.

Giants 400 | Dec 3, 2020

2020 Sports Facilities Sector Giants: Top architecture, engineering, and construction firms in the U.S. sports facilities sector

Kimley-Horn, Mortenson, and Populous top BD+C's rankings of the nation's largest sports facilities sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

AEC Tech | Nov 12, 2020

The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage

BD+C editors speak with experts from ALICE Technologies, Build Group, Hastings Architecture, Nvidia, and Woods Bagot on the November 12 episode of "The Weekly." The episode is available for viewing on demand.

Building Team Awards | Nov 2, 2020

Fans come first at Allianz Field

The new home of the Minnesota United soccer club wins a Silver Award in BD+C’s 2020 Building Team Awards. 

Giants 400 | Aug 28, 2020

2020 Giants 400 Report: Ranking the nation's largest architecture, engineering, and construction firms

The 2020 Giants 400 Report features more than 130 rankings across 25 building sectors and specialty categories.

Sports and Recreational Facilities | Jul 9, 2020

Florida Gators’ $65 million baseball field completes

Populous and Walker Architects designed the project.

boombox1 - default
boombox2 -
native1 -

More In Category


Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.


Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021