flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

CannonDesign launches REALIZE Life Safety Solutions

Building Team

CannonDesign launches REALIZE Life Safety Solutions

“The Final Rule presents a considerable update to the life safety directives most healthcare systems have become accustomed to,” says Joe Cassata, principal at CannonDesign.


By CannonDesign | January 6, 2017

Photo courtesy CannonDesign

In response to changes to the Centers for Medicare & Medicaid Services (CMS) Life Safety Code, CannonDesign has launched REALIZE Life Safety Solutions — a suite of services and software solutions focused on helping healthcare facilities teams assess their compliance with life safety code standards related to CFR 482.41 — Condition of participation: Physical environment — without operational disruptions.

Named the No. 4 facility management provider within an A/E firm by the “World Architecture 100,” CannonDesign created REALIZE Life Safety Solutions to help clients navigate through CMS’s most recent Final Rule, which adopted the National Fire Protection Association’s 2012 edition of the Life Safety Code (NFPA 101), as well as provisions of the NFPA’s 2012 edition of the Health Care Facilities Code (NFPA 99). All health facilities that participate in Medicare and/or Medicaid must comply with these code changes.

“The Final Rule presents a considerable update to the life safety directives most healthcare systems have become accustomed to,” says Joe Cassata, principal at CannonDesign. “The last time a change in the Life Safety Code was made was in 2003 when CMS adopted the 2000 edition. Sorting through the new changes and understanding how they apply to individual facilities is a daunting task, which is why we’re launching this offering.”

With experience assessing more than 200 million SF of space, life safety is not a new service area for CannonDesign. However, REALIZE Life Safety Solutions packages the firm’s life safety services into an easily customizable offering focused on three primary areas:

 

  1. Life Safety Current State: Life safety drawings review, field verification, and key findings report of current Life Safety for owned or leased facilities.
  2. Code Review: Review and report of physical conditions based on 2012 Life Safety Codes.
  3. Corrective Action Plan: Corrective action report containing prioritized deficiencies, cost estimates and recommendations for remediation.

 

“Most health systems have received a life safety deficiency,” adds Cassata. “Sometimes the deficiencies are minor and easily fixed, while other times they require significant facility modifications to prevent steep fines, possible terminated Medicare/Medicaid reimbursements, and even possible closure. Regardless of the scenario, we have the knowledge and expertise needed to get our clients to a place where can have absolute confidence in their Life Safety Code compliance.”

Related Stories

Building Team | Jul 5, 2022

Dallas’ Fair Park, home to the State Fair of Texas, will place a park atop a new parking garage

A registered National Historic Landmark, Fair Park is the 227-acre home to the Texas State Fair and various cultural institutions in Dallas, Tex.

Market Data | Jul 1, 2022

Nonresidential construction spending slightly dips in May, says ABC

National nonresidential construction spending was down by 0.6% in May, according to an Associated Builders and Contractors analysis of data published today by the U.S. Census Bureau.

Building Team | Jul 1, 2022

How to apply WELL for better design outcomes

The International WELL Building Institute (IWBI) cites attracting top talent, increasing productivity, and improving environmental, social or governance (ESG) performance as key outcomes of leveraging tools like their WELL Building Standard to develop healthier environments.

Building Team | Jul 1, 2022

Less portable potty, more movable restroom

Some contractors are packing up their portable potties and instead using the H3 Wellness Hub.

Building Team | Jun 30, 2022

Adopting a regenerative design mindset

To help address the current climate emergency, a new way of thinking across the entire architecture, engineering and construction industry is imperative.

Market Data | Jun 30, 2022

Yardi Matrix releases new national rent growth forecast

Rents in most American cities continue to rise slightly each month, but are not duplicating the rapid escalation rates exhibited in 2021.

Headquarters | Jun 30, 2022

Lenovo to build its new global headquarters in Beijing

Washington, D.C.-based architecture and design firm CallisonRTKL has announced it will create the new global headquarters in Beijing for Lenovo Group, a Chinese multinational personal technology company.

Mass Timber | Jun 29, 2022

Mass timber competition: building to net-zero winning proposals

The 2022 Mass Timber Competition: Building to Net-Zero is a design competition to expand the use of mass timber in the United States by demonstrating its versatility across building types and its ability to reduce the carbon footprint of the built environment.

Laboratories | Jun 29, 2022

The "collaboratory" brings digital innovation to the classroom

The Collaboratory—a mix of collaboration and laboratory—is a networking center being designed at the University of Denver’s College of Business.

Airports | Jun 29, 2022

BIG and HOK’s winning design for Zurich airport’s new terminal

Two years ago, Zurich Airport, which opened in the 1950s, launched an international design competition to replace the aging Dock A—the airport’s largest dock.

boombox1 - default
boombox2 -
native1 -

More In Category



Giants 400

Top 75 Engineering Firms for 2023

Kimley-Horn, WSP, Tetra Tech, Langan, and IMEG head the rankings of the nation's largest engineering firms for nonresidential buildings and multifamily buildings work, as reported in Building Design+Construction's 2023 Giants 400 Report.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021