flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Manassas Museum renovated to reimagine a civic design & engage the community

Manassas Museum renovated to reimagine a civic design & engage the community

The museum initially opened as a temporary exhibit in 1974 and was later relocated to downtown Manassas in 1991.


By Malcolm Crumbley, Associate Editor | August 19, 2022
Manassas Museum ext 1 lead image
Courtesy GWWO Architects.

Manassas, VA has recently broken ground on an addition to its Manassas Museum. The museum initially opened as a temporary exhibit in 1974 and was later relocated to downtown Manassas in 1991. The addition is set to open in 2023 on the 150th anniversary of the Manassas community.

The Manassas Museum had already had a huge amount of significance in the Historic Downtown, providing space for education, conversation, and a regional connection in the community. As for the addition, the city partnered with GWWO Architects in order to reimagine a renewed civic design.

The renovation will transform the physical relationship between the museum and its lawn by removing an existing isolating courtyard wall. The addition will be situated to engage the community, fully activate the museum green space, and improve visitor flow. The expansion will elevate the museum’s presence, responding to its role as a significant piece of civic architecture while respecting the scale of the historic core and view of the building’s iconic cupola. Visible from the nearby train station, the expansion will attract new visitors to educate them on the story of Manassas.

The addition will flank the building’s existing wings and welcome those arriving downtown. Clad in pre-patinated copper, the form of the special exhibit hall opens to the park creating dynamic views that engage visitors and the community. Transparent glazing along the courtyard will create a continual dialogue between the museum and outdoor spaces. 

Renovations to the existing building include a new exhibit space with views into an expanded collections storage area. 

The 4,800-sf addition also includes:

  • A new exhibit hall
  • Offices
  • Support space
  • An administrative wing located opposite of the new exhibit hall
  • A re-envisioned courtyard and amphitheater
  • A new entry and corridors with exhibits

Museum sustainable best practices:

  • Bird-friendly glazing
  • Low-albedo roofing
  • LED lighting
  • Daylighting in all occupied spaces
  • Upgrades to high-efficiency mechanical with energy recovery

On the Building Team:
Owner/Developer: City of Manassas
Landscape Architect: RHI
MEP Engineer: Mueller Associates
Structural Engineer: Thornton Tomasetti
Civil Engineer: Ross-France
Cost Estimator: Forella Group
Geotechnical Engineer: Schnabel

Manassas Museum ext 2
Courtesy GWWO Architects.
Manassas Museum ext 3
Courtesy GWWO Architects.

 

Related Stories

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

Reconstruction Awards | Dec 29, 2020

The reenvisioned Sazerac House: A delectable cocktail that's just perfect for the Big Easy

The 51,987-sf Sazerac House is an interactive cocktail museum, active distillery, corporate headquarters, and event venue, all under one roof, next to the historic French Quarter of New Orleans.

Giants 400 | Dec 16, 2020

Download a PDF of all 2020 Giants 400 Rankings

This 70-page PDF features AEC firm rankings across 51 building sectors, disciplines, and specialty services.

Museums | Nov 16, 2020

Design of the National Bonsai and Penjing Museum unveiled

Reed Hilderbrand and Trahan Architects designed the project.

Museums | Nov 12, 2020

The National Museum of the United States Army opens

SOM designed the building.

Museums | Nov 5, 2020

The Weekly show: Designing cannabis facilities, Bob Borson's Life of an Architect, museum design

BD+C editors speak with experts from Cooper Robertson, Life of an Architect, and MJ12 Design Studio on the November 5 episode of "The Weekly." The episode is available for viewing on demand.

Museums | Oct 15, 2020

A new museum at Princeton University designed as ‘a campus within a campus’

The building would double the size of the existing museum.

Cultural Facilities | Oct 13, 2020

Thailand’s Elephant Museum reinforces the bond between humans and beasts

The complex, in Surin Province, was built with 480,000 clay bricks.

boombox1 - default
boombox2 -
native1 -

More In Category

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.




Museums

Nebraska’s Joslyn Art Museum to reopen this summer with new Snøhetta-designed pavilion

In Omaha, Neb., the Joslyn Art Museum, which displays art from ancient times to the present, has announced it will reopen on September 10, following the completion of its new 42,000-sf Rhonda & Howard Hawks Pavilion. Designed in collaboration with Snøhetta and Alley Poyner Macchietto Architecture, the Hawks Pavilion is part of a museum overhaul that will expand the gallery space by more than 40%.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021