flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Elegance personified: New life for a neglected but still imposing retail/office space

Reconstruction Awards

Elegance personified: New life for a neglected but still imposing retail/office space

The building was in such disrepair that much of the reconstruction budget had to go toward structural, mechanical, and electrical infrastructure improvements.


By John Caulfield, Senior Editor | November 17, 2017

Pittsburgh’s Union Trust Building occupies an entire city block, rising to 237 feet. Two Flemish-Gothic “chapels” on the roof house the building’s mechanical components. Photo: © Robert Benson.

The Union Trust Building, commissioned by coal magnate Henry Clay Frick and completed in 1917, originally was a 240-store shopping arcade with 700 offices on its upper floors.

This 11-story Flemish-Gothic–style building has had several owners. The latest, Pittsburgh native Jon Davis, CEO of The Davis Companies, paid $14 million in 2014 with the intention of revitalizing it into an amenities-rich commercial center.

The building was in such disrepair that much of the reconstruction budget had to go toward structural, mechanical, and electrical infrastructure improvements that included opening up deep floor plates and removing valances on windows (added long after the building first opened) to let in more daylight.

The limestone exterior was cleaned. The leaking mansard roof was repaired and restored. A new rooftop cooling system, hidden by a contemporary screen, was installed. Ten passenger elevators and two freight elevators were modernized.

Cross axes that emanate from a central rotunda split Union Trust’s cruciform-shaped design into four quadrants. The interior features a grand atrium topped by a Tiffany glass dome measuring 40 feet in diameter. The project team relit the dome to draw eyes upward. The rotunda, now with comfortable seating, serves as a greeting area for office tenants; it can also be rented for events.

More than 19,000 sf of New Zealand wool carpet was laid throughout the building, with color changes on different floors that coordinate with 30 pieces of art that were commissioned for the building.

Amenities include a new fitness center, a renovated seminar room and breakout area, a marketing center, and a concierge desk in the lobby. Parking for 190 vehicles was added in the basement and sub-basement. The National Park Service allowed for the addition of glass canopies at the exterior entries and exposed ductwork to achieve higher interior ceiling heights.

 

Project Summary

 

Gold Award Winner

Building Team: Elkus Manfredi Architects (submitting firm, design/interior architect) The Davis Companies (developer) Perfido Weiskopf Wagstaff + Goettel (executive architect) Wessling Architects (exterior restoration architect) Atlantic Engineering Services (SE) AHA Consulting Engineers (MEP) Van Duesen & Associates (elevator consultant) Heritage Consulting Group (preservation consultant) Powers & Company (historic preservation) Mascaro Construction (GC).

Details: 666,993 sf. Construction cost: Confidential. Construction time: May 2014 to November 2016. Delivery method: Design-bid-build.

 

See all of the 2017 Reconstruction Award winners here

Related Stories

Reconstruction Awards | Nov 12, 2018

Cincinnati Music Hall: Saving a cultural anchor

Cincinnati uses ‘skillful triage’ to bring its endangered Music Hall up to date.

Reconstruction Awards | Dec 1, 2017

Rescue mission: Historic movie palace is now the centerpiece of Baltimore’s burgeoning arts hub

In restoring the theater, the design team employed what it calls a “rescued ruin” preservation approach.

Reconstruction Awards | Dec 1, 2017

Gothic revival: The nation’s first residential college is meticulously restored

This project involved the renovation and restoration of the 57,000-sf hall, and the construction of a 4,200-sf addition.

Reconstruction Awards | Dec 1, 2017

Rockefeller remake: Iconic New York tower is modernized for its next life

To make way for new ground-floor retail and a more dramatic entrance and lobby, the team removed four columns at the ground floor.

Reconstruction Awards | Nov 30, 2017

BD+C's 2017 Reconstruction Award Winners

Provo City Center Temple, the Union Trust Building, and the General Motors Factory One are just a few of the projects recognized as 2017 Reconstruction Award winners.

Reconstruction Awards | Nov 29, 2017

College credit: Historic rehab saves 50% on energy costs

The project team conducted surveys of students, faculty, and staff to get their input.

Reconstruction Awards | Nov 29, 2017

Amazing grace: Renovation turns a church into elegant condos

The windows became The Sanctuary’s chief sales edge.

Reconstruction Awards | Nov 28, 2017

Broadway melody: Glass walls set just the right tone for a historic lobby in Lower Manhattan

The adaptation of the 45,000-sf neoclassical lobby at 195 Broadway created three retail spaces and a public walkway.

Reconstruction Awards | Nov 27, 2017

Higher education: The rebirth of a Washington, D.C., high school

The project team, led by architect Perkins Eastman, restored the original cupola.

Reconstruction Awards | Nov 27, 2017

Bank statement: A project team saves a historic bank, yielding 100% leaseup for the developer

The project team had to fix poor renovations made in the ’50s.

boombox1 - default
boombox2 -
native1 -

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021