In Miami, construction of OKO Group and Cain International’s 830 Brickell office tower is nearing completion. The building’s general contractor, Civic Construction, recently topped off construction at 55 stories. When complete later this year, the 724-foot-tall tower will be the first standalone office tower developed in Miami’s urban core in more than a decade, according to a statement from the developers.
Located in Miami’s Brickell Financial District, 830 Brickell was designed by architecture firm Adrian Smith + Gordon Gill, with interiors by Italian architecture and design company Iosa Ghini Associati. Over 60% leased, 830 Brickell has attracted tenants such as Microsoft, Thoma Bravo, A-CAP, CI Financial, Marsh Insurance, AerCap, and WeWork.
The tower’s hotel-style amenities include a rooftop bar/lounge and restaurant that offer views of the City and Biscayne Bay, a health and wellness center, an outdoor terrace, cafés, street-level retail, and conferencing facilities. Together with the developers, the building’s designers have incorporated pandemic-informed features such as ultraviolet lighting in air filtration systems, touchless technologies, and ultraviolet germicidal irradiation (UVGI) sanitation.
830 Brickell’s exterior has over 1 million square feet of uninterrupted glass. Serving as the tower’s podium, an eight-story parking garage is wrapped in a kinetic wall: a sprawling sheet of aluminum squares that move in the wind, reflecting the neighborhood’s movement and light. Nearby transit options include Metrorail and Metromover, the Brightline, walking paths, cycling lanes, and bay access points.
On the Building Team:
Developer: OKO Group and Cain International
Design architect: Adrian Smith + Gordon Gill Architecture
Interior design: Iosa Ghini Associati
Landscape architect: Enea Landscape Architecture
Executive architect: Revuelta Architecture International
General contractor: Civic Construction
Related Stories
| Dec 12, 2011
Mojo Stumer takes top honors at AIA Long Island Design Awards
Firm's TriBeCa Loft wins "Archi" for interior design.
| Dec 10, 2011
10 Great Solutions
The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.
| Dec 10, 2011
Energy performance starts at the building envelope
Rainscreen system installed at the west building expansion of the University of Arizona’s Meinel Optical Sciences Center in Tucson, with its folded glass wall and copper-paneled, breathable cladding over precast concrete.
| Dec 10, 2011
Turning Balconies Outside In
Operable glass balcony glazing systems provide solution to increase usable space in residential and commercial structures.
| Dec 10, 2011
BIM tools to make your project easier to manage
Two innovations—program manager Gafcon’s SharePoint360 project management platform and a new BIM “wall creator” add-on developed by ClarkDietrich Building Systems for use with the Revit BIM platform and construction consultant—show how fabricators and owner’s reps are stepping in to fill the gaps between construction and design that can typically be exposed by working with a 3D model.
| Dec 9, 2011
BEST AEC FIRMS 2011: EYP Architecture & Engineering
Expertise-Driven Design: At EYP Architecture & Engineering, growing the business goes hand in hand with growing the firm’s people.
| Dec 8, 2011
HDR opens office in Shanghai
The office, located in the Chong Hing Finance Center in Shanghai’s busy Huangpu District, will support HDR’s design efforts throughout Asia.
| Dec 8, 2011
HOK elevates the green office standard
Firm achieves LEED Platinum certification in New York office that overlooks Bryant Park.
| Dec 6, 2011
?ThyssenKrupp acquires Sterling Elevators Services
The acquisition of Sterling Elevator Services Corporation is the third acquisition completed by ThyssenKrupp Elevator AG in the last three months in North America.
| Dec 6, 2011
New office building features largest solar panel system in New Orleans
Woodward Design+Build celebrates grand opening of new green headquarters in Central City.