flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Koolhaas, OMA selected to design San Francisco high-rise residential tower

Koolhaas, OMA selected to design San Francisco high-rise residential tower

The project includes a 550-foot residential tower on one end of the block and two podium buildings and a row of townhouses filling the remainder of the property.


By BD+C Staff | March 18, 2014

Rem Koolhaas and his architecture firm, Office for Metropolitan Architecture (OMA), have been named lead architect for a 550-foot residential tower on Folsom Street in San Francisco.

OMA is teaming with developers Related California and Tenderloin Neighborhood Development Corp. on the project.

The team offered $72 million for the property, according the San Francisco Chronicle, outbidding two other groups for the rights to the property.

Led by OMA partner Shohei Shigematsu, the design features a tower on one end of the block with two podium buildings and a row of townhouses filling the remainder of the block, according to OMA.

The firm's New York office will serve as lead architect and master planner, in collaboration with Fougeron Architecture (low-rise/podium architect) and CMG Landscape (landscape architect). 

The property, called Transbay Block 8, is one of 11 parcels the city is selling to help fund the $4.5 billion Transbay Transit Center currently under construction, according to the San Francisco Chronicle.  

Related Stories

High-rise Construction | Mar 23, 2017

This speculative skyscraper would be suspended from an orbiting asteroid

Clouds Architecture, a New York-based architecture firm, has created a design to invert a skyscraper’s traditional earth-based foundation and replace it with a space-based supporting foundation from which the tower is suspended.

High-rise Construction | Mar 22, 2017

Porsche Design Tower is, unsurprisingly, a car lover’s dream

The idea behind the residential tower was to provide residents with a full single family home in the sky, complete with a private garage and pool.

High-rise Construction | Mar 20, 2017

The world’s longest skyscraper

As supertall skyscrapers continue to pop up around NYC, an architecture firm based in New York and Athens asks, ‘What if we substituted height with length?’

High-rise Construction | Mar 3, 2017

Detroit's tallest tower to rise at site of former J.L Hudson's Department Store

SHoP Architects and Hamilton Anderson Associates will design the 52-story building.

Mixed-Use | Mar 1, 2017

New hotel and residential tower coming to San Francisco’s Transbay neighborhood

The ground-up development will feature 255 hotel rooms and 69 residential units.

Mixed-Use | Feb 27, 2017

Tallest tower in Miami to begin construction in January 2019

The tower will reach a height of 1,049 feet, the maximum height permitted by the FAA in Miami.

High-rise Construction | Feb 17, 2017

What makes a supertall tower super?

As new technologies fuel the race to build higher, three primal drivers simultaneously enable progress and keep it in check.

High-rise Construction | Feb 17, 2017

Zaha Hadid Architects-designed building to have the world’s tallest atrium

A 190-meter atrium will rise the full height of the building between two twisting sections.

High-rise Construction | Feb 8, 2017

Shanghai Tower nabs three world records for its elevators

The second tallest building in the world is officially home to the world’s fastest elevator, the tallest elevator in a building, and the fastest double-deck elevator.

Office Buildings | Feb 8, 2017

London office building employs transitional forms to mediate between the varied heights of surrounding buildings

Friars Bridge Court will provide a transition between the unvarying height of the buildings to the south and the more varied heights of the northern buildings.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021