flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Florida’s tallest building could begin construction next spring

Sports and Recreational Facilities

Florida’s tallest building could begin construction next spring

SkyRise Miami to offer some hair-raising attractions.


By John Caulfield, Senior Editor | October 30, 2018

SkyRise Miami is being positioned as a vertical theme park with a number of extreme rides and stunning vistas. Image: Berkowitz Development Group

SkyRise Miami, a 1,000-ft tall entertainment and observation tower, is set to begin construction in the first quarter of next year, according to Plaza Construction, which recently was chosen to build the structure by its developer Berkowitz Development Group.

Scheduled for completion in 2023, the SkyRise Miami, overlooking Biscayne Bay, would be the tallest building in Florida. It is being positioned as a vertical theme park that will draw more than three million visitors a year with multiple attractions that include:

•Skyplunge, a base-jumping feature where jumpers attached to a high-speed descent wire plummet at nearly 55 mph.

•Skydrop, where riders slowly ascend more than 600 ft and then drop 540 ft at free-fall speeds up to 95 mph.

•SkyRise Flying Theater, where up to 72 riders are secured in seats that, when the floor drops out, are suspended 40 ft in the air. A 4D simulator moves the seats in sync with a movie projection, supplemented by real special effects like wind and aromas. The ride will last six minutes.

•Skyway, which will bill itself as the world’s tallest rotating observation attraction.

•Skyfly, a zero-gravity tunnel that allows visitors to float to the top of the tower.

•Skywalk, where tethered strollers can walk out onto an open deck with no handrails, 908 ft above ground.

•Skyglide, whose transparent slide allows visitors to “glide” outside for a panoramic view of Miami.

•Skyledge, whose transparent skydeck cantilevers off of the structure’s outside wall, 866 ft above ground.

There will also be scenic boat cruises and virtual reality experiences available to visitors, as well as catering halls, restaurants, and nightclubs.

A sky deck, moving observation bubbles, and a ledge from which tethered visitors can hang are some of the ways people will be able to experience SkyRise Miami. Image: Berkowitz Development Group

 

Coconut Grove-based Berkowitz Development Group’s portfolio includes more than 1.5 million sf of office and retail building development. Its Building Team for SkyRise Miami, besides Plaza Construction, includes Arquitectonica (architect), Magnusson Klemenic Associates (SE and CE), Cosentini Associates (ME), gsmprjct° (exhibition design), and DVS (engineering consultant). Legends, a joint venture of the Dallas Cowboys and New York Yankees, will operate SkyRise Miami.

This is the eighth project that Plaza and Arquitectonica have worked on together.

Brad Meltzer, Plaza Construction’s CEO, tells BD+C that the tower’s unique design presents challenges. “The building is void of uses from the podium to almost 500 ft, making the planning of the structure more complicated,” he explains, adding that the structural steel and concrete design that’s being contemplated hasn’t been tried before in South Florida, and will require more upfront integration of fabricators and tradespeople in the planning process.

While some press reports have pegged SkyRise Miami’s construction cost as high as $400 million, Meltzer says those costs have yet to be finalized.

SkyRise Miami will be built on land that juts into Biscayne Bay. Image: Berkowitz Development Group.

 

Miami’s city commission and Miami voters approved SkyRise Miami in the Summer of 2014, but the project had been delayed by litigation.

Jeff Berkowitz, chairman and founder of Berkowitz Development Group, initially claimed that he could complete the tower without taxpayer money, but he subsequently applied for $15 million in economic development funding. A lawsuit attempted to block Miami-Dade from allocating $9 million in property taxes for SkyRise’s development and construction. Other suits accused the landowner of skirting competitive-bidding requirements, and objected to the tower on environmental grounds.

A 2015 Florida Supreme Court ruling in the developer’s favor effectively ended opposition to SkyRise moving forward.

Related Stories

| Apr 6, 2012

Perkins Eastman unveils Qatar mixed-use sports complex

Home stadium for Lekhwiya Club a vibrant addition to Doha’s architectural identity.

| Mar 6, 2012

EwingCole completes first design-build project for the USMA

The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.

| Mar 1, 2012

Bomel completes design-build parking complex at U.C. San Diego

The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level. 

| Feb 24, 2012

Skanska hires Tingle as senior VP and national director for its Sports Center of Excellence

Tingle has worked in the architecture and construction industries for more than 30 years, and for the last 23 years, he has focused primarily on large-scale sports construction projects

| Feb 2, 2012

Shawmut Design and Construction launches sports venues division

Expansion caps year of growth for Shawmut.

| Jan 31, 2012

Fusion Facilities: 8 reasons to consolidate multiple functions under one roof

‘Fusing’ multiple functions into a single building can make it greater than the sum of its parts. The first in a series  on the design and construction of university facilities.

| Nov 29, 2011

SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China

Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 9, 2011

Sika Sarnafil Roof Recycling Program recognized by Society of Plastics Engineers

Program leads the industry in recovering and recycling roofing membrane into new roofing products.

boombox1 - default
boombox2 -
native1 -

More In Category


Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.


Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021