When completed in 2019, the HKS-designed L.A. Stadium at Hollywood Park will be the largest stadium in the NFL, covering about 3 acres and 3 million sf. The stadium will include permanent seating for 70,000 fans while offering the flexibility to expand to host more than 100,000 fans.
The new stadium will provide an outdoor feel thanks to its ethylene tetrafluoroethylene (ETFE) roof, the same material used for the Minnesota Vikings new stadium, which was also designed by HKS. The ETFE canopy will allow the venue to host events year-round and provide an outdoor feel while protecting guests from the elements.
A perforated metal skin, comprising more than 75,000 individual panels, curves around the stadium and the ETFE canopy and will create an open-air environment. Each panel will be uniquely sized and have a distinct perforation pattern. The metal skin stretches beyond just the stadium and also covers outdoor plaza spaces and ‘rooms’ to blur the lines between indoor and outdoor. Included in the stadium’s design are a performing arts center and a large public gardens.
The stadium is already slated to host Super Bowl LV in 2021. Turner and AECOM will lead the project’s construction and Kroenke Sports and Entertainment is managing and developing the project.
Courtesy of HKS
Courtesy of HKS
Related Stories
| Aug 11, 2010
Dream Fields, Lone Star Style
How important are athletic programs to U.S. school districts? Here's one leading indicator: In 2005, the National Football League sold 17 million tickets. That same year, America's high schools sold an estimated 225 million tickets to football games, according to the American Football Coaches Association.
| Aug 11, 2010
Giants 300 University Report
University construction spending is 13% higher than a year ago—mostly for residence halls and infrastructure on public campuses—and is expected to slip less than 5% over the next two years. However, the value of starts dropped about 10% in recent months and will not return to the 2007–08 peak for about two years.
| Aug 11, 2010
Nurturing the Community
The best seat in the house at the new Seahawks Stadium in Seattle isn't on the 50-yard line. It's in the southeast corner, at the very top of the upper bowl. "From there you have a corner-to-corner view of the field and an inspiring grasp of the surrounding city," says Kelly Kerns, project leader with architect/engineer Ellerbe Becket, Kansas City, Mo.
| Aug 11, 2010
Financial Wizardry Builds a Community
At 69 square miles, Vineland is New Jersey's largest city, at least in geographic area, and it has a rich history. It was established in 1861 as a planned community (well before there were such things) by the utopian Charles Landis. It was in Vineland that Dr. Thomas Welch found a way to preserve grape juice without fermenting it, creating a wine substitute for church use (the town was dry).
| Aug 11, 2010
Integrated Project Delivery builds a brave, new BIM world
Three-dimensional information, such as that provided by building information modeling, allows all members of the Building Team to visualize the many components of a project and how they work together. BIM and other 3D tools convey the idea and intent of the designer to the entire Building Team and lay the groundwork for integrated project delivery.
| Aug 11, 2010
Bronze Award: Alumni Gymnasium Renovation, Dartmouth College Hanover, N.H.
At a time when institutions of higher learning are spending tens of millions of dollars erecting massive, cutting-edge recreation and fitness centers, Dartmouth College in Hanover, N.H., decided to take a more modest, historical approach. Instead of building an ultra-grand new facility, the university chose to breathe new life into its landmark Alumni Gymnasium by transforming the outdated 99-y...