flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Austin mixed-use development will provide two million sf of office, retail, and residential space 

Mixed-Use

Austin mixed-use development will provide two million sf of office, retail, and residential space 

In addition to three office buildings and four multifamily buildings, the seven-building East Riverside Gateway complex will emphasize the pedestrian experience.


By Novid Parsi, Contributing Editor | March 11, 2023
Austin mixed-use development will provide two million sf of office, retail, and residential space Renderings courtesy Steinberg Hart
Renderings courtesy Steinberg Hart

In Austin, Texas, the seven-building East Riverside Gateway mixed-use development will provide a mixed-use community next to the city’s planned Blue Line light rail, which will connect the Austin Bergstrom International Airport with downtown Austin.

Planned and designed by Steinberg Hart, the development will include over 2 million sf of office, retail, and residential space, as well as amenities, such as a large park, that are intended to draw tech workers and young families. Currently home to a storage facility and a former mobile home park, the 22.5-acre triangular site is located at the terminus of the Riverside corridor. 

The three office buildings will be placed around a central plaza. The four multifamily buildings will provide 1,100 residential units at a range of prices, from high-end condos to larger residences, in addition to more compact, attainable units and affordable housing. All seven buildings will be connected through a ground-floor retail corridor. The project also will have 4,000 parking spaces. 

The master plan for the mixed-use development emphasizes the pedestrian experience, creating a walkable neighborhood and retaining the site’s numerous trees. The 3.5-acre urban park, which straddles the new development and its existing neighborhood, includes an area dedicated to the restoration of the area’s native Blackland Prairie habitat. Aiming to draw in pedestrians, the park’s programming will seek to inspire outdoor activities with a trailhead, bike path, playground, dog runs, and an outdoor pavilion area that can house events and performances. 

The buildings will feature solar shading to minimize heat gain, double-height porches, and balconies. And landscaping at the podium level and throughout the neighborhood should provide a cooling reprieve from the Texas heat.

East Riverside Gateway is currently in the entitlement phase. 

On the Building Team:
Owner (land): Artesia Real Estate 
Developer: PlaceMKR  
Design architect: Steinberg Hart
Landscape architect: dwg. 
Preconstruction services (residential and office buildings): Bartlett Cocke, Austin Commercial, DCI Engineers, CEC, and V3 Consulting Engineers

Steinberg Hart_East Riverside Gateway_Rendering (5).png

 

Steinberg Hart_East Riverside Gateway_Rendering

Steinberg Hart_East Riverside Gateway_Rendering

Steinberg Hart_East Riverside Gateway_Site Plan_Modified

Steinberg Hart_East Riverside Gateway_Rendering

Steinberg Hart_East Riverside Gateway_Rendering

 

 

 

 

 

Related Stories

| Aug 11, 2010

Outdated office tower becomes Nashville’s newest boutique hotel

A 1960s office tower in Nashville, Tenn., has been converted into a 248-room, four-star boutique hotel. Designed by Earl Swensson Associates, with PowerStrip Studio as interior designer, the newly converted Hutton Hotel features 54 suites, two penthouse apartments, 13,600 sf of meeting space, and seven “cardio” rooms.

| Aug 11, 2010

Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms

A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

10% of world's skyscraper construction on hold

Emporis, the largest provider of global building data worldwide, reported that 8.7% of all skyscrapers listed as "under construction" in its database had been put on hold. Most of these projects have been halted in the second half of 2008. According to Emporis statistics, the United States had been hit the worst: at the beginning of 2008, "Met 3" in Miami was the only U.S. skyscraper listed as being "on hold". In the second half of the year, 19 projects followed suit.

| Aug 11, 2010

Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report

A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Portland Cement Association offers blast resistant design guide for reinforced concrete structures

Developed for designers and engineers, "Blast Resistant Design Guide for Reinforced Concrete Structures" provides a practical treatment of the design of cast-in-place reinforced concrete structures to resist the effects of blast loads.  It explains the principles of blast-resistant design, and how to determine the kind and degree of resistance a structure needs as well as how to specify the required materials and details.

| Aug 11, 2010

New website highlights government tax incentives for large commercial buildings

Energy Retrofit Group (ERG), the subsidiary of 40-year-old, award-winning Adache Group Architects, Inc., has announced the creation of their new energy conservation web site: www.energy-rg.com.

| Aug 11, 2010

Gensler, HOK, HDR among the nation's leading reconstruction design firms, according to BD+C's Giants 300 report

A ranking of the Top 100 Reconstruction Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021