Plan ahead when building in the west

Getting a project through plan review can be an unusually long process, anywhere from six months to two years.

Sponsored content
June 20, 2017 |
Allen Hurtz

The west coast states present a special challenge to builders. The area is seismically active and as such has complex building codes for California, Oregon, Washington, Alaska, and Idaho.  Getting a project through plan review can be an unusually long process, anywhere from six months to two years.

Generally speaking, in most jurisdictions, the code official has wide latitude in the types of questions he or she can ask, or the information that can be requested, before approving a project. The review officials are broadly empowered to protect the safety of people in the jurisdiction; especially in an area that includes high seismic activity.

When they review the drawings and calculations, officials often question things that appear incorrect or are not clearly understood. They may ask the engineer of record to justify some of the values. This can certainly make an engineer feel untrustworthy; however, it’s really just an official who is trying to do the job right. 

The review process can get be delayed by these questions. If the reviewer sends a letter with a list of questions, the builder needs to provide explanations. Sometimes the builder needs further assistance with the plan checker’s comments from suppliers or sub-contractors.  And of course, this back and forth doesn’t happen instantly. The plan checker’s letter to a Star Builder gets passed along to the engineers at Star who respond to the parts that pertain to the metal building system. The builder then forwards the answers back to the official. Building departments typically have long queues of projects under review, and every round of question-and-answer has to wait. 

Another thing that certainly delay approval – and drive builders crazy – is that codes get updated, and a building can get caught between codes. For example, a project gets submitted to Star for design, and is engineered according to the currently applicable code.  Sometimes, by the time the project is submitted to plan check and waited for review, the code has been changed. The project gets sent back for re-design costing the builder time and money. Typically, cities change their adoption on the first of January, the first of June, and sometimes the first of October. Builders should exercise caution during those times of year and ask the officials of any imminent changes with the current building codes.

With all that said, there is one way to assist with the speed of the approval process. Builders who have a good relationship with their building department seem to get their projects through more quickly. When builders simply drop the calculations and drawings on the desk and leave, the projects seem to go through more rounds of questions and answers. However, when a builder takes the time to make an appointment, submit the plans, and carefully walk the official through the project with the codes and loads, it generally makes the approval process smoother. The questions tend to come out right away, not weeks later, and more often than not can be answered on the spot. At the very least, the builder can get a clear understanding of what needs to be addressed and come back with an effective response.  

Star continually stresses to our builders the need to go talk to their local code officials. This certainly applies everywhere in the country, but in the west, it seems to make even more of a difference.

Allen Hurtz | Metal Building Trends
Star Building Systems
Director of Engineering

Allen Hurtz, P.E., Director of Engineering, began his career at Star in January 1989 as a Design Engineer I.  He was promoted to Design Engineer II and then to Engineering Manager in 1997.  He accepted the position as Director of Engineering in 2012.  Allen received his Bachelor of Science degree in Civil Engineering from the University of Wisconsin Platteville and is a registered Professional Engineer in multiple states.  Allen and his wife, Trish, have two daughters, Rachel and Hannah, and enjoy family time and attending the girls’ activities.

Related Blogs

October 18, 2017 | Metals | Metal Building Trends

Star metal building systems have once again demonstrated their durability in extreme weather events.

August 24, 2017 | Building Materials | Metal Building Trends

No matter what structural material you build with, be it steel, concrete, or wood, water is the enemy.  ...

May 22, 2017 | Metals | Metal Building Trends

In many metal building applications, straight columns may have more steel than they need.

May 08, 2017 | Building Team | Metal Building Trends

The most important factor in making sure the where, when, what, and how go smoothly is making sure you pick...

May 03, 2017 | Metals | Metal Building Trends

There are robust, well-proven ways to protect steel so it can perform up to its potential virtually indefin...

January 31, 2017 | Metal Building Trends

GF Construction, led by Charles and Jerry Fombrun, designed an industrial manufacturing development in Hait...

December 13, 2016 | Moisture Control/Building Envelope | Metal Building Trends

The basic idea of a rainscreen is to have an exterior surface – a cladding layer - that breaks the force of...

December 01, 2016 | Metals | Metal Building Trends

Today’s codes define more efficient, effective structures, but the engineering of them has become vastly mo...

November 21, 2016 | Metals | Metal Building Trends

There is a mistaken belief among some people that steel buildings do not do well in earthquakes. The truth...

Overlay Init