flexiblefullpage -



billboard - default
interstitial1 - interstitial
catfish1 - bottom
Dec 9, 2012

Greenzone pop quiz

Greenbuild attendees share their thoughts with BD+C on the SAGE modular classroom.

Dec 9, 2012

Modular classroom building makes the grade

SAGE modular classroom opens eyes, minds at Greenbuild 2012.

Dec 5, 2012

Bernards selected to build new Merced, Calif. high school campus

Designed by BCA Architects, the $76 million, 220,000-ft project encompasses a total of nine buildings.

Nov 11, 2012

Greenbuild 2012 Report: K-12

High-performance schools put ‘sustainability’ in the lesson plan

Oct 5, 2012

2012 Reconstruction Award Special Recognition: Joplin Interim High School, Joplin, Mo.

At 5:41 p.m. CDT on Sunday, May 22, 2011, an EF5 tornado touched down in Joplin, Mo. In the next 31 minutes, the mile-wide, multiple-vortex tornado, with winds up to 250 mph, destroyed two thousand buildings, including Joplin High and nine other schools.

Sep 24, 2012

$3.8-million athletic field and track opens in Glen Head, N.Y.

The complex also includes a new, one-story, multi-purpose building that serves as the main entry port to the athletic facilities.

Aug 15, 2012

Skanska to build the Beacon High School in New York City

The Beacon High School will be located in the Hell’s Kitchen neighborhood of Manhattan.

Jul 25, 2012

KBE Building renovates UConn dining hall

Construction for McMahon Dining Hall will be completed in September 2012.

Jul 20, 2012

2012 Giants 300 Special Report

Ranking the leading firms in Architecture, Engineering, and Construction.

Jul 20, 2012

K-12 Schools Report: ‘A lot of pent-up need,’ with optimism for ’13

The Giants 300 Top 25 AEC Firms in the K-12 Schools Sector.

leaderboard1 - default