flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

First phase of Presidium Waterford breaks ground in Austin, Texas

Multifamily Housing

First phase of Presidium Waterford breaks ground in Austin, Texas

O’Brien Architects and Dwell Design Studio are designing the project.


By David Malone, Associate Editor | March 15, 2021
Presidium Waterford exterior

Renderings courtesy Presidium

A new five- and six-story luxury apartment complex, dubbed Presidium Waterford, has broken ground on its first phase in Austin, Texas.

The 281,533-sf residential community will include 283-units in an open building design with plenty of natural light. Each apartment unit will include smart thermostats, smart lighting, and smart touchless unit and amenity entries that can be accessed through a single smartphone app. 

The community will also include environmentally-focused features such as increased insulate properties in the windows and exterior insulation, a 100% rainwater bio filtration system, energy-efficient appliances, and energy-efficient building systems. Innovative sanitation methods will be implemented through state-of-the-art air purification systems and touchless entry doors, faucets, and facility hardware.

 

Presidium waterford

 

Interior common spaces will provide guests and residents multiple cowering office lounges and a gym with spin and yoga studios that connect to the outdoor lawn. A large open-air courtyard with outdoor spaces, a resort-style pool, a water volleyball court, outdoor fireplaces, a fully amenities paseo, a Zen courtyard with fire fits, a shaded hammock grove, and a Bocce court are also included.

The development is located minutes from The Domain, Austin’s “second downtown,” at 183 and Waterford Centre Blvd. The first units are expected to be delivered by Dec. 2022.

Related Stories

| Aug 11, 2010

Architecture Billings Index flat in May, according to AIA

After a slight decline in April, the Architecture Billings Index was up a tenth of a point to 42.9 in May. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending. Any score above 50 indicates an increase in billings.

| Aug 11, 2010

Construction employment declined in 333 of 352 metro areas in June

Construction employment declined in all but 19 communities nationwide this June as compared to June-2008, according to a new analysis of metropolitan-area employment data released today by the Associated General Contractors of America.  The analysis shows that few places in America have been spared the widespread downturn in construction employment over the past year.

| Aug 11, 2010

Jacobs, Hensel Phelps among the nation's 50 largest design-build contractors

A ranking of the Top 50 Design-Build Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms

A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

10% of world's skyscraper construction on hold

Emporis, the largest provider of global building data worldwide, reported that 8.7% of all skyscrapers listed as "under construction" in its database had been put on hold. Most of these projects have been halted in the second half of 2008. According to Emporis statistics, the United States had been hit the worst: at the beginning of 2008, "Met 3" in Miami was the only U.S. skyscraper listed as being "on hold". In the second half of the year, 19 projects followed suit.

| Aug 11, 2010

Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report

A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Skanska completes $74 million Harbor Towers project six months ahead of schedule

Skanska USA Building Inc. announced the completion of a $74 million rehabilitation project at Harbor Towers, a 40-story luxury condominium complex comprising two towers located on Boston’s waterfront. Skanska served as Program Manager and oversaw the repair and replacement work that dramatically enhanced the reliability, cost-effectiveness, and energy efficiency of the buildings’ MEP systems.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021