flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Aurora, Colo., recreation center features city’s first indoor field house, unobstructed views of the Rocky Mountains

Sports and Recreational Facilities

Aurora, Colo., recreation center features city’s first indoor field house, unobstructed views of the Rocky Mountains

The $41.9 million, 77,000-sf Southeast Aurora Recreation Center and Fieldhouse aims to mimic the geography of a canyon.


By Novid Parsi, Contributing Editor | March 17, 2023
Aurora, Colo., recreation center features city’s first indoor field house, unobstructed views of the Rocky Mountains
All photos: Conor Culver, courtesy Populous

In January, design firm Populous and the City of Aurora, Colo. marked the opening of the Southeast Aurora Recreation Center and Fieldhouse. The 77,000-sf facility draws design inspiration from the nearby Rocky Mountains.

With natural Douglas Fir structure and decking, the building aims to mimic the geography of a canyon. The large open entryway spans the length of the building and offers expansive mountain views through a glass curtainwall. The glass walls also provide light and visibility into various areas such as the basketball courts.

Populous designed the facility, including the city’s first indoor field house, to respect the site while also meeting the project requirements of operational efficiency, cost-effective design, and the community’s betterment.

“This new recreation center and field house stands apart as a breathtaking example of a community asset that is built to reflect, benefit, and showcase its people and its landscape,” Gudmundur Jonsson, senior architect and principal at Populous, said in a statement. “The City of Aurora now has another cost-effective and operationally efficient space that will allow it to further serve its community.”

An elevated running track extends from inside the gym out into the entryway and along the curtainwall, evoking a mountain trail. The fitness area includes a 3,000-sf patio and a garage door opening to outdoor training areas. In addition to the gym, track, and other outdoor fitness areas, the recreation center includes community spaces, volleyball courts, pickleball courts, pools, and a 20-foot-tall waterslide that runs 152 feet long.

The $41.9 million project is the second ground-up recreation center constructed for Aurora in over four decades. Populous also led the design of Aurora’s Central Recreation Center.

On the Building Team:
Owner: City of Aurora Parks, Recreation, and Open Space Department
Design architect and architect of record: Populous
MEP engineers: The Ballard Group, Innovative Electrical Systems
Structural engineer: Martin Martin
General contractor/construction manager: Saunders Construction

Southeast Aurora Recreation Center and Fieldhouse by Populous Photo by Conor Culver

Southeast Aurora Recreation Center and Fieldhouse by Populous Photo by Conor Culver

Southeast Aurora Recreation Center and Fieldhouse by Populous Photo by Conor Culver

Southeast Aurora Recreation Center and Fieldhouse by Populous Photo by Conor Culver

Southeast Aurora Recreation Center and Fieldhouse by Populous Photo by Conor Culver

Related Stories

Sports and Recreational Facilities | Aug 9, 2018

Populous-designed Buffalo Bills training center expansion will begin construction this fall

Arc Building Partners will lead construction efforts on the project.

| May 24, 2018

Accelerate Live! talk: Security and the built environment: Insights from an embassy designer

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), embassy designer Tom Jacobs explores ways that provide the needed protection while keeping intact the representational and inspirational qualities of a design.

Building Team Awards | May 16, 2018

Game, set, match: United States Tennis Association National Campus

Gold Award: With 100 courts and more than 260,000 sf of vertical construction, the USTA National Campus is a sanctuary for tennis enthusiasts.

Sports and Recreational Facilities | May 15, 2018

Is this the most environmentally sustainable arena in the country?

The university arena was designed by Architectural Resources Cambridge.

Sports and Recreational Facilities | Apr 19, 2018

Watch a time-lapse of Wrigley Field’s most recent phase of renovations

The renovations took place between October 2017 and April 2018.

Sports and Recreational Facilities | Apr 3, 2018

Westminster College’s new athletic stadium includes a turf field and seating for 2,000

The project is the largest capital improvement project on the campus in over a decade.

Sports and Recreational Facilities | Mar 30, 2018

Final Four excitement? Here are two collegiate sports facilities to check out before your weekend of hoops

CannonDesign recently shared new images of two collegiate sports projects with interesting ties to college basketball past, present and future.

Sports and Recreational Facilities | Feb 23, 2018

A gym’s exercise equipment helps power an arts and sciences center in Rochester, N.Y.

The equipment’s supplier is eyeing the U.S. for aggressive growth.

boombox1 - default
boombox2 -
native1 -

More In Category


Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.


Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021