flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Acoustical ceiling clouds soar above GE Customer Experience Center

Sponsored Content Ceilings

Acoustical ceiling clouds soar above GE Customer Experience Center

They provide dynamic aesthetic along with desired sound absorption


By Armstrong Ceiling & Wall Solutions | May 14, 2018

Formations acoustical ceiling clouds from Armstrong Ceiling Solutions provide a dynamic aesthetic along with desired sound absorption at the GE Customer Experience Center (CEC).

The Customer Experience Center (CEC) at the GE Advanced Manufacturing Works in Greenville, SC not only showcases the history, progression, and manufacturing advancements of the GE brand, but also hosts a multitude of corporate events. As a result, the design team at MCA Architecture in Greenville looked to create a multi-functional open space that was both dynamic and energetic.

To meet the design intention, the team selected Formations acoustical clouds from Armstrong® Ceiling Solutions. Available in 19 shapes and sizes, Formations cloud systems consist of 2’x 2’ ceiling panels with factory-finished, pre-cut corners, and a kit containing all the pre-cut-to-length, ready-to-assemble suspension system and perimeter trim components required to create the cloud.

The kits include StrongBack carrying channel which eliminates 40% of the cables, minimizing visible hangar wires. As a result, kits assemble and install up to 50% faster than stick-built clouds.  In total, 53 circular clouds ranging in diameter from 6 feet to 14 feet were installed in the CEC.

 

In total, 53 Formations circular acoustical ceiling clouds ranging in diameter from 6 feet to 14 feet were installed in the CEC.

 

Met Design, Schedule, Budget Requirements

According to project architect, Michael Kissam, the Formations ceiling system was selected for several reasons. “First,” he says, “we were looking for a ceiling treatment that was not static or overbearing but evoked a sense of movement, dynamism, and progression. 

“Second, we were under an extremely aggressive schedule that had to be completed in nine months from design start to customer occupancy. The Formations cloud kits provided a unique advantage because the clouds could be fabricated on ground level and raised to their finish elevations at the last possible moment. This installation sequence allowed for the necessary overhead utility work to be completed while mitigating the ceiling grid and tile damage that is a reoccurring problem for typical project close-outs.

“Last, we needed a cost effective ceiling system that could meet the design intent, construction schedule, and budget,” he adds. “The Formations cloud kits delivered on all fronts.”

 

Aesthetics, Acoustics Key Considerations

Kissam notes that the project aesthetic was an important consideration as well because the space is a showcase for GE and its worldwide customers. “The finished product and function of the Formations acoustical clouds exceeded our design intention and, more importantly, the customer’s expectations,” he states.

He also reports that because the CEC is designed to accommodate a variety of different functions, the acoustics of the space had to be multifarious. “The majority of the surfaces are glass walls and ceramic tile flooring, so the ceiling system was our only opportunity to control the acoustics,” he explains.  “By layering and overlapping the clouds, the ceiling system created a baffling effect that proved to be highly effective.”

 

For additional information on Armstrong Formations Acoustical Clouds, visit armstrongceilings.com/formations.

Related Stories

| Dec 14, 2011

Tyler Junior College and Sika Sarnafil team up to save energy

Tyler Junior College wanted a roofing system that wouldn’t need any attention for a long time.

| Dec 10, 2011

10 Great Solutions

The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Nov 29, 2011

First EPD awarded to exterior roof and wall products manufacturer

EPD is a standardized, internationally recognized tool for providing information on a product’s environmental impact. 

| Nov 28, 2011

Armstrong acquires Simplex Ceilings

Simplex will become part of the Armstrong Building Products division.

| Oct 17, 2011

THOUGHT LEADER: Allan Bilka, Senior Staff Architect and Secretariat to the IGCC

Allan Bilka, RA, is a Senior Staff Architect and Secretariat to the International Green Construction Code (IgCC) with the International Code Council, based in the ICC’s Chicago district office. He also serves as staff liaison to the ICC-700 National Green Building Standard. He has written several ICC white papers on green building and numerous green-related articles for the ICC. A registered architect, Bilka has over 30 years of combined residential design/build and commercial consulting engineering experience.

| Sep 27, 2011

Steel Joist Institute announces October webinar on Open Web Steel Joists

Webinar participants can earn 0.15 CEUs or 1.5 PDHs.

| Sep 12, 2011

Morgan Thermal Ceramics’ system for installing grease duct enclosures achieves UL listing

Updated installation results in 33% space savings.

| Sep 9, 2011

Kauffman Center for the Performing Arts in Kansas City opens this month

Theatre Projects played the lead role in theatre design and planning as well as in engineering the customized theatre equipment. BNIM in Kansas City served as the executive architect.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021