flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Architects look to ‘activate’ vacant block in San Diego with shipping container-based park

Cultural Facilities

Architects look to ‘activate’ vacant block in San Diego with shipping container-based park

Shipping containers will serve as vendor kiosks


By John Caulfield, Senior Editor | February 6, 2015
Architects look to ‘activate’ vacant block in San Diego with shipping container-based park

A 28,500-sf vacant city block in San Diego will become a temporary urban park that will attempt to draw local residents and tourists with retail, food service, and meeting spaces. Vendors will set up shop in recycled shipping containers. Rendering: RAD Labs

A team of alumni from the NewSchool of Architecture and Design in San Diego has taken over a 28,500-sf empty city block in that metro to create what they hope will be a revenue-generating urban park that, when it opens on March 5, includes food service, retail, performance and meeting spaces, and a dog park.

The urban park, called Quartyard, was funded partly by local residents through a Kickstarter campaign that raised $60,000 from 300 donors in 30 days. All told, Research Architecture Development Laboratory (RAD Labs) has $500,000 invested in this venture, according to its 29-year-old CEO Philip Auchettl, who formed the company with NewSchool classmates David Loewenstein, who is RAD Labs’ COO; and Jason Grauten, a partner. The park, in fact, started out as their college thesis project. (The company’s CFO, Adam Jubela, has a degree in entrepreneuriship and finance from the University of Arizona.)

Originally, Auchettl tells BD+C, RAD Labs’ plan was to install “pop-up” structures on the lot. “But then we asked ourselves why properties like these were vacant in the first place.” His team concluded that there was nothing to draw people or businesses to the site. So RAD Labs decided to “activate” the lot temporarily, “as a placeholder for future expansion.”

RAD Labs has already tested its “activation” strategy, as a way of drawing people to a site, with a 12-month installation at another empty lot, which used 300 recycled pallets for benches and tables. The site is next to a coffeehouse, “which encourages people to walk in and use the space,” says Auchettl.

After meeting with former Mayor Bob Filner and the city’s attorney, RAD Labs agreed to lease the vacant block for Quartyard for two years, with a 12-month extension. The city’s development arm, Civic San Diego, eventually intends to build high-rise housing on this site, although no timetable has been set, and this block has been vacant for a number of years.

(The San Diego Union-Tribune reports that RAD Labs is paying the city $1 per year for the lot, and will split any profits with the city and its financial partners. Auchettl tells BD+C that local residents and students “who wanted to become part of something different and exciting” are also investors. He did not disclose any names.)

As of last week, Quartyard had three permanent vendors: Best Beverage Catering, which will run a beer garden (hence the park’s name); a mini coffee shop, and a restaurant called S&M Sausage & Meat. Auchettl says that when the park opens it will offer a series of food trucks that might change from day to day; an area where concerts, meetings, and private dinners can be held; and a dog park, which should be a big hit in downtown San Diego where “there seem to be more dogs than people,” he quips. 

Vendors will set up in 14 recycled shipping containers around the periphery of the park. They purchase and refurbish the containers and lease their space. Auchettl says his team was drawn to the “simplicity” and portability of the containers, which have become popular components in the urban “cargotecture” movement that has sprung up in different parts of the country.

Auchettl says his company—located in offices at NewSchool, a few blocks from Quartyard—isn’t trying to reinvent the wheel. “But an urban park today can’t just be a few benches and trees. Now, it has to be an activity space.”

Related Stories

| May 24, 2018

Accelerate Live! talk: Security and the built environment: Insights from an embassy designer

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), embassy designer Tom Jacobs explores ways that provide the needed protection while keeping intact the representational and inspirational qualities of a design.

Cultural Facilities | Apr 16, 2018

Best in library design 2018: Six projects earn AIA/ALA library awards

Austin Central Library and the Tulsa City-County Central Library are among the top projects for 2018. 

Cultural Facilities | Jan 23, 2018

BIG reveals revised Smithsonian Campus master plan

The original proposal was first unveiled in 2014.

Mixed-Use | Dec 12, 2017

A new live/work neighborhood is about to get under way in Omaha, Neb.

Walkability and recreation will be key features of West Farm.

Cultural Facilities | Nov 2, 2017

Perkins Eastman wins competition to redesign San Francisco’s Harvey Milk Plaza

The Friends of Harvey Milk Plaza unanimously selected the Perkins Eastman entry as the winner.

Museums | Oct 3, 2017

Denmark’s new LEGO experience hub looks like it’s made out of giant LEGO blocks

The 12,000-sm building is part of Billund, Denmark’s goal to become the ‘Capital for Children.’

Museums | Aug 15, 2017

Underground Railroad Visitor Center tells story of oppression, then freedom

The museum is conceived as a series of abstracted forms made up of two main structures, one administrative and one exhibit.

Cultural Facilities | Jul 13, 2017

A WWII bunker becomes a museum along Denmark’s coast

BIG’s design of this cultural center is the “antithesis” of the fortress.

Museums | Jul 5, 2017

Addition by subtraction: Art Share L.A. renovation strips away its acquired superfluity

The redesign of the 28,000-sf building is prioritizing flexibility, openness, and connectivity.

boombox1 - default
boombox2 -
native1 -

More In Category

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021