flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

MLS stadium design unveiled for St. Louis

Sports and Recreational Facilities

MLS stadium design unveiled for St. Louis

Plans capitalize on league’s plans to expand.


By Jonathan Barnes, Contributing Editor | April 24, 2019

With sweeping views to the north and east, allowing sightlines into St. Louis's Downtown West District neighborhood, a proposed MLS soccer stadium for the city could be the next anchor in its ongoing downtown revitalization. All renderings courtesy HOK and Snow Kreilich

When it comes to the ongoing downtown revitalizations in cities throughout the nation, destination points always are part of such plans, since they bring in visitors. A good downtown revitalization always includes a sports stadium or two, since such spots create a vitality that radiates out into the neighborhood surrounding it.

In St. Louis, plans for a proposed Major League soccer stadium downtown are meant to build upon the success of recent developments there. The design plans dovetail into plans of the MLS league to expand to 30 teams.

Recently, MLS4TheLou released a conceptual design of the Major League Soccer Stadium that the booster group would like to see built in the city. The mixed-use, soccer-specific stadium will have a capacity of 22,500 to 25,500 visitors. Fans will be able to enter the stadium from all sides of the facility. A large entry plaza will serve at different times as a pre-game or post-game gathering spot for fans. The stadiums’s pitch will extend 40 feet below ground level—which will provide a unique sports viewer experience. The design plans resulted from a whirl of activity by organizers of the stadium push.

 

 

“It has been an amazing 36 hours for our effort to bring an MLS team to St. Louis. With Major League Soccer’s announcement that the league will expand to 30 teams, combined with being able to share our initial stadium design plan, we are inching closer to making this a reality for St. Louis,” says Carolyn Kindle Betz.

 

See Also: HKS unveils retractable-roof ballpark in Japan

 

The stadium will be configured so that it is open to the north and east, offering views of the Downtown West District neighborhood. Adjacent to the stadium, as part of the development, will be a grouping of mixed-use buildings and restaurants, which will add more character and definition to the surrounding neighborhood. The design concept for the stadium was partly informed by researching what many others have done in developing their city’s soccer stadium. 

 

 

“Over the last six months, we’ve visited numerous MLS stadiums to review designs and learn best practices in order to be as thoughtful as possible to our proposed stadium here in St. Louis,” Kindle Betz says. “While they’re still a work-in-progress, we’re excited to finally give fans a glimpse at our proposed stadium.”

The design plans will bolster St. Louis’s chances of winning a new MLS team. Such a team would have about 20 regular season games and three exhibitions per season and be capable of hosting concerts and other events. The ownership group has been working with the partnership of HOK and Julie Snow, co-founder of Snow Kreilich Architects, as the design team helping to shape the initial vision of this project.

 

 

Related Stories

| Aug 11, 2010

Webcor, Hunt Construction lead the way in mixed-use construction, according to BD+C's Giants 300 report

A ranking of the Top 30 Mixed-Use Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Report: Fraud levels fall for construction industry, but companies still losing $6.4 million on average

The global construction, engineering and infrastructure industry saw a significant decline in fraud activity with companies losing an average of $6.4 million over the last three years, according to the latest edition of the Kroll Annual Global Fraud Report, released today at the Association of Corporate Counsel’s 2009 Annual Meeting in Boston. This new figure represents less than half of last year’s amount of $14.2 million.

| Aug 11, 2010

Jacobs, HDR top BD+C's ranking of the nation's 100 largest institutional building design firms

A ranking of the Top 100 Institutional Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Draft NIST report on Cowboys practice facility collapse released for public comment

A fabric-covered, steel frame practice facility owned by the National Football League’s Dallas Cowboys collapsed under wind loads significantly less than those required under applicable design standards, according to a report released today for public comment by the Commerce Department's National Institute of Standards and Technology (NIST).

| Aug 11, 2010

Recreation facility scores with sustainable features

A new $79.1 million health and learning center is under construction on the Northern Arizona University campus in Flagstaff. The 270,000-sf facility will house recreation space, classrooms, health and counseling services, and the Lumberjack Stadium for track and soccer teams. Designed by the Phoenix office of OWP/P Cannon Design with Mortenson Construction as CM, the project is aiming for LEED ...

| Aug 11, 2010

And the world's tallest building is…

At more than 2,600 feet high, the Burj Dubai (right) can still lay claim to the title of world's tallest building—although like all other super-tall buildings, its exact height will have to be recalculated now that the Council on Tall Buildings and Urban Habitat (CTBUH) announced a change to its height criteria.

| Aug 11, 2010

TCF Bank Stadium first new football stadium to get LEED certification

The University of Minnesota has received LEED Silver certification for its 50,805-seat TCF Bank Stadium, making it the first new football stadium in the country to achieve LEED status. Designed by Populous, Kansas City, Mo., the facility features a stormwater management system that captures and stores rainwater in an underground filtering system, where it is harvested, filtered, and drained int...

| Aug 11, 2010

Construction begins on Louisiana State Sports Hall of Fame

Heavy construction and foundation work has started on the new Louisiana State Sports Hall of Fame and Regional History Museum in Natchitoches, La. Designed by Trahan Architects, Baton Rouge, the $12 million, 28,000-sf museum will be clad in sinker cypress planks as a nod to the region’s rich timber legacy and to help control light, views, and ventilation throughout the facility.

| Aug 11, 2010

Modest recession for education construction

Construction spending for education expanded modestly but steadily through March, while at the same time growth for other institutional construction had stalled earlier in 2009. Education spending is now at or near the peak for this building cycle. The value of education starts is off 9% year-to-date compared to 2008.

| Aug 11, 2010

Great Solutions: Green Building

27. Next-Generation Green Roofs Sprout up in New York New York is not particularly known for its green roofs, but two recent projects may put the Big Apple on the map. In spring 2010, the Lincoln Center for the Performing Arts will debut one of the nation's first fully walkable green roofs. Located across from the Juilliard School in Lincoln Center's North Plaza, Illumination Lawn will consist ...

boombox1 - default
boombox2 -
native1 -

More In Category


Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.


Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021