flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Arenas on campuses aren’t just for sports anymore

Arenas

Arenas on campuses aren’t just for sports anymore

Several ARC-designed projects give the firm’s academic clients more event-hosting flexibility.


By John Caulfield, Senior Editor | July 12, 2019

Bentley University's new ice arena includes classrooms, and has hosted non-sporting events like concerts and fashion shows. Image: Bentley University

For the past several years, high schools and colleges have invested heavily in their on-campus sports complexes. And one of the trends that have emerging from that spending has been an increase in multipurpose arenas that can be used beyond the schedules of the school’s athletic teams.

One of the firm’s that have benefited from this trend is Architectural Resources Cambridge (ARC), which over the past few years has designed a number of these multipurpose centers in New England.

Those projects include the $52.6 million 115,700-sf Fish Field House on the Chestnut Hill, Mass., campus of Boston College. Fish Field, which opened a year ago, serves B.C.’s varsity football squad for indoor practice sessions, as well as the school’s recreational and club sports. Prior to the start of construction, this LEED Gold-certified building required flood mitigation; stormwater storage and management allowed Boston College to reclaim acreage on the edge of its campus.

 

 The new Fish Field House at Boston College. Image: Courtesy of ARC

 

The Hackley School, a college prep institution in Tarrytown, N.Y., last year opened its new 115,000-sf Walter C. Johnson Center for Health and Wellness. Its sports-related spaces include three basketball courts, an eight-lane pool, eight squash courts, a wrestling room and indoor track. But the facility also has a wellness studio, three classrooms, a teaching kitchen, a student common area, café, and office space.

A schematic of The Hackley School's new Health and Wellness Center. Image: Courtesy of ARC

 

ARC designed a 76,000-sf multipurpose arena that opened in February 2018 on the Waltham, Mass., campus of Bentley University. While this building’s primary occupant is the school’s NCAA Division 1 Falcons ice hockey team, the arena has been designed to accommodate other events and activities, according to Nicole Chabot-Wieferich, Bentley’s Director of student programs and engagement.

“The impetus for this came from the students,” Chabot-Wieferich tells BD+C. “Hockey is a big draw on campus, but the students also wanted additional space to hold events and to build a community on campus.”

 

The Bentley Falcons hockey team, performing it its new home. The facility is the first standalone ice arena in the U.S. to achieve LEED Platinum certification. Image: Courtesy of ARC

 

The facility, which has a seating capacity of 2,117 for hockey games and 3,400 for other events, has hosted concerts, career fairs, a Black United Body fashion show, admissions programs, and even the university’s President’s inauguration. In the first 15 months since its opening there have been more than 30,000 non-sports-related guests in the building.

Chabot-Wieferich says the arena is equipped with lighting packages and a sound system that are adjustable to different events. The technology also accommodates the hockey team with scoreboard replay and broadcasting capabilities.

The arena has classrooms, too, where, says Chabot-Wieferich, sustainability courses are taught. Students are using the arena as a living lab, analyzing the building’s energy data.

 

Bentley's multipurpose arena includes sophisticated A/V technology that can accommodate different kinds of events. Image: Courtesy of ARC

 

This is the first LEED-Platinum standalone ice arena in the country, and it boosts Bentley’s net-zero goals for 2030. (Thornton Tomasetti was the project’s LEED consultant.)

The other building team members on Bentley University's $45 million facility included Suffolk Construction (GC), Samiotes Consultants (engineer), McNamara-Salvia (SE), and Rist-Frost-Shumway Engineering (MEP).

 

Bentley's 5,000-plus students wanted a new facility that would help to create a community on campus. Image: Courtesy of ARC

Tags

Related Stories

| May 22, 2014

Just two years after opening, $60 million high school stadium will close for repairs

The 18,000-seat Eagle Stadium in Allen, Texas, opened in 2012 to much fanfare. But cracks recently began to appear throughout the structure, causing to the school district to close the facility. 

| May 20, 2014

Kinetic Architecture: New book explores innovations in active façades

The book, co-authored by Arup's Russell Fortmeyer, illustrates the various ways architects, consultants, and engineers approach energy and comfort by manipulating air, water, and light through the layers of passive and active building envelope systems.

| May 19, 2014

What can architects learn from nature’s 3.8 billion years of experience?

In a new report, HOK and Biomimicry 3.8 partnered to study how lessons from the temperate broadleaf forest biome, which houses many of the world’s largest population centers, can inform the design of the built environment.

| May 16, 2014

Toyo Ito leads petition to scrap Zaha Hadid's 2020 Olympic Stadium project

Ito and other Japanese architects cite excessive costs, massive size, and the project's potentially negative impact on surrounding public spaces as reasons for nixing Hadid's plan.  

| May 13, 2014

19 industry groups team to promote resilient planning and building materials

The industry associations, with more than 700,000 members generating almost $1 trillion in GDP, have issued a joint statement on resilience, pushing design and building solutions for disaster mitigation.

| May 11, 2014

Final call for entries: 2014 Giants 300 survey

BD+C's 2014 Giants 300 survey forms are due Wednesday, May 21. Survey results will be published in our July 2014 issue. The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue.

| Apr 29, 2014

USGBC launches real-time green building data dashboard

The online data visualization resource highlights green building data for each state and Washington, D.C.

| Apr 9, 2014

Steel decks: 11 tips for their proper use | BD+C

Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.

| Apr 2, 2014

8 tips for avoiding thermal bridges in window applications

Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.

| Mar 26, 2014

Callison launches sustainable design tool with 84 proven strategies

Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com. 

boombox1 - default
boombox2 -
native1 -

More In Category




Giants 400

Top 70 Sports Facility Construction Firms for 2023

AECOM, Turner Construction, Clark Group, Mortenson head BD+C's ranking of the nation's largest sports facility contractors and construction management (CM) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021