flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Massachusetts creates Commission on Clean Heat

Codes and Standards

Massachusetts creates Commission on Clean Heat

First-of-its kind body to set targets for buildings to reduce emissions from heating fuels.


By Peter Fabris, Contributing Editor | September 28, 2021
Boston, Massachusetts

Courtesy Pixabay

Massachusetts Gov. Charlie Baker recently created the Commission on Clean Heat that will set targets for buildings to reduce emissions from heating fuels.

The board, the first such body in the nation, will further the state’s ambitious plans to reduce carbon emissions. The state has lacked specific pathways to achieve its goals, particularly regarding the heating of buildings.

According to a recent report by the Boston Globe, Massachusetts has been converting just hundreds of homes to electric heat per year when its climate plan called for 100,000 a year. Affordable housing officials will be included on the commission in an effort to make the transition from gas and oil heat to electric more equitable for those of modest means.

Nearly one-third of Massachusetts’ greenhouse gas emissions come from buildings. The commission is expected to establish a cap on emissions from heating fuels similar to what the state has done in the power sector.

Related Stories

| Dec 13, 2011

LEED-EB outpaces LEED for new construction

The U.S. Green Building Council's (USGBC's) LEED certifications for existing buildings standard is outpacing LEED for new buildings for the first time.

| Dec 13, 2011

Regulators charge pervasive abuse of construction workers in Connecticut

Federal and state regulators say they have uncovered what they call "widespread noncompliance" with minimum wage and overtime laws in Connecticut's construction industry.

| Dec 13, 2011

Philadelphia mayor signs order for project labor agreements

Philadelphia Mayor Michael Nutter signed an executive order establishing project labor agreements for major public works projects in Philadelphia.

| Dec 13, 2011

Improved code requirements for attic ventilation

The Roof Assembly Ventilation Coalition (RAVC) participated in the development of the code.

| Dec 12, 2011

LEED-EB Outpaces LEED for New Construction

The U.S. Green Building Council’s (USGBC’s) LEED certifications for existing buildings standard is outpacing LEED for new buildings for the first time.

| Dec 12, 2011

Philadelphia Mayor Signs Order for Project Labor Agreements

Philadelphia Mayor Michael Nutter signed an executive order establishing project labor agreements for major public works projects in Philadelphia.

| Dec 12, 2011

Improved Code Requirements for Attic Ventilation

The International Code Council (ICC) recently published the 2012 International Residential Code (IRC) that includes improved code requirements for balanced intake and exhaust for ventilated attics.

| Dec 12, 2011

DOE makes 2010 ASHRAE energy standard the reference for state energy codes

The U.S. Department of Energy (DOE) issued a ruling that establishes the 2010 American Society of Heating, Refrigerating and Air-Conditioning Engineers’ (ASHRAE’s) 2010 energy efficiency standard as the commercial building reference standard for state building energy codes.

| Dec 1, 2011

Chinese cabinet approves regulation to prevent fraud in construction bidding

China’s State Council approved a regulation to standardize bidding processes for construction and other business-related projects in order to prevent fraud and misconduct.

| Dec 1, 2011

More stringent efficiency codes driving growth in green building industry

Thanks partly to upgraded building codes, the building energy efficiency market will soar more than 50% between now and 2017 to $103.5 billion, according to Pike Research.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021