flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Manassas Museum renovated to reimagine a civic design & engage the community

Manassas Museum renovated to reimagine a civic design & engage the community

The museum initially opened as a temporary exhibit in 1974 and was later relocated to downtown Manassas in 1991.


By Malcolm Crumbley, Associate Editor | August 19, 2022
Manassas Museum ext 1 lead image
Courtesy GWWO Architects.

Manassas, VA has recently broken ground on an addition to its Manassas Museum. The museum initially opened as a temporary exhibit in 1974 and was later relocated to downtown Manassas in 1991. The addition is set to open in 2023 on the 150th anniversary of the Manassas community.

The Manassas Museum had already had a huge amount of significance in the Historic Downtown, providing space for education, conversation, and a regional connection in the community. As for the addition, the city partnered with GWWO Architects in order to reimagine a renewed civic design.

The renovation will transform the physical relationship between the museum and its lawn by removing an existing isolating courtyard wall. The addition will be situated to engage the community, fully activate the museum green space, and improve visitor flow. The expansion will elevate the museum’s presence, responding to its role as a significant piece of civic architecture while respecting the scale of the historic core and view of the building’s iconic cupola. Visible from the nearby train station, the expansion will attract new visitors to educate them on the story of Manassas.

The addition will flank the building’s existing wings and welcome those arriving downtown. Clad in pre-patinated copper, the form of the special exhibit hall opens to the park creating dynamic views that engage visitors and the community. Transparent glazing along the courtyard will create a continual dialogue between the museum and outdoor spaces. 

Renovations to the existing building include a new exhibit space with views into an expanded collections storage area. 

The 4,800-sf addition also includes:

  • A new exhibit hall
  • Offices
  • Support space
  • An administrative wing located opposite of the new exhibit hall
  • A re-envisioned courtyard and amphitheater
  • A new entry and corridors with exhibits

Museum sustainable best practices:

  • Bird-friendly glazing
  • Low-albedo roofing
  • LED lighting
  • Daylighting in all occupied spaces
  • Upgrades to high-efficiency mechanical with energy recovery

On the Building Team:
Owner/Developer: City of Manassas
Landscape Architect: RHI
MEP Engineer: Mueller Associates
Structural Engineer: Thornton Tomasetti
Civil Engineer: Ross-France
Cost Estimator: Forella Group
Geotechnical Engineer: Schnabel

Manassas Museum ext 2
Courtesy GWWO Architects.
Manassas Museum ext 3
Courtesy GWWO Architects.

 

Related Stories

Giants 400 | Oct 3, 2019

2019 Cultural Facility Giants Report: New libraries are all about community

The future of libraries is less about being quiet and more about hands-on learning and face-to-face interactions. This and more cultural sector trends from BD+C's 2019 Giants 300 Report.

Museums | Aug 21, 2019

Cincinnati Reds debut renovated Reds Hall of Fame and Museum

FRCH NELSON designed the project.

Museums | Aug 1, 2019

Foster + Partners wins competition for the expansion and remodeling of the Bilbao Fine Arts Museum

The design looks to reorient the museums towards the city.

Museums | Jul 29, 2019

A new museum debuts inside the Empire State Building

A $165 million, 10,000-sf museum opened on the second floor of the Empire State Building in New York City, completing the second of a four-phase “reimagining” of that building’s observatory experience, which draws four million visitors annually.

Museums | Jul 22, 2019

Berlin’s Museum Island receives its first new building in almost 100 years

David Chipperfield Architects designed the building.

Museums | Jul 10, 2019

CO2-neutral science museum to rise in Sweden

COBE designed the building.

Museums | Jun 28, 2019

OMA unveils design for New Museum's second gallery building

The building is being designed by Office for Metropolitan Architecture/Shohei Shigematsu in collaboration with Cooper Robertson.

Museums | Jun 18, 2019

Frank Lloyd Wright Trust announces new Visitor and Education Center

Architect John Ronan will design the building.

boombox1 - default
boombox2 -
native1 -

More In Category

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.




Museums

Nebraska’s Joslyn Art Museum to reopen this summer with new Snøhetta-designed pavilion

In Omaha, Neb., the Joslyn Art Museum, which displays art from ancient times to the present, has announced it will reopen on September 10, following the completion of its new 42,000-sf Rhonda & Howard Hawks Pavilion. Designed in collaboration with Snøhetta and Alley Poyner Macchietto Architecture, the Hawks Pavilion is part of a museum overhaul that will expand the gallery space by more than 40%.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021