flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Atlantis planning to build the world’s most expensive resort in Hawaii

Resort Design

Atlantis planning to build the world’s most expensive resort in Hawaii

The project was first announced in 2005 but has progressed little since.


By David Malone, Associate Editor | January 26, 2016

The new resort is expected to be similar to Atlantis, The Palm (pictured), located in Dubai. Photo Credit: Pixabay Creative Commons

Atlantis Resorts is reportedly in the process of finalizing a deal to build a massive, $2 billion resort in Ko Olina, Hawaii, according to Hawaii News Now (HNN). If true, the project, plans of which were originally divulged in 2005, could become the most expensive resort ever constructed.

A detail that caused debate back in 2005, and slowed the project's development considerably, was the question of whether or not to include a casino. Some backers wanted gambling to be a part of the resort while others were against the idea.

It is reported that this new resort would be similar to Atlantis, The Palm, located in Dubai. The Hawaiian entry into the Atlantis Resorts catalog would feature an interactive aquarium meant to resemble the ocean as closely as possible, hotel rooms with a view of the aquarium, an area to swim with dolphins, and a shark habitat. In addition to hotel rooms, there are also plans for condo and timeshare units.

When the project was announced at a press conference in 2005 by Ko Olina Developer Jeff Stone, who is Chairman, President, and CEO of The Resort Group, he said of the aquarium, “This aquarium will look as the ocean looks. It'll look as the sea looks today. You'll be able to view it underneath. You'll be able to interact with it, actually swim through it, and you'll be able to learn from it in a natural setting.”

While it is being labeled as a "$2 billion resort," the price tag is expected to exceed that amount if and when the project gets under way.

The proposed resort is still without a timetable, as it still has to go through multiple permitting and regulatory processes before construction can actually begin.

Related Stories

Hotel Facilities | Nov 3, 2020

Hotel made from CLT opens at Fort Jackson, S.C.

This project used over 4,100 pieces of cross-laminated timber. It's the fourth CLT hotel in the Army's housing portfolio.

Hotel Facilities | Oct 27, 2020

Hotel construction pipeline dips 7% in Q3 2020

Hospitality developers continue to closely monitor the impact the coronavirus will have on travel demand, according to Lodging Econometrics.

Smart Buildings | Oct 26, 2020

World’s first smart building assessment and rating program released

The SPIRE Smart Building Program will help building owners and operators make better investment decisions, improve tenant satisfaction, and increase asset value.

Hotel Facilities | Sep 22, 2020

‘Lifestyle’ is adding new color to the select-service hotel sector

A new WATG Strategy white paper examines the design characteristics of the blending.

Giants 400 | Aug 28, 2020

2020 Giants 400 Report: Ranking the nation's largest architecture, engineering, and construction firms

The 2020 Giants 400 Report features more than 130 rankings across 25 building sectors and specialty categories.

Coronavirus | Aug 25, 2020

Video: 5 building sectors to watch amid COVID-19

RCLCO's Brad Hunter reveals the winners and non-winners of the U.S. real estate market during the coronavirus pandemic.

Hotel Facilities | Aug 14, 2020

5 strategies for creating safer, healthier hotel experiences

As hotels begin to reopen, the focus on health and safety takes priority while working to preserve the guest experience.

Hotel Facilities | Aug 5, 2020

Renovations could be hospitality’s stopgap for next few years

Modular and prefab construction are already more prominent.

University Buildings | Aug 2, 2020

R&D hubs, modular-built hotels, and an award-winning student center on the August 6 “The Weekly”

R&D hubs, modular-built hotels, and an award-winning student center on the August 6 “The Weekly”

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021