flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Casablanca Finance City Tower becomes Morphosis’ first project in Africa

High-rise Construction

Casablanca Finance City Tower becomes Morphosis’ first project in Africa

The tower is the first building completed in Casablanca Finance City.


By David Malone, Associate Editor | January 20, 2021
CFC Tower exterior at night

All photos: Jasmine Park

The 25-story Casablanca Finance City Tower has become the first project to be completed in the newly-established Casablanca Finance City, a new business district being developed in Morocco's Anfa District.

The Casablanca Finance City Tower’s design draws on the openness of the surrounding area, which gave the designers the opportunity in an otherwise dense city to highlight the relationship between the building and the natural environment. 

 

CFC facade

 

“The Casablanca Finance City Tower and its innovative design was conceived to have long-lasting impact and to signal a new era of economic prosperity for Morocco,” said Morphosis Founding Partner Thom Mayne in a release. “This tower brings together a range of global industries in the heart of the country, galvanizing international investment in North Africa, while also providing a template for the future development of the district as it continues to grow.”

 

Casablanca City Finance Tower interior elevator

 

A brise-soleil system wraps the building to protect against the sun while allowing the building to harness external elements to regulate natural light, air, and temperatures internally. The facade draws inspiration from traditional geometric patterned mosaics and wooden latticework screens characteristic of Moroccan architecture.

A tapered crown tops the 400-foot structure, while at street level the building engages the lower urban landscape with exterior public programming that invites the community into adjacent public spaces. This allows the building to serve as both a symbol of the city’s development and as a social hub that nurtures an active street life in the district.

Casablanca Finance City Tower is designed to achieve all LEED Gold certification.

 

CFC Tower ground level exterior

Related Stories

High-rise Construction | Sep 18, 2019

Central Park Tower tops out in New York City

The building will be the tallest residential skyscraper in the world.

AEC Innovators | Aug 27, 2019

7 AEC industry disruptors and their groundbreaking achievements

From building prefab factories in the sky to incubating the next generation of AEC tech startups, our 2019 class of AEC Innovators demonstrates that the industry is poised for a shakeup. Meet BD+C’s 2019 AEC Innovators.

Museums | Jul 29, 2019

A new museum debuts inside the Empire State Building

A $165 million, 10,000-sf museum opened on the second floor of the Empire State Building in New York City, completing the second of a four-phase “reimagining” of that building’s observatory experience, which draws four million visitors annually.

High-rise Construction | Jul 25, 2019

Could this 500 foot, Bjarke Ingels-designed observation tower rise in San Diego?

The tower would be part of the $2.4 billion Seaport San Diego project.

Building Tech | Jun 26, 2019

Modular construction can deliver projects 50% faster

Modular construction can deliver projects 20% to 50% faster than traditional methods and drastically reshape how buildings are delivered, according to a new report from McKinsey & Co.

High-rise Construction | Apr 11, 2019

Top new skyscrapers for 2019: Salesforce Tower named best worldwide

The San Francisco tower was recognized for its innovations in seismic engineering and a design that "gives back" to the community. 

High-rise Construction | Apr 10, 2019

*Updated* A Tulip is ready to bloom in London

Designed by Foster + Partners, the Tulip will rise 1,001 feet and be a new cultural and tourist attraction.

High-rise Construction | Mar 4, 2019

Goettsch Partners' tallest tower ever tops out in China

The tower will become the tallest in Nanning, China upon completion.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021