flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

An adjacent community center enhances South Bend’s library

Libraries

An adjacent community center enhances South Bend’s library

This $40 million renovation and addition are part of a larger urban revitalization scheme.


By John Caulfield, Senior Editor | January 12, 2023
The renovated library and new Community Learning Center in South Bend, Ind.
South Bend, Ind.'s Main Library (left) has been renovated, and is now linked by an outdoor courtyard to a new Community Learning Center. Both are expected to draw more people to the downtown area. Images: Miller + Miller Architectural Photography

Fourteen months ago, the city of South Bend, Ind., unveiled its newly renovated Main Library that local officials were hopeful would expand economic activity and provide the community with more flexible meeting spaces.

A team that included Robert A.M. Stern Architects (RAMSA) had updated 85,000 sf of the existing 116,500-sf library, and added a new 40,000-sf Community Learning Center. This $40 million project, which occupies a 3.4-acre block, was a partnership between St. Joseph County, the city, and the Community Foundation of St. Joseph County.

The library, which before its renovation had been drawing more than 1,000 daily visitors, has been a magnetic force for downtown South Bend since at least the 1950s. That attraction was predicted to strengthen now that the library is connected to the standalone Community Learning Center (built on what had been a vacant lot) via a new outdoor courtyard. The Community Learning Center includes offices, classrooms, study spaces, a coffee shop, computer lab, and tech center with a maker space with recording studios, camera equipment, and 3D printing services.

 

Maker space in Community Learning Center
South Bend's new Community Learning Center includes a maker space (above), and 252-seat auditorium.
 

Theater-auditorium in Community Learning Center

“In the short time that the library has been back open to the public, it’s been amazing to witness firsthand how much the community has embraced this building and begun to make it their own,” said Trish Coleman, former Chief Public Service Officer at the St. Joseph County Public Library.

A city turning the corner

 

Community Learning Center in downtown South Bend, Ind.
The addition of a 40,000-sf Learning Center is part of South Bend's revitalization plan.
 

The library’s renovation included new windows combined with interior glass partitions. RAMSA collaborated with Boss design to create a children’s play area for learning and exploration. A teenage-focused exhibition space hosts rotating interactive displays.

The Building Team on this project included Arkos Design (AOR), Ziolkowski Construction (GC), Bulley & Andrews (CM), Circle Design Group (MEP and Civil engineering), Fink Roberts Petri (SE), Cerami & Associates (Security and Acoustics), Fisher Moranitz Stone (Lighting), Simpson Gumpertz & Heger (Envelope), and Custom Sound Designs (A/V).

The library’s renovation and expansion coincide with a decade-long revitalization of South Bend, home to Notre Dame University, which has recently seen growth in its population to an estimated 104,000. A planned removal of four cloverleafs and access ramps is prelude to an envisioned development of a 130-acre mixed-use district along the St. Joseph River that has already emerged as a culinary and event area.

Tags

Related Stories

| Jun 7, 2013

First look: Austin breaks ground on 'light-filled' Central Library

The design scheme by Lake|Flato and Shepley Bulfinch incorporates reading "porches" and a light-filled, six-story atrium.

| Jun 5, 2013

USGBC: Free LEED certification for projects in new markets

In an effort to accelerate sustainable development around the world, the U.S. Green Building Council is offering free LEED certification to the first projects to certify in the 112 countries where LEED has yet to take root.

| Jun 3, 2013

Construction spending inches upward in April

The U.S. Census Bureau of the Department of Commerce announced today that construction spending during April 2013 was estimated at a seasonally adjusted annual rate of $860.8 billion, 0.4 percent above the revised March estimate of $857.7 billion.

| May 29, 2013

6 award-winning library projects

The Anacostia Neighborhood Library in Washington, D.C., and the renovation of Cass Gilbert’s grand Beaux-Arts library in St. Louis are among six projects to be named 2013 AIA/ALA Library Building Award winners.

| May 21, 2013

7 tile trends for 2013: Touch-sensitive glazes, metallic tones among top styles

Tile of Spain consultant and ceramic tile expert Ryan Fasan presented his "What's Trending in Tile" roundup at the Coverings 2013 show in Atlanta earlier this month. Here's an overview of Fasan's emerging tile trends for 2013.

| Apr 30, 2013

Tips for designing with fire rated glass - AIA/CES course

Kate Steel of Steel Consulting Services offers tips and advice for choosing the correct code-compliant glazing product for every fire-rated application. This BD+C University class is worth 1.0 AIA LU/HSW.

| Apr 24, 2013

North Carolina bill would ban green rating systems that put state lumber industry at disadvantage

North Carolina lawmakers have introduced state legislation that would restrict the use of national green building rating programs, including LEED, on public projects.

| Apr 24, 2013

Los Angeles may add cool roofs to its building code

Los Angeles Mayor Antonio Villaraigosa wants cool roofs added to the city’s building code. He is also asking the Department of Water and Power (LADWP) to create incentives that make it financially attractive for homeowners to install cool roofs.

| Apr 11, 2013

George W. Bush Presidential Center achieves LEED Platinum certification

The George W. Bush Presidential Center announced today it has earned Platinum certification by the U.S. Green Building Council’s Leadership in Energy and Environmental Design program. The Bush Center is the first presidential library to achieve LEED Platinum certification under New Construction.

| Apr 5, 2013

Snøhetta design creates groundbreaking high-tech library for NCSU

The new Hunt Library at North Carolina State University, Raleigh, incorporates advanced building features, including a five-story robotic bookBot automatic retrieval system that holds 2 million volumes in reduced space.

boombox1 - default
boombox2 -
native1 -

More In Category

Libraries

New mass timber Teddy Roosevelt library aims to be one with nature

On July 4, 2026, the Theodore Roosevelt Presidential Library is scheduled to open on 93 acres in Medora, a town in North Dakota with under 130 permanent residents, but which nonetheless has become synonymous with the 26th President of the United States, who lived there for several years in the 1880s.


Giants 400

Top 20 Public Library Construction Firms for 2023

Gilbane Building Company, Skanska USA, Manhattan Construction, McCownGordon Construction, and C.W. Driver Companies top BD+C's ranking of the nation's largest public library general contractors and construction management (CM) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report. 


Giants 400

Top 30 Public Library Engineering Firms for 2023

KPFF Consulting Engineers, Tetra Tech High Performance Buildings Group, Thornton Tomasetti, WSP, and Dewberry top BD+C's ranking of the nation's largest public library engineering and engineering/architecture (EA) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.


Giants 400

Top 50 Public Library Architecture Firms for 2023

Quinn Evans, McMillan Pazdan Smith, PGAL, Skidmore, Owings & Merrill, and Gensler top BD+C's ranking of the nation's largest public library architecture and architecture/engineering (AE) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021