University of Pittsburgh Medical Center (UPMC) Outpatient Center
University of Pittsburgh Medical Center (UPMC) Outpatient Center

The new 46,000-square-foot, state-of-the-art University of Pittsburgh Medical Center (UPMC) Outpatient Center in West Mifflin, Pennsylvania, is already living up to its mission of providing residents of Pittsburgh’s South Hills with convenient access to medical and surgical care, all under one roof. The facility boasts ample free parking, imaging services, office space for more than 20 specialties, and an outpatient surgery center. Additionally, the building will be LEED certified.

The existing structure was an old Toys “R” Us location that had been abandoned after the national chain filed for bankruptcy and shuttered its stores across the country. Although situated in a high- density commercial zone in Pittsburgh, not far from the now-defunct Century III Mall and other abandoned retails stores, the UPMC developers had a vision … give back to the community by converting this blighted, cinderblock retail space into a beautiful, environmentally sound medical facility, bringing patient care right to the heart of the community. 

To realize this aesthetic transformation, project architect Stantec looked to CENTRIA’s Formawall Dimension Series (FWDS) insulated wall panels (2” thick, 22-gauge) in an array of warm, earthy colors—Silver, Sedona, Clay, and Sienna—to provide the high-performance, modern aesthetic that would reinforce the brand of the health system.

Jim Routh, Principal at Stantec, explains the genesis of the transformation. He says, “UPMC challenged us to reimagine this windowless one-story retail facility into an airy, light-filled outpatient care center for their patients. The bold terra cotta colors of the exterior design draw attention to the re-imagined façades and announces UPMC’s investment into the surrounding community. Glass elements are strategically cut into the CENTRIA panels, providing natural daylight to the central patient area. The new façade has an almost billboard-like quality.”

The solution: Recladding the building without having to tear down any exterior walls. Routh explains, “I immediately thought of the CENTRIA panels. While the first consideration was definitely an aesthetic decision for UPMC marketing/branding and ease of wayfinding for patients, the cost savings and performance of the FWDS panels were also high priorities, making these panels an obvious choice for the recladding approach.”

UPMC

Routh notes that it was a fairly easy and quick installation. The entire project was a nine-month construction project, but the installation of the metal panels took approximately eight weeks total, allowing the contractor to concentrate on the more complicated components of the facility. “The contractor attached a simple, steel sub-girt system directly to the existing concrete block walls, and then installed the CENTRIA panels directly onto these sub-girts without the need for structural sheathing,” says Routh.

Benjamin Marnik, CENTRIA district sales manager, shares how the FWDS panels were the perfect answer to meet the project goals. He says, “The Formawall Dimension Series not only provided the aesthetic appearance that they required, but also provided the performance that they were looking for, which was the added insulation for the building exterior. There are a lot of products in the industry that provide one or the other, but rarely provide both, and that's something that is achieved with this particular product.”  

Routh adds, “Not only is the performance of the CENTRIA panels exceptional, but Ben’s customer service and knowledge of the product is second to none. Ben and I have been working together for over a decade, and I consider him to be a valuable design partner.”

As for the color palette, notes Routh, “UPMC is transforming patient care throughout the Pittsburgh region and beyond. They were looking for an aesthetic that supported their forward-looking vision.  The modern appearance of the multicolor metal panels seemed to resonate with them.”

UPMC

Marnik adds, “From a material standpoint, interestingly, the panels provide the impression of terra cotta, accomplished with CENTRIA's Allura Terra Cotta Series, which adds a matte finish with a subtle texture to match the color and texture of terra cotta. The finish itself contains a very mild aggregate, which allows for a finish with a much less reflective quality than you would have with a typical painted metal material, giving it more of that earthy feel. That’s one of the unique characteristics of the material used on the project.”

Additionally, the use of the CENTRIA insulated metal panels helped achieve energy performance requirements. Stantec was able to achieve required insulation values in the exterior walls as well as the roof, where CENTRIA exposed fastener panels (BR5-36) were used at the rooftop mechanical screen wall.

The facility, which had the extra challenge of being constructed mainly during the COVID-19 pandemic, opened on time in December 2020, thanks in part to the speed and ease of installation provided by the CENTRIA product line. Today, it is successfully up and running, meeting the health care needs of the local community.

 

Project Details
Project Name: UPMC Outpatient Center
Location: West Mifflin, PA
Architect: Stantec
Construction Manager: Rycon Construction, Inc.
Metal Panel Installer: A.C. Dellovade, Inc.

CENTRIA Products:
BR5-36 Exposed Fastening Panels- Medium Gray, 2943 sq. ft. 18 gauge
FWDS, 2” thick, 22 gauge, Silver, 2,548 sq. ft.
FWDS, 2” thick, 22 gauge, Sedona, 1,380 sq. ft.
FWDS, 2” thick, 22 gauge, Clay, 2,564 sq. ft.
FWDS, 2” thick, 22 gauge, Sienna, 1,936 sq. ft.

Related Stories

| Apr 17, 2014

6 details that can throw off your schedule

In 1997, Apple told us to “Think Different.” So we did. We thought about what could happen if the world went mobile, if information was boundless, if we could carry our office in our back pocket. We’ve grown to love different and to expect change. And when it comes to Apple products, that’s not such a bad thing. When it comes to your building order, however, it’s not nearly as appealing.

| Apr 9, 2014

Steel decks: 11 tips for their proper use | BD+C

Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.

| Apr 8, 2014

Reflecting on job number 61-001

Job number 61-001 changed everything. It was sold in 1961, a year of change for the nation and for Star. By January, John F. Kennedy would be president. By the end of the year, Star would launch a historic shift in our product and our distribution, a shift still active today.

| Mar 31, 2014

Tips for creating a competitive bid using codes and loads

Landing a project feels like winning a prize, sort of like finding that forgotten $20 bill in the pocket of a pair of jeans you haven’t worn in a while. But living on the “chance” of winning a job isn’t a great way to pay your electric bill. So, how do you swing the chances in your favor?

| Mar 26, 2014

A sales and service showcase

High Plains Equipment, a Case IH dealership in Devils Lake, N.D., constructs a larger facility to better serve its customers.

| Mar 19, 2014

Frames: the biggest value engineering tip

In every aspect of a metal building, you can tweak the cost by adjusting the finish, panel thickness, and panel profile. These changes might make a few percentage points difference in the cost. Change the framing and you have the opportunity to affect 10-20 percent savings to the metal building portion of the project.

| Mar 11, 2014

Why you should start with a builder, part three

We had worked together for 30 years. As a long-standing client of mine, he and I had gone through many projects together. And we were approaching another project, one that would forever change how he viewed our working relationship. As my customer and I sat down to talk about the project details, he told me something that would stay with me for weeks. “Kim, I’m going to have to get other bids on this just so I have peace of mind.”

Sponsored | | Mar 10, 2014

A high-performance barn

Bastoni Vineyards replaces a wooden barn with an efficient metal building used for maintenance, storage, and hosting events.

| Mar 4, 2014

CENTRIA Demonstrates Commitment to Contractors

New Brochure Highlights Architectural Metal Panel Manufacturer’s Products, Expertise and Experience

| Feb 27, 2014

Colorado Coalition Plans Welcoming Events for METALCON International Visitors

Visitors to the 24th METALCON International, slated for October 1-3 at the Colorado Convention Center in Denver, will get a royal welcome from local companies involved in the show. Denver-based New Tech Machinery and Colorado Springs-based S-5! Solutions have formed the Colorado Coalition as a way of encouraging visitors to learn about Colorado before they arrive and for Coloradans to experience METALCON.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021