Duro-Last provides solution for Kentucky elementary school's leaky roof

Sponsored Content Roofing

Duro-Last provides solution for Kentucky elementary school's leaky roof

The assembly used for this project was Duro-Guard EPS Flute Fill Combo as the base, and then Duro-Guard ISO HD and DensDeck® cover boards. 


By Duro-Last | March 21, 2017

Contractor: JBK Roofing

Project: Lynn Camp Elementary School

Location: Corbin, Kentucky

Square Feet: 119,000

Products: Duro-Fleece®, Duro-Tuff® and Duro-Last® membranes; Vinyl Ribs; Duro-Guard® EPS Flute Fill Combo insulation; Duro-Guard ISO HD insulation, Duro-Guard DensDeck® cover boards, EXCEPTIONAL® Metals accessories and edge details, Duro-Grip® CR-20 adhesive; Duro-Caulk® Advanced

 

 

When roof leaks were starting to interfere with the daily activities of Lynn Camp Elementary School in Corbin, Kentucky, administrators knew it was time for a new roof.

“We had a situation in a lot of the rooms where tiles were molding because of the roof leaks,” said Anthony Pennington, Principal of Lynn Camp Schools. “It was becoming a constant distraction for not only our students but our teachers and their learning process.”

The existing standing seam metal section of the roof was a daunting task at more than 78,000 square feet, but its design and blue color was a look the school was hoping to maintain. However, the projected timeline to complete a metal roof of this size would be 9-12 months, well outside the school’s needs.

Time was of the essence for this project and when JBK Roofing presented a metal retrofit option using the Duro-Last Vinyl Rib system, school administrators knew they had found the right solution.

The assembly used for this project was Duro-Guard EPS Flute Fill Combo as the base, and then Duro-Guard ISO HD and DensDeck® cover boards. Duro-Fleece 50 mil membrane was adhered with Duro-Grip CR-20 adhesive and, lastly, the Vinyl Ribs were heat welded to the adhered membrane.

Being such a large roof, more than 52,000 liner feet of Vinyl Rib was used.

“This is by far the largest and most intense Vinyl Rib project we’ve done,” said Brandon Keck, President of JBK Roofing. “Even so, the Duro-Last system was extremely fast-paced and allowed us to fit in the school’s schedule, taking only 90 days to complete.”

The bright blue color of the Duro-Fleece membrane also gave the school the aesthetic look they wanted. “We wanted something cutting edge, we wanted something that would last a long time and would look amazing for our school,” Pennington said.

Related Stories

| Oct 26, 2011

Metl-Span selected for re-roof project

School remained in session during the renovation and it was important to minimize the disruption as much as possible.

| Oct 17, 2011

Aerialogics announces technology partnership with CertainTeed Corp.

  CertainTeed to provide Aerialogics’ Aerial Measurement Services to its credentialed contractor base and utilize the technology in its Roofing Products Division.

| Oct 5, 2011

GREENBUILD 2011: Roof hatch designed for energy efficiency

The cover features a specially designed EPDM finger-type gasket that ensures a positive seal with the curb to reduce air permeability and ensure energy performance. 

| Sep 27, 2011

Steel Joist Institute announces October webinar on Open Web Steel Joists

Webinar participants can earn 0.15 CEUs or 1.5 PDHs.

| Sep 14, 2011

USGBC L.A. Chapter's Green Gala features Jason McLennan as keynote speaker

The Los Angeles Chapter of the nonprofit USGBC will launch its Sustainable Innovation Awards this year during the chapter's 7th Annual Green Gala on Thursday, November 3.

| Sep 12, 2011

PVs play new roles as a teaching tool

Solar installations are helping K-12 schools around the country save money and teach students the intricacies of renewable energy sources.

| Sep 12, 2011

Putting a stamp on USPS's first green roof

The Morgan Building roof totals 150,000-sf. In addition to a vegetated green roof, other roof areas were upgraded and included 55,000-sf of reflective concrete pavers and ballast, which were also placed over a Sarnafil waterproofing membrane, and 40,000-sf of EnergySmart Roof—a reflective, energy-efficient vinyl roofing system from Sika Sarnafil.

| May 10, 2011

Sika Sarnafil introduces new roofing coating for existing roofs

Sika Sarnafil announced the availability of Sikacoat roof coatings, the latest addition to the company’s roofing product line and an economical solution to extend the life of existing roofing systems until a roof replacement is necessary. The Sikacoat roof coatings can be used over existing single ply roofing membranes, asphalt roof systems or metal roof systems.

boombox1 - default
boombox2 -
native1 -

More In Category


Standards

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021