flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

BMO Centre expansion breaks ground

Events Facilities

BMO Centre expansion breaks ground

The expansion will cost $500 million.


By David Malone, Associate Editor | May 6, 2021
BMO Centre expansion
BMO Centre expansion

The BMO Centre expansion has officially broken ground in Calgary’s Stampede Park. The expansion will provide provide state-of-the-art facilities for community engagement and economic benefit through job creation and tourism.

Designed by a team comprising Stantec, Populous, and S2 Architecture, the expansion will offer double the rentable space of the current BMO Centre. “The project’s design reflects the traditional history of the area, and the surrounding landscape – creating a stunning gathering place where people can connect and experience the best Calgary has to offer in the Culture + Entertainment District,” said Léo Lejeune, Senior Principal, Stantec, in a release. “Our team’s careful attention to the design of the architecture, the interiors and the landscaped public realm - we are confident this project is an example of world-class place-making at its finest.”

 

BMO Centre expansion exterior

 

The expansion will include over one million square feet of total floor space, including 350,000 sf of contiguous exhibit space. Interior spaces will be large and adaptable, event spaces and public areas will be wired for instant connectivity, flexible breakout areas will facilitate human connections, and outdoor spaces will invite attendees to experience the natural surroundings and diverse amenities.

The project is slated to open in 2024 and will be the largest convention facility in western Canada and the second largest in the country overall.

 

BMO Centre expansion exterior in winter

Related Stories

| Mar 1, 2012

Cornell shortlists six architectural firms for first building on tech campus

Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project.

| Mar 1, 2012

Bomel completes design-build parking complex at U.C. San Diego

The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level. 

| Feb 6, 2012

FMI releases 2012 Construction Productivity Report

Downsizing has resulted in retaining the most experienced and best-trained personnel who are the most capable of working more efficiently and harder.

| Feb 2, 2012

Shawmut Design and Construction launches sports venues division

Expansion caps year of growth for Shawmut.

| Jan 24, 2012

U of M installs new lighting at Crisler Player Development Center

Energy efficient lighting installed at PDC reduce costs and improves player performance.

| Jan 3, 2012

The Value of Historic Paint Investigations

An expert conservator provides a three-step approach to determining a historic building’s “period of significance”—and how to restore its painted surfaces to the correct patterns and colors. 

| Dec 27, 2011

Nova completes $60M Clearwater Conference Center

Comprising an entire city block, the 450,000 sq. ft. facility features over 400 meeting rooms, six theaters, a full-service health spa, complete with an indoor running track, and a commercial kitchen that can efficiently accommodate over 1,000 diners

| Dec 27, 2011

BD+C's Under 40 Leadership Summit update

The two-day Under 40 Leadership Summit continued with a Leadership Style interactive presentation; Great Solutions presentations from Under 40 attendees; the Owner’s Perspective panel discussion; and the Blue Ocean Strategy presentation.

| Dec 14, 2011

Tyler Junior College and Sika Sarnafil team up to save energy

Tyler Junior College wanted a roofing system that wouldn’t need any attention for a long time.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

boombox1 - default
boombox2 -
native1 -

More In Category


Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021