flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

The largest modular construction hotel project in New York City is starting to get pieced together

Modular Building

The largest modular construction hotel project in New York City is starting to get pieced together

The hotel’s 300 rooms are made from 210 prefabricated pods from Polcom Modular.


By David Malone, Associate Editor | January 12, 2017

Image courtesy Rinaldi Group

A new hotel being constructed at the intersection of Bowery and Delancey in New York City will stand as the largest modular hotel in the city once it is completed in March.

The 20-story, 300-room hotel being constructed at 189 Bowery comprises 210 prefabricated pods that were built in Poland by Polcom Modular and shipped to New York to be stacked.

Modular construction allows for improved quality control and also speeds up the construction process compared to traditional construction methods by two to five months. Additionally, according to Curbed New York, by using modular construction on the 185 Bowery hotel project the number of truck trips to the site can be reduced by 1,200 compared to traditional building methods.

The hotel will open to guests in mid-2017. CitizenM is co-developing the site with Brack Capital while Rinaldi Group is the project’s construction manager.

 

Related Stories

| Jul 18, 2014

Top Architecture Firms [2014 Giants 300 Report]

Gensler, Perkins+Will, NBBJ top Building Design+Construction's 2014 ranking of the largest architecture firms in the United States. 

| Jul 18, 2014

2014 Giants 300 Report

Building Design+Construction magazine's annual ranking the nation's largest architecture, engineering, and construction firms in the U.S.

| Jul 17, 2014

A harmful trade-off many U.S. green buildings make

The Urban Green Council addresses a concern that many "green" buildings in the U.S. have: poor insulation.

Sponsored | | Jul 17, 2014

A major hop forward

The construction of efficient metal buildings has helped Perrault Farms expand its hops-harvesting business.

| Jul 15, 2014

A look into the history of modular construction

Modular construction is more than a century old, and throughout its lifespan, the methods have been readapted to meet specific needs of different eras.

| Jul 9, 2014

The one misstep that could be slowing your company’s growth

Change. It’s inevitable. And success for any professional may very well depend on how well we adapt to it. SPONSORED CONTENT

| Jul 7, 2014

7 emerging design trends in brick buildings

From wild architectural shapes to unique color blends and pattern arrangements, these projects demonstrate the design possibilities of brick. 

| Jul 2, 2014

Emerging trends in commercial flooring

Rectangular tiles, digital graphic applications, the resurgence of terrazzo, and product transparency headline today’s commercial flooring trends.

| Jun 30, 2014

Gen X, not Baby Boomers, spending the most money on homes [infographic]

It turns out that Generation X, who have the highest incomes of the three generations surveyed, are paying the highest home payments and tend to have the largest households. 

| Jun 25, 2014

The best tall buildings of 2014

Four high-rise buildings from multiple continents have been selected as the best of their region. The best worldwide tall building will be announced November 6. 

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021