flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Cherokee County Detention Center renovation completes

Government Buildings

Cherokee County Detention Center renovation completes

CROFT designed the project.


By David Malone, Managing Editor | February 16, 2022
Cherokee Adult Detention Center exterior
All photos: Jason Buch

The 225,000-sf Cherokee County Adult Detention Center was first completed in 2002, but has recently undergone a renovation project that included the addition of more than 110,000-sf of space to keep up with the county’s growing needs.

Through the expansion, the Center acquired a 582-bed housing tower composed of precast concrete modular cells with structural precast walls and floors, a load bearing CMU, and elevated cast-in-place concrete. 21-day rooms were specially designed for indirect supervision from elevated control towers and three exercise yards. Additional renovations took place in the kitchen, staff dining area, laundry facilities, visitation areas, the lobby, and the master control.

Cherokee Adult Detention Center inmate cell

The existing kitchen was expanded to accommodate the increased number of meals needing to be prepared. The staff dining area was given improved finishes to create a more pleasing environment. The main control room was modified to increase the monitoring capabilities of the Sheriff’s staff to view all movement within the detention center.

Several previously unused areas were reinstated, including the original main detention entrance that had been unused for years by staff and the public. The area was renovated and modified to become the new video visitation site, creating a safe and efficient way for visitors to speak with inmates.

Cherokee Adult Detention Center secure pod area

New public restrooms for visitors, a secure control station for the Sheriff’s staff to monitor visitor activities, 29 video visitation stations, space for 22 additional monitors, and six private attorney video visitation booths were also added.

CROFT provided the architectural design and construction administration services for the renovation/new service areas for the project. CROFT also served as a partner to Studio 8 for the housing pod addition and served as the construction administration lead for the 117,000 sq. ft., 600 bed addition to the Cherokee County Jail.

Related Stories

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Bookworms in Silver Spring getting new library

The residents of Silver Spring, Md., will soon have a new 112,000-sf library. The project is aiming for LEED Silver certification.

| Oct 13, 2010

County building aims for the sun, shade

The 187,032-sf East County Hall of Justice in Dublin, Calif., will be oriented to take advantage of daylighting, with exterior sunshades preventing unwanted heat gain and glare. The building is targeting LEED Silver. Strong horizontal massing helps both buildings better match their low-rise and residential neighbors.

| Oct 12, 2010

Guardian Building, Detroit, Mich.

27th Annual Reconstruction Awards—Special Recognition. The relocation and consolidation of hundreds of employees from seven departments of Wayne County, Mich., into the historic Guardian Building in downtown Detroit is a refreshing tale of smart government planning and clever financial management that will benefit taxpayers in the economically distressed region for years to come.

| Oct 12, 2010

Building 13 Naval Station, Great Lakes, Ill.

27th Annual Reconstruction Awards—Gold Award. Designed by Chicago architect Jarvis Hunt and constructed in 1903, Building 13 is one of 39 structures within the Great Lakes Historic District at Naval Station Great Lakes, Ill.

| Oct 6, 2010

Windows Keep Green Goals in View

The DOE's National Renewable Energy Laboratory has almost 600 window openings, and yet it's targeting LEED Platinum, net-zero energy use, and 50% improvement over ASHRAE 90.1. How the window ‘problem’ is part of the solution.

| Sep 21, 2010

New BOMA-Kingsley Report Shows Compression in Utilities and Total Operating Expenses

A new report from the Building Owners and Managers Association (BOMA) International and Kingsley Associates shows that property professionals are trimming building operating expenses to stay competitive in today’s challenging marketplace. The report, which analyzes data from BOMA International’s 2010 Experience Exchange Report® (EER), revealed a $0.09 (1.1 percent) decrease in total operating expenses for U.S. private-sector buildings during 2009.

| Sep 13, 2010

World's busiest land port also to be its greenest

A larger, more efficient, and supergreen border crossing facility is planned for the San Ysidro (Calif.) Port of Entry to better handle the more than 100,000 people who cross the U.S.-Mexico border there each day.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021