The U.S. General Services Administration (GSA) has named Charles (Chuck) Hardy as GSA’s next Chief Architect, effective August 14, 2022.
A licensed architect, workplace strategist, and certified construction manager, Hardy’s career with GSA spans more than 31 years, beginning in GSA’s Great Lakes Region as an architect and project manager. He has since spent time in a variety of leadership positions in the Great Lakes Region and GSA’s Central Office in Washington, DC, including as Director of Design and Construction, and most recently, as GSA’s Acting Chief Architect.
As Chief Architect, Hardy will serve as a Senior Advisor to GSA Administrator Robin Carnahan, as well as to Public Buildings Service (PBS) Commissioner Nina Albert, on all matters related to federal architecture and design for GSA’s capital construction program. Additionally, his role will include administering GSA’s Design Excellence, historic preservation, and art-in-architecture programs.
“GSA’s Chief Architect is one of the most influential architectural roles in Government, and we are thrilled to have Chuck serve in this position,” said PBS Commissioner Nina Albert. “He brings the leadership and vision necessary to deliver on GSA’s mission of providing high-quality buildings and effective, sustainable workplaces to Federal agencies at the best value for the American taxpayer.”
Prior to joining GSA, Hardy was a practicing architect with firms in Florida, Colorado, and Illinois. He earned his professional degrees in architecture and environmental design from the University of Minnesota and holds certificates from the Harvard Graduate School of Design and The University of Texas McCombs School of Business. Hardy is also a retired officer of the U.S. Air Force, where he served as an intelligence officer.
Related Stories
| Nov 14, 2011
Summit Design+Build selected at GC for new Office Concepts headquarters
The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout.
| Nov 14, 2011
Griffin Electric completes electrical work at Cary Arts Center
The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.
| Nov 14, 2011
303 East 33rd Street building achieves LEED-NC
The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.
| Nov 14, 2011
VanSumeren appointed to Traco general manager
VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco.
| Nov 11, 2011
By the Numbers
What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.
| Nov 11, 2011
Streamline Design-build with BIM
How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.
| Nov 11, 2011
AIA: Engineered Brick + Masonry for Commercial Buildings
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Nov 11, 2011
How Your Firm Can Win Federal + Military Projects
The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.