flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

GSA will likely shrink federal office space post-COVID

Codes and Standards

GSA will likely shrink federal office space post-COVID

Agency also needs to address maintenance backlog.


By Peter Fabris, Contributing Editor | November 12, 2021
modern office space

Courtesy Pixabay

The General Services Administration is likely to reduce the amount of office space the federal government uses over the next few years.

GSA’s administrator recently told a Congressional committee that 40% of its leases will expire over the next four years. That provides a chance to shift tenant agencies to properties the government owns, but maintenance is a key challenge.

Agencies could save $2 billion annually if they take advantage of the opportunity to move. GSA has saved $4.5 billion in lease costs to date through office consolidation, but many federal buildings have fallen into disrepair because of a lack of consistent funding for maintenance.

More than half of federal buildings in GSA’s portfolio are over 50 years old, and more than a quarter of them are over 75 years old. GSA needs to ensure designs of new federal buildings can be resilient to the impacts of climate change, one congressperson pointed out.

Related Stories

| Sep 14, 2012

Building codes should require continuous connection from roof to foundation, says IBHS chief

“One of the most effective ways to greatly increase a building’s strength and safety during hurricanes, tornadoes and straight-line windstorms is to be sure the building is tied together properly,” says Julie Rochman, president and CEO of the Insurance Institute for Business & Home Safety (IBHS).

| Sep 7, 2012

Related Companies and unions agree to wage-cutting deal on Hudson Yards

The Related Companies has won wage-cutting agreements with four dozen construction unions in its efforts to save money on the $15 billion development of Hudson Yards.

| Sep 7, 2012

Lorain, Ohio considers halting downtown construction while it works out development plan

Construction would stop downtown for six months while Lorain, Ohio officials consider a development plan for the city, according to new legislation.

| Sep 7, 2012

Business, labor groups push for easing of California’s Environmental Quality Act

Business and labor groups have combined forces to push for a change to California's Environmental Quality Act, specifically its complex review process for building and construction projects.

| Sep 7, 2012

Twenty years later, Florida contractors cite Hurricane Andrew as construction game-changer

Remarking on the 20th anniversary of Hurricane Andrew, which devastated south Florida; contractors are noting the storm’s impact on their industry—including the state’s adoption of tougher building codes.

| Sep 7, 2012

At risk for nine types of natural disasters, Texas trails most coastal states on building codes

Texas has the most diverse weather risk in the country, with exposure to nine different types of natural disasters.

| Aug 30, 2012

OSHA plans new crane-safety standards for demolition and underground work

The new rule will streamline OSHA’s standards by eliminating the separate cranes and derricks standard currently used for underground and demolition work.

| Aug 30, 2012

Federal government cancels defense contracts worth $2.15 billion

This action may foreshadow federal spending cuts scheduled for year's end if Congress takes no action on the federal budget.

| Aug 30, 2012

Public comment period is open for CRRC-1 standard

The CRRC-1 standard covers specimen preparation and test methods for measuring the initial and aged solar reflectance and thermal emittance of roofing products.

| Aug 30, 2012

LEED system's footprint reaches 2 billion sf, with 7 billion sf in the pipeline

About 7 billion more sf of commercial space is expected in the pipeline.

boombox1 - default
boombox2 -
native1 -

More In Category

MFPRO+ News

Florida condo market roiled by structural safety standards law

A Florida law enacted after the Surfside condo tower collapse is causing turmoil in the condominium market. The law, which requires buildings to meet certain structural safety standards, is forcing condo associations to assess hefty fees to make repairs on older properties. In some cases, the cost per unit runs into six figures.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021