flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

This is the country’s greenest academic building

Green

This is the country’s greenest academic building

Perkins+Will designed the building.


By David malone, Associate Editor | January 28, 2019
Chou Hall aerial shot

Courtesy Berkeley Haas Youtube

According to the University of California, Berkeley, Chou Hall, part of the Haas School of Business, has become the greenest academic building in the country thanks to its TRUE Platinum Zero Waste certification at the highest level and a LEED Platinum certification. Chou Hall is the only academic building in the country to achieve TRUE Platinum. To achieve TRUE Platinum, the Chou team earned 69 out of the 70 credits they applied for.

The six-story, 80,000-sf building, designed by Perkins+Will and opened in August 2017, earned the TRUE Platinum Zero Waste certification after more than a year of waste sorting, composting, and other concentrated efforts to divert over 90% of Chou’s landfill waste. Design features such as rainwater harvesting, water-efficient landscaping, and the use of water-saving toilets and bathroom fixtures, help Chou Hall use 40% less water than a traditional building of its size and purpose.  Energy efficiency was improved by 38% over traditional buildings through solar shading, high-performance windows, a reflective roof, daylight controlled LED lighting, and cooling fans and pumps controlled by adjustable-speed drives.

 

See Also: Ontario building first to achieve zero-carbon designation by Canada GBC

 

The facility includes eight tiered classrooms with 76-140 seats each, a 300 person event space, a 3,000-sf cafe with outdoor seating, 28 study rooms, four flexible classrooms, and a total of 858 classroom seats.

In addition to Perkins+Will, Vance Brown Builders was the project’s general contractor.

 

Related Stories

75 Top Building Products | Dec 12, 2019

Top Building Envelope Products for 2019

Sto's beetle-inspired exterior coating and Dörken Systems' UV-resistant vapor-permeable barrier are among the 28 new building envelope products to make Building Design+Construction's 2019 101 Top Products report. 

Building Owners | Dec 2, 2019

What building owners and AEC teams need to know about New York’s Climate Mobilization Act

On April 18, 2019, the New York City Council passed the Climate Mobilization Act, a suite of laws aimed to meet the city’s commitment to achieving carbon neutrality by 2050.

Sustainability | Aug 15, 2019

Paris will soon be home to the world’s largest rooftop farm

Agripolis is spearheading the project.

Codes and Standards | Jul 15, 2019

USGBC calls for proposals for feedback, concepts for next LEED version

The move follows successful public input on LEED 4.1.

Green | May 8, 2019

Does wellness pay off?

Getting wellness to pay off may not be that simple, or even a wise investment to begin with, according to a new peer-reviewed study of 32,000 employees.

Green | Apr 23, 2019

Top 10 green buildings for 2019

The Amherst College Science Center and Frick Environmental Center are among the high-performance projects to be honored with AIA 2019 COTE Top Ten Awards.

Resiliency | Apr 22, 2019

Turner Construction doubles down on jobsite efficiency

The company targets a 50% cut in greenhouse gas emissions and water use from construction activities by 2030.

Sustainable Design and Construction | Apr 9, 2019

One of the largest zero-carbon, net-zero buildings is rising in Spokane

Catalyst will be part of an innovation hub, with Eastern Washington University as its main tenant.

Codes and Standards | Apr 8, 2019

LEED v4.1 now available for cities, communities, residential/homes

The rating system emphasizes performance monitoring, fully integrated design, social equity, and human health.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021