flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Architecture Billings Index moves upward

Architecture Billings Index moves upward

The Architecture Billings Index climbed nearly three points in October. 


By By BD+C Staff | November 16, 2011
AIA October billings index
The American Institute of Architects reported the October ABI score was 49.4, following a score of 46.9 in September.

After a sharp dip in September, the Architecture Billings Index (ABI) climbed nearly three points in October. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending. The American Institute of Architects (AIA) reported the October ABI score was 49.4, following a score of 46.9 in September. This score reflects an overall decrease in demand for design services (any score above 50 indicates an increase in billings). The new projects inquiry index was 57.3, up from a reading of 54.3 the previous month.

“An increase in the billings index is always an encouraging sign,” said AIA Chief Economist, Kermit Baker, PhD, Hon. AIA. “We’re seeing some regions and some construction sectors move into positive territory. But there continues to be a high level of volatility in the marketplace with architecture firms reporting a wide range of conditions from improving to uncertain to poor. It’s likely we will see a similar state of affairs in the coming months.” 

Key October ABI highlights:

  • Regional averages: Northeast (51.7), South (49.1),  Midwest (47.7), West (43.5)
  • Sector index breakdown: commercial / industrial (53.5), multi-family residential (51.3), institutional (47.3), mixed practice (42.0)
  • Project inquiries index: 57.3

The regional and sector categories are calculated as a 3-month moving average, whereas the index and inquiries are monthly numbers. BD+C

Related Stories

| Aug 11, 2010

PBK, DLR Group among nation's largest K-12 school design firms, according to BD+C's Giants 300 report

A ranking of the Top 75 K-12 School Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Turner Building Cost Index dips nearly 4% in second quarter 2009

Turner Construction Company announced that the second quarter 2009 Turner Building Cost Index, which measures nonresidential building construction costs in the U.S., has decreased 3.35% from the first quarter 2009 and is 8.92% lower than its peak in the second quarter of 2008. The Turner Building Cost Index number for second quarter 2009 is 837.

| Aug 11, 2010

AGC unveils comprehensive plan to revive the construction industry

The Associated General Contractors of America unveiled a new plan today designed to revive the nation’s construction industry. The plan, “Build Now for the Future: A Blueprint for Economic Growth,” is designed to reverse predictions that construction activity will continue to shrink through 2010, crippling broader economic growth.

| Aug 11, 2010

New AIA report on embassies: integrate security and design excellence

The American Institute of Architects (AIA) released a new report to help the State Department design and build 21st Century embassies.

| Aug 11, 2010

Section Eight Design wins 2009 Open Architecture Challenge for classroom design

Victor, Idaho-based Section Eight Design beat out seven other finalists to win the 2009 Open Architecture Challenge: Classroom, spearheaded by the Open Architecture Network. Section Eight partnered with Teton Valley Community School (TVCS) in Victor to design the classroom of the future. Currently based out of a remodeled house, students at Teton Valley Community School are now one step closer to getting a real classroom.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021