Gloucester Cathedral, a building famous for hosting the Coronation of King Henry III, being the final resting place of King Edward II, and, more recently, appearing in three Harry Potter films and an episode of Sherlock, is set to become the oldest cathedral in the UK to install a commercial sized solar PV system on its roof.
Thanks to money from the Heritage Lottery Fund, Gloucester Cathedral is about to undergo a £6million development project with the installation of solar PV front and center. Mypower, a Gloucestershire-based company, was awarded the contract to add 150 solar panels to the roof of the Cathedral. Specifically, the panels will be added to the 30-meter high Nave roof, which was built almost 1,000 years ago, and will be impossible to see from the surrounding area.
The Church of England’s Shrinking the Footprint campaign wants to reduce its carbon emissions by 80% by 2050. The Cathedral’s new 42kW solar array will contribute to the overall goal of the Church of England by reducing energy costs by 25% for the historic structure.
There are some significant shading issues, however, due to the Cathedral’s design. Mypower used animated graphics to demonstrate the shading at different times of the day and year in order to find the right balance between capital cost and electricity yield.
In early October, Mypower will begin installing the panels with commissioning following four weeks later.
Related Stories
| Aug 14, 2013
Green Building Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest green design and construction firms.
| Jul 29, 2013
2013 Giants 300 Report
The editors of Building Design+Construction magazine present the findings of the annual Giants 300 Report, which ranks the leading firms in the AEC industry.
| Jul 19, 2013
Reconstruction Sector Construction Firms [2013 Giants 300 Report]
Structure Tone, DPR, Gilbane top Building Design+Construction's 2013 ranking of the largest reconstruction contractor and construction management firms in the U.S.
| Jul 19, 2013
Reconstruction Sector Engineering Firms [2013 Giants 300 Report]
URS, STV, Wiss Janney Elstner top Building Design+Construction's 2013 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.
| Jul 19, 2013
Reconstruction Sector Architecture Firms [2013 Giants 300 Report]
Stantec, HOK, HDR top Building Design+Construction's 2013 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.
| Jul 19, 2013
Renovation, adaptive reuse stay strong, providing fertile ground for growth [2013 Giants 300 Report]
Increasingly, owners recognize that existing buildings represent a considerable resource in embodied energy, which can often be leveraged for lower front-end costs and a faster turnaround than new construction.
| Jul 2, 2013
LEED v4 gets green light, will launch this fall
The U.S. Green Building Council membership has voted to adopt LEED v4, the next update to the world’s premier green building rating system.
| Jul 1, 2013
Report: Global construction market to reach $15 trillion by 2025
A new report released today forecasts the volume of construction output will grow by more than 70% to $15 trillion worldwide by 2025.
| Jun 28, 2013
Building owners cite BIM/VDC as 'most exciting trend' in facilities management, says Mortenson report
A recent survey of more than 60 building owners and facility management professionals by Mortenson Construction shows that BIM/VDC is top of mind among owner professionals.
| Jun 5, 2013
USGBC: Free LEED certification for projects in new markets
In an effort to accelerate sustainable development around the world, the U.S. Green Building Council is offering free LEED certification to the first projects to certify in the 112 countries where LEED has yet to take root.