flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Modeling tool helps compare options for HVAC systems when little known about a building

Codes and Standards

Modeling tool helps compare options for HVAC systems when little known about a building

Compares projected costs and energy usage for all HVAC systems and hot water consumption.


By Peter Fabris, Contributing Editor | January 25, 2022
Commercial building

Courtesy Pixabay

Version 6.0 of the Building Efficiency System Tool (BEST), a commercial building HVAC system efficiency comparison application, is now available.

The Hydronic Industry Alliance-Commercial (HIA-C), a committee of the Radiant Professionals Alliance (RPA), recently released the update that helps compare options for HVAC systems at an early design stage when little information is known about the building. The tool can compare projected costs and energy usage for all HVAC systems and hot water consumption in any building “based on what is known before money is spent on selecting the HVAC and water heating systems, and (at a stage when) almost all inputs may be adjusted once the design process begins,” according to a news release.

The tool can model multiple heating and cooling sources including all electric systems using cascaded heat pumps and backup sources. “With the trend to all-electric solutions—including cascading heat pump systems—BEST is able to quickly and easily compare these innovative ideas,” says Greg Cunniff, P.E., director of Applied Solutions for Williams Comfort Products. “Legacy modeling software currently has a difficult time comparing these new ideas.”

The revised tool is available at no charge at: http://forms.iapmo.org/hiac/software_register.aspx

Related Stories

| May 17, 2012

California Governor orders new green standards on state buildings

California Gov. Jerry Brown issued an executive order recently that calls for all new or renovated state buildings of more than 10,000 sf to achieve LEED Silver or higher and incorporate clean, onsite power generation.

| May 17, 2012

New Zealand stadium roof collapse blamed on snow, construction defects

Heavy snowfall, construction defects, and design problems contributed to the collapse of the Stadium Southland roof in New Zealand in September 2010, a report has found.

| May 17, 2012

OSHA launches fall prevention campaign

The Occupational Safety and Health Administration (OSHA) recently launched an educational campaign to prevent deadly falls in the construction industry.

| May 15, 2012

Suffolk selected for Rosenwald Elementary modernization project

The 314-student station elementary school will undergo extensive modernization.

| May 10, 2012

Chapter 6 Energy Codes + Reconstructed Buildings: 2012 and Beyond

Our experts analyze the next generation of energy and green building codes and how they impact reconstruction.

| May 10, 2012

Resilience should be considered a sustainability factor

Since a sustainable building is one you don't have to rebuild, some building sustainability experts believe adding points for "resilience" to storms and earthquakes to the LEED sustainability rating tool makes sense.

| May 10, 2012

University of Michigan research project pushes envelope on green design

A research project underway at the University of Michigan will test the potential of intelligent building envelopes that are capable of monitoring weather, daylight, and occupant use to manage heating, cooling, and lighting.

| May 10, 2012

Fire suppression agents go greener

Environmental sensitivity is helping to drive adoption of new fire suppression agents.

| May 10, 2012

Industry groups urge Congress to leave contracting decisions to agencies

An organization of several industry groups urged Congress to leave many contracting decisions to the discretion of individual agencies by avoiding blanket mandates.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021