flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Fenestration Alliance updates standard for mulled combination assemblies

Codes and Standards

Fenestration Alliance updates standard for mulled combination assemblies

Last updated in 2010, document describes procedures and requirements for air leakage, water resistance, and structural performance.


By Peter Fabris, Contributing Editor | February 1, 2021

Courtesy Pixabay

The Fenestration and Glazing Industry Alliance (FGIA) updated a mulled assemblies document: AAMA 450-20, Performance Rating Method for Mulled Combination Assemblies, Composite Units, and Other Mulled Fenestration Systems.

The document was last updated in 2010. The performance rating method describes procedures and requirements for determining the air leakage, water resistance, and structural performance of mulled fenestration systems.

The document includes test procedures and calculation procedures for determining the performance of mulled fenestration systems. Mulled fenestration systems may be factory assembled or assembled onsite with parts and instructions supplied by the product manufacturer.

“The North American Fenestration Standard says that ‘mullion ratings shall be determined according to the requirements and procedures of AAMA 450 for both composite units and mulled combination assemblies.’ However, until now, AAMA 450 provided no guidance for composite units,” said Dave Goldsmith (PlyGem), co-chair of the FGIA Requirements for Mulled and Combination Window Assembly Update Task Group. “This document will put powerful new tools into the hands of engineers to assist them in determining how to construct structurally sound and weatherproof fenestration products in the most economical ways, and should also drastically reduce the amount of testing required to validate a large variety of composite unit configurations,” Goldsmith said.

Related Stories

| Nov 10, 2011

California seismic codes spur flurry of hospital projects

New seismic requirements in California are helping to drive a flurry of new projects and retrofits in the state’s health care sector.

| Nov 10, 2011

Senate ready to repeal 3% withholding on government contracts

The U.S. Senate is set to approve legislation that would eliminate a law requiring federal, state, and local governments to withhold 3% of their payments to contractors and companies doing business with the government.

| Nov 10, 2011

New legislation aimed at improving energy efficiency in federal buildings

Recently introduced legislation, the “High-Performance Federal Buildings Act,” would help federal agencies save energy and money by improving building performance.

| Nov 4, 2011

CSI and ICC Evaluation Service agree to reference GreenFormat in ICC-ES Environmental Reports?

ICC-ES currently references CSI's MasterFormat and other formats in all of its evaluation reports. The MOU will add GreenFormat references.

| Nov 3, 2011

House Votes to Kill 3% Withholding Requirement; Senate Yet to Vote

The U.S. House of Representatives voted last week to repeal a 3% IRS withholding tax on businesses that do work for the government.

| Nov 3, 2011

OSHA Publishes Information on Rights and Safety

OSHA recently published new and revised information that explains workers’ and employers’ rights, as well as how to protect workers from hazards in the construction industry.

| Nov 3, 2011

Sierra Club Critical of Albuquerque Mayor’s Push to Weaken Green Code

The mayor’s plan to move to a less environmentally friendly code would mean confusion for people in the construction industry and a loss of energy efficiency and money for consumers, said Shrayas Jatkar of the Sierra Club.

| Nov 3, 2011

Lax Code Enforcement Blamed for Deaths in Turkey’s Earthquake

Despite tough safety codes approved a decade ago after earthquakes killed 18,000 people, lax enforcement led to hundreds of deaths after a recent earthquake in Turkey.

| Nov 3, 2011

International Green Construction Code Will Provide Template for Local Codes

A uniform code for green construction is being readied for publication in March.

| Oct 31, 2011

NIST issues new code requirements

Buildings taller than 420 feet are now required to include an extra exit stairwell or a specially designed elevator that occupants can use for evacuations.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021