The construction firm Kraus-Anderson has been active in the multifamily sector in its home market of Minneapolis-St. Paul, having engaged six such residential projects in the past decade. Its latest completion is The Larking, a $100 million 16-story tower located in Minneapolis’ East Town district.
The 400,714-sf Larking, which ESG Architects designed and Kimley Horn engineered, is a mixed-use development with 341 market-rate apartments and seven penthouses, as well as a one-story Wells Fargo bank branch, 9,100 sf of street-level retail, and three levels of underground parking.
The building is targeting urban professionals with 35 floor plans—from a 402-sf micro apartment leasing for $1,430 per month to a 1,214-sf two-bed two-bath apartment leasing for $3,370, according to its website. Its design features floor-to-ceiling windows, wide-plank flooring, and exposed concrete ceilings and columns. Contributing to its live-work-play environment are a Sky Lounge, pool deck with 360-degree views of downtown, fitness and wellness center, sauna, golf simulator, pet spa, work-from-home suites, conference room, a catwalk library and community table seating, and “creation center.”
Kraus-Anderson provided development and construction services, and is The Larking’s landlord. “We feel The Larking will enhance downtown by bringing new neighbors and commercial offerings to the Elliot Park neighborhood and adding vibrancy to the overall downtown community,” Erica Arne, director of development for Kraus-Anderson, told Twin Cities Business.
Another of Kraus-Anderson’s multifamily projects, MODA at Raymond, a $44 million six-story building in St. Paul with 220 apartments, is scheduled to be completed this summer with 40-plus floor plans available. Ironically, to make way for this construction, a U.S. Bank branch that occupied the property had to come down.
Related Stories
| May 13, 2014
19 industry groups team to promote resilient planning and building materials
The industry associations, with more than 700,000 members generating almost $1 trillion in GDP, have issued a joint statement on resilience, pushing design and building solutions for disaster mitigation.
| May 12, 2014
The best of affordable housing: 4 projects honored with 2014 AIA/HUD Secretary Awards [slideshow]
The winners include two dramatic conversions of historic YMCA buildings into modern, affordable multifamily complexes.
| May 11, 2014
Final call for entries: 2014 Giants 300 survey
BD+C's 2014 Giants 300 survey forms are due Wednesday, May 21. Survey results will be published in our July 2014 issue. The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue.
| May 5, 2014
Toronto residential tower to feature drawer-like facade scheme
Some of the apartments in the new River City development will protrude from the building at different lengths, creating a drawer-like "push-pull" effect.
| May 2, 2014
Norwegian modular project set to be world's tallest timber-frame apartment building [slideshow]
A 14-story luxury apartment block in central Bergen, Norway, will be the world's tallest timber-framed multifamily project, at 49 meters (160 feet).
| May 1, 2014
Tight on space for multifamily? Check out this modular kitchen tower
The Clei Ecooking kitchen, recently rolled out at Milan's Salone de Mobile furniture fair, squeezes multiple appliances into a tiny footprint.
| Apr 30, 2014
Visiting Beijing's massive Chaoyang Park Plaza will be like 'moving through a urban forest'
Construction work has begun on the 120,000-sm mixed-use development, which was envisioned by MAD architects as a modern, urban forest.
| Apr 29, 2014
Best of Canada: 12 projects nab nation's top architectural prize [slideshow]
The conversion of a Mies van der Rohe-designed gas station and North Vancouver City Hall are among the recently completed projects to win the 2014 Governor General's Medal in Architecture.
| Apr 29, 2014
USGBC launches real-time green building data dashboard
The online data visualization resource highlights green building data for each state and Washington, D.C.
| Apr 23, 2014
Developers change gears at Atlantic Yards after high-rise modular proves difficult
At 32 stories, the B2 residential tower at Atlantic Yards has been widely lauded as a bellwether for modular construction. But only five floors have been completed in 18 months.