The largest public library renovation in Rhode Island’s history was celebrated earlier this month when the Providence Public Library (PPL) posted a 23-minute-long video that served as a virtual ribbon cutting, followed a few days later by a grand opening gala.
The 18-month-long, $29 million renovation transformed 84,000 sf inside a library wing that was built in 1953. (The library itself opened in 1878.) The project converted the building’s Empire Street entrance into a three-story atrium, which has been opened since July. (The library itself was open all summer.) Glass replaced interior walls to create an open and light-filled concept. The renovation added a 2,500-sf workshop/maker space. The wing’s 255-seat auditorium was decked out with a new light and sound system. Space specifically for teen interaction and for digital collections was included.
Also see: The virtual ribbon cutting
The renovation was completed in line with PPL’s ongoing THINK AGAIN Capital Campaign for transforming the library in response to the changing needs of its community. “These renovations are a game-changer for everyone visiting and using our beloved library,” says Jack Martin, PPL’s Executive Director. “Through this complete transformation, we now have a beautiful and welcoming facility that fully complements our free cultural, educational, and career development programs and services, while also enabling our many community partners to utilize our spaces and resources like never before.”
A three-story atrium is the library wing's new centerpiece.
OPENING DRAWS PRAISE
The ribbon cutting video—created by Eleven Design—featured encomiums from state and federal dignitaries, including Rhode Island Gov. Gina Raimondo, U.S. Sen. Jack Reed (for whom an “information commons” in the renovated wing is named), Providence Mayor Jorge Elorza, and Crosby Kemper, director of the federal Institute of Museum & Library Services.
designLAB Architects (dLAB) was the design architect on this project, whose other Building Team members included Bond Building Construction (GC), Ed Wojcik Architects, Simpson Gumpertz & Heger (engineering), Fisher Dachs Associates, AWA Lighting Designers, KVA Associates, Rist-Frost-Shumway Engineering, Structures Workshop, The Queastor Group, and Wil-Spec.
The renovation adds more space for collaboration, teen socializing, and even quiet.
The library’s furniture and fixtures were provided by Casewerks, Steelcase, AIS, The Steel Yard, and W. B. Mason. Wayfinding is provided by Graphic Innovations, Malcolm Grear Designers, and Orion.
The renovation’s funding includes just under $9 million from the state, and private donations that include $1 million from Roselyn Sinclair and $750,000 from the Champlin Foundation.
Related Stories
| May 19, 2014
What can architects learn from nature’s 3.8 billion years of experience?
In a new report, HOK and Biomimicry 3.8 partnered to study how lessons from the temperate broadleaf forest biome, which houses many of the world’s largest population centers, can inform the design of the built environment.
| May 13, 2014
19 industry groups team to promote resilient planning and building materials
The industry associations, with more than 700,000 members generating almost $1 trillion in GDP, have issued a joint statement on resilience, pushing design and building solutions for disaster mitigation.
| May 11, 2014
Final call for entries: 2014 Giants 300 survey
BD+C's 2014 Giants 300 survey forms are due Wednesday, May 21. Survey results will be published in our July 2014 issue. The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue.
| May 10, 2014
How your firm can gain an edge on university projects
Top administrators from five major universities describe how they are optimizing value on capital expenditures, financing, and design trends—and how their AEC partners can better serve them and other academic clients.
| May 9, 2014
New York Public Library scraps drastic renovation plans
The New York Public Library's controversial renovation, involving the removal of stacks from the Schwarzman building and the closing of the mid-Manhattan branch, has been dropped in favor of a less dramatic plan.
| Apr 29, 2014
USGBC launches real-time green building data dashboard
The online data visualization resource highlights green building data for each state and Washington, D.C.
| Apr 16, 2014
Upgrading windows: repair, refurbish, or retrofit [AIA course]
Building Teams must focus on a number of key decisions in order to arrive at the optimal solution: repair the windows in place, remove and refurbish them, or opt for full replacement.
| Apr 9, 2014
Steel decks: 11 tips for their proper use | BD+C
Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Mar 31, 2014
Extreme conversion: Soaring Canadian church transformed into contemporary library
Even before the St. Denys-du-Plateau Church was converted into a library, it was an unusual building, with a towering nave designed to mimic a huge tent inflated by the wind.