flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Mass timber high-rise project on hold in Portland, Ore.

Wood

Mass timber high-rise project on hold in Portland, Ore.

Inflation, escalating construction costs, and fluctuations in tax credit market are to blame for the Framework project being put on hold.


By Peter Fabris, Contributing Editor | July 23, 2018
Inflation, escalating construction costs, and fluctuations in tax credit market are to blame for the Framework project being put on hold.

Renderings: LEVER Architecture

Framework, a 12-story tall wood building planned for Portland, Ore., has been placed on hold for the foreseeable future.

The structure was billed as the first wood high-rise in the U.S. Initiated in 2014, the mixed-use project was said to push the boundaries of resilient and sustainable innovation.

Changing market conditions in the interim have impacted the project’s bottom line, according to a press release from the developer, The Framework Project, LLC. Inflation, escalating construction costs, and fluctuations in the tax credit market, all contributed to the postponement.

“Although beset with market challenges beyond our control, we are very proud of Framework’s achievements and the new standards we’ve established for the use of CLT in the U.S.,” said Anyeley Hallova, an official with the developer.

Framework was the recipient of a $1.5 million U.S. Tall Wood Building Prize to fund the research necessary to utilize wood products in mass timber high-rise construction ultimately resulting in permits approval for the project which has paved the way for a new wood construction economy. Framework has also won local and national awards in recognition of its innovative and sustainable design.

The Tall Wood Building Prize supported a rigorous 2-year research & development phase and performance-based review process. The result was global breakthroughs in structural, fire, and acoustical performance testing that proved tall mass timber buildings can comply with U.S. building code and paved the way for mass timber construction across the country.

Framework received building permit approvals from the State of Oregon and the City of Portland in June 2017, a milestone for the U.S. construction industry.

 

 

 

Tags

Related Stories

| Apr 26, 2012

Energy efficiency requirements heighten the importance of proper protection for roofing systems

Now more than ever, a well-insulated and well protected roof is critical in new or renovated commercial buildings.

| Apr 16, 2012

Drake joins EYP as science and technology project executive

Drake’s more than 30 years of diversified design and project delivery experience spans a broad range of complex building types.

| Feb 26, 2012

Milwaukee U-Haul facility receives LEED-CI Silver

The new elements of the facility now include: efficient lighting with day-lighting controls and occupancy sensors, a high-efficiency HVAC system used in conjunction with a newly constructed thermal envelope to help reduce energy consumption, and the installation of low-flow fixtures to reduce water consumption.

| Feb 10, 2012

Task force addresses questions regarding visually graded Southern Pine lumber

Answers address transition issues, how to obtain similar load-carrying capabilities, and why only some grades and sizes are affected at this time. 

| Feb 2, 2012

Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012

Winning projects will be featured in the May issue of BD+C. 

| Feb 1, 2012

New ways to work with wood

New products like cross-laminated timber are spurring interest in wood as a structural material.

| Jan 26, 2012

Hendrick Construction completes Osso Restaurant in Charlotte

Designed by François Fossard, Osso's upscale interior includes tapered, twisted decorative columns and an elegant fireplace in the center of the lounge. 

| Dec 20, 2011

BCA’s Best Practices in New Construction available online

This publicly available document is applicable to most building types and distills the long list of guidelines, and longer list of tasks, into easy-to-navigate activities that represent the ideal commissioning process.

| Dec 19, 2011

HGA renovates Rowing Center at Cornell University

Renovation provides state-of-the-art waterfront facility.

boombox1 - default
boombox2 -
native1 -

More In Category

Mass Timber

Bjarke Ingels Group designs a mass timber cube structure for the University of Kansas

Bjarke Ingels Group (BIG) and executive architect BNIM have unveiled their design for a new mass timber cube structure called the Makers’ KUbe for the University of Kansas School of Architecture & Design. A six-story, 50,000-sf building for learning and collaboration, the light-filled KUbe will house studio and teaching space, 3D-printing and robotic labs, and a ground-level cafe, all organized around a central core.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021