flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Architects propose sustainable ‘vertical city’ in the Sahara

High-rise Construction

Architects propose sustainable ‘vertical city’ in the Sahara

Designers aim to make the 1,476-foot tower sustainable, relying on rainwater collection, solar power, and geothermal energy.


By BD+C Staff | April 22, 2015
Architects propose sustainable ‘vertical city’ in Sahara

Agriculture will be planted in a central tower inside the main structure, so that produce is protected from the harsh desert conditions. Renderings courtesy OXO Architectes

Building in the Sahara seems to be in the minds of many French architects lately. Aside from Parisian practice XTU Architects’ sand-and-bubble building method for shelters in one of the world’s most inhospitable landscapes, OXO Architectes and Nicolas Laisné Associés—both also from the greater Paris area—revealed their own proposal for the Sahara, a futuristic mixed-use tower called The City Sand Tower, Gizmag reports.

Relying on rainwater collection, solar power, and geothermal energy, the designers aim to make this so-called “vertical city” a sustainable one. The project description says that the building will be 1,476 feet with a total floor space of 192 acres.

According to renderings released by OXO Architectes, agriculture will be planted in a central tower inside the main structure, so that produce is protected from the harsh desert conditions.

Around 22% of the structure’s space will be allocated to office space, 17.5% for hotel space, 15% for housing, and the remaining available space for a shopping center, sports area, museum, spa, dining locations, and conference rooms. The cherry on top is a meteorological observatory and a heliport.

The firms said they imagine the project to start construction in 2025, with construction phased over 50 years, Gizmag reports.

Read the full story at Gizmag.

 

Related Stories

| Feb 17, 2013

Pakistan to get world's tallest tower in $45 billion deal

Newly signed mega deal will fund construction of several massive developments in Karachi, including a mixed-use tower that will dwarf the Burj Khalifa.

| Feb 13, 2013

'Vegetative tower' apartments to revive NYC site

A Manhattan site formerly slated for development with a "tower of cubes"—a now-defunct project by Santiago Calatrava—will be revived with a 998-foot, 300,000-sf apartment building by Morali Architects.

| Jul 9, 2012

Modular Construction Delivers Model for New York Housing in Record Time

A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.

| Jul 2, 2012

San Francisco lays claim to the greenest building in North America

The 13-floor building can hold around 900 people, but consumes 60% less water and 32% less energy than most buildings of its kind.

| Jun 13, 2012

Thornton Tomasetti founding principals receive CTBUH Fazlur R. Khan Lifetime Achievement Medal

This is the first time the CTBUH Board of Trustees has awarded the prize to two individuals jointly.

| Jun 6, 2012

KPF designs tower for Yongsan IBD

The master plan, created by Studio Daniel Libeskind, is a dynamic urban environment containing contributions from 19 different architects practicing in diverse locations around the globe.

| Jun 6, 2012

SOM urges Chicago tenants to partner with landlords to cut energy use

Tenants can exceed building energy challenge targets recently announced by Mayor Emanuel.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021