flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Metal composite materials engineer sound and inspire bold designs

Sponsored Content University Buildings

Metal composite materials engineer sound and inspire bold designs


By ALPOLIC Metal Composite Materials | May 7, 2018

Kites made from ALPOLIC metal composite material with fire retardant core hang from the ceilings in the Voxman Music Building at the University of Iowa. Photo credit: Mitchell Stier

High vaulted ceilings are a challenge to acoustical engineers looking to control, direct and amplify sounds to create a dynamic listening experience. LMN Architects approached the design for the new Voxman Music Building at the University of Iowa with an acute understanding of the construction limitations. They needed lightweight, yet rigid material that could be fabricated and hung in the open space in order to provide the right acoustics, integrate in the lighting and fire safety systems, and provide an inspiring experience true to their bold vision.

Metal composite material proved to be the perfect solution for this complex problem. In partnership with fabricators at Shaffner Heaney Associates, Inc, 6mm-thick ALPOLIC®/fr Metal Composite Material (MCM) was designed, fabricated, and installed to meet all engineering concerns and exceed the design expectation in bringing colorful swarms of kites to life.

Throughout the design process, the LMN Tech Studio employed a 3D parametric model to simulate how ALPOLIC® MCM could best provide sound scattering and absorption at the Voxman. The end result helps university musicians achieve the desired acoustic effects during performance.

 

The kites add rich color and functionality to music rooms without interfering with hanging lights and fire sprinkler systems. Photo credit: Mitchell Stier

 

To create the 946 detailed components adorning the high ceilings of Voxman’s main music hall and two large rehearsal rooms, Shaffer Heaney fabricator Mark Haab and his team digitally cut 36,000 square feet of ALPOLIC® with a fire retardant core. The unique installation also permitted other systems - lighting and fire sprinklers - to penetrate without interfering in the overall look of the design. "It was unlike any composite job we've done or seen anyone else do, and we knew it was something special the minute we saw the architect's plans," said Haab.

Six different colors, four of which were custom, all using Lumiflon® FEVE resin, add a touch of brilliance to the spaces within the building. While these aluminum "kites" appear to float in the sky, much the like the music filling the rooms, they contribute important elements to the functionality of the music rooms.

“This process and ALPOLIC® MCM has really become a calling card for us,” said Steven Van Dyck of LMN Architects. “We’re exploring and find we can make it do almost anything.”

"It's really a masterpiece, from the architect’s concept through the execution," said Haab of the overall project. "We took something that was very challenging and unique and out of the box and got it done."
 

Project Details: University of Iowa, Voxman Music Building

Location: Iowa City, Iowa

Fabricator: Shaffner Heaney

Architect: LMN Architects

Exterior Panel Manufacturer: ALPOLIC® Materials | Mitsubishi Chemical Composites America, Inc.

Product: 6mm, ALPOLIC/fr®

Coating: Custom Colors

Industry: Education

Related Stories

| Aug 11, 2010

PCL Construction, HITT Contracting among nation's largest commercial building contractors, according to BD+C's Giants 300 report

A ranking of the Top 50 Commercial Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Webcor, Hunt Construction lead the way in mixed-use construction, according to BD+C's Giants 300 report

A ranking of the Top 30 Mixed-Use Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Jacobs, HDR top BD+C's ranking of the nation's 100 largest institutional building design firms

A ranking of the Top 100 Institutional Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Polshek Partnership unveils design for University of North Texas business building

New York-based architect Polshek Partnership today unveiled its design scheme for the $70 million Business Leadership Building at the University of North Texas in Denton. Designed to provide UNT’s 5,400-plus business majors the highest level of academic instruction and professional training, the 180,000-sf facility will include an open atrium, an internet café, and numerous study and tutoring rooms—all designed to help develop a spirit of collaboration and team-oriented focus.

| Aug 11, 2010

UCLA to get more graduate housing

The University of California, Los Angeles, has begun a new graduate housing project that will occupy 275,000 sf of the campus. The Wayburn Terrace Graduate Housing Project, led by California-based construction management and consulting firm Gafcon, includes a residential building comprising 500 studio apartments, a commons building, and administrative offices.

| Aug 11, 2010

Fashion school gives old building a make over

A new art facility for LIM, the College for the Business of Fashion, in midtown Manhattan is the result of a gut renovation of a six-story townhouse-school built in 1880. The new facility will continue LIM's mission of educating undergraduates on the business side of fashion. Architecture firm Butler Rogers Baskett transformed the old building's claustrophobic layout into a modern, multifunctio...

| Aug 11, 2010

Biomedical center to join London's research scene

The UK Centre for Medical Research and Innovation, a partnership of scientific organizations researching new treatments for illnesses such as cancer and heart disease, hopes to attract leading medical scientists to its planned research center. Designed by HOK London, the building will be located on 3.

| Aug 11, 2010

San Diego Mesa College enhances math and science facilities

A $92 million, 180,000-sf instructional center soon will rise at the heart of San Diego Mesa College in California. Slated to open in November 2012, the Math and Science Building will be funded by Propositions S and N construction bond program. The blueprint calls for four floors of classrooms, laboratory space, and offices for several science departments.

| Aug 11, 2010

Tufts University puts bite into new dental school addition

The recently dedicated Tufts University School of Dental Medicine, in Boston, represents the culmination of a 22-month vertical expansion of the school's original 1972 building. The $68 million project involved constructing five new stories totaling 95,000 sf atop the building's existing 10 stories, which were also remodeled.

| Aug 11, 2010

Northeast Lakeview College opens in Texas, to serve 15,000 students

After four years of construction, Northeast Lakeview College, the newest addition to Alamo Colleges, is complete. Designed by Overland Partners Architects in collaboration with Ford Powell & Carson, the nine-building, 285-acre campus in Universal City, near San Antonio, will serve up to 15,000 students.

boombox1 - default
boombox2 -
native1 -

More In Category



Mass Timber

Bjarke Ingels Group designs a mass timber cube structure for the University of Kansas

Bjarke Ingels Group (BIG) and executive architect BNIM have unveiled their design for a new mass timber cube structure called the Makers’ KUbe for the University of Kansas School of Architecture & Design. A six-story, 50,000-sf building for learning and collaboration, the light-filled KUbe will house studio and teaching space, 3D-printing and robotic labs, and a ground-level cafe, all organized around a central core.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021