flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

​Make sure the money you save in VE isn't destroyed in a lawsuit

Sponsored Content Plumbing

​Make sure the money you save in VE isn't destroyed in a lawsuit

​Getting the PVC vs. Cast Iron choice right


By Charlotte Pipe | August 18, 2015
Boone Pickens Stadium, Oklahoma State University

Boone Pickens Stadium at Oklahoma State University (OSU), one of the largest building projects in recent NCAA history.

At Charlotte Pipe and Foundry, we know that the first item on everybody's Value Engineering (VE) checklist is Cast Iron Soil Pipe (CISP) to PVC for drain, waste and vent applications. We make both plumbing systems, and believe that the right material should be used for every application. But, under financial pressure, things can get tricky in the VE process. That's what happened with one of the largest building projects in recent NCAA history, the Boone Pickens Stadium at Oklahoma State University (OSU).

In 2011, two years after it opened, a break in a plastic drain pipe was found. An inspection of the rest of the system revealed fifteen other breaks. The football team was forced to abandon the facility for five months while contractors jackhammered through finished concrete floors to fix the problems.

Litigation was eventually settled in February 2015, for $700,000. The biggest portion of the settlement ($400,000) was paid by the firm that did the architectural, engineering and design work. The water heater manufacturer agreed to pay $125,000 of the settlement. Properly functioning temperature and pressure relief valves, which are standard on all water heaters or boilers, will discharge water up to 200 degrees Fahrenheit — 60 degrees higher than the 140 degree limit on PVC. Sadly, avoidable mistakes like these are more common than they should be.

PVC can be used successfully below ground, but it requires careful installation and soil prep per ASTM D2321. Also, PVC has specific temperature and hanger spacing requirements. In addition, it requires extra care and attention in plenum spaces and in fire wall penetrations.

To make sure that the particulars and intricacies of this choice aren't confusing, we have prepared a downloadable brochure and handy checklist. The brochure covers the benefits of both systems, and the checklist is a simple yes/no form to help you understand the full ramifications of a PVC versus CISP VE decision.

Download the brochure, checklist and more VE resources at charlottepipe.com/VE.

What happened at OSU was an avoidable tragedy. With a proper and thorough understanding of the strengths and weaknesses of PVC and CISP for your plumbing application, you can greatly reduce the chance of anything like this happening to you.

*Please note: Information for this case study was found in published media reports and public records.

Tags

Related Stories

| Apr 29, 2013

Chicago Faucets redesigns website, adds Product Configurator for mix-and-match components and savings calculator

Chicago Faucets has redesigned its website at chicagofaucets.com, which embodies the company's innovation and commitment to the growing needs of its customers.

| Mar 21, 2013

Sloan president Jim Allen makes the case for the business of building green at Congressional Briefing

“The business case for green building has been proven,” said Jim Allen, President and CEO of Sloan, at a recent Congressional Briefing on Capitol Hill in Washington DC. Mr. Allen was invited by the U.S. Green Building Council (USGBC) to give his unique perspective as an American manufacturer supplying products to the Green Building Industry on what the green building movement has meant to his company.

| Oct 12, 2012

New HyTronic Edge from Chicago Faucets brings funky, modern aesthetics to restrooms

The Edge spout is cast entirely from ECAST low-lead brass to meet current lead reduction requirements as well as the forthcoming 2014 federal lead reduction law.

| Jul 3, 2012

TOLK now called Dewberry

The renaming indicates a simplification in Dewberry’s corporate naming conventions.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 31, 2012

AIA Course: High-Efficiency Plumbing Systems for Commercial and Institutional Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

boombox1 - default
boombox2 -
native1 -

More In Category


Plumbing

EPA to revise criteria for WaterSense faucets and faucet accessories

The U.S. Environmental Protection Agency (EPA) plans to revise its criteria for faucets and faucet accessories to earn the WaterSense label. The specification launched in 2007; since then, most faucets now sold in the U.S. meet or exceed the current WaterSense maximum flow rate of 1.5 gallons per minute (gpm). 



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021