flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

2021 multifamily housing outlook: Dallas, Miami, D.C., will lead apartment completions

Multifamily Housing

2021 multifamily housing outlook: Dallas, Miami, D.C., will lead apartment completions

The U.S. multifamily construction market remains strong amid the coronavirus pandemic, especially near high-growth metros. 


By BD+C Staff | January 27, 2021
2021 multifamily housing outlook

Photo: Pexels

    

In its latest outlook report for the multifamily rental market, Yardi Matrix outlined several reasons for hope for a solid recovery for the multifamily housing sector in 2021, especially during the second half of the year. 

While multifamily owners, developers, and property managers collectively braced for severe drops in rent growth, construction starts, project completions, and availability of capital amid the COVID-19 pandemic, the drastic declines never materialized.

Rent growth did take a step back in select markets, especially in "high-cost gateway" metros like San Jose (-13.7%) and San Francisco (-9.4%), as renters continued to leave pricey urban neighborhoods for less-dense, cheaper suburban areas.

But on the flip side, "many tertiary and tech hub markets have benefited from migration out of the gateways," wrote the authors of the Yardi Matrix report. Secondary and tech markets like the Inland Empire, Sacramento, Tampa, and Las Vegas all saw solid rent growth in 2020. 

 

Multifamily construction pipeline for 2021

Other than the temporary shutdowns of work sites during the pandemic, construction work on multifamily housing developments continued to hum along through 2020 and into 2021. In all, 285,000 multifamily units were delivered throughout U.S. markets in 2020, down about 7% from 2019, but not nearly as severe a drop as many had predicted.

According to Yardi Matrix, the multifamily sector has a "robust pipeline" of new projects, with some 765,000 units in some stage of construction as of early 2021. This "should keep deliveries above that 300,000 mark for the next few years." The firm projects 327,718 units will be delivered in 2021. 

Here are the top 25 multifamily markets for 2021 (total number of construction completions, % growth in completions YOY):

1. Dallas: 22,909 completions (+12.1% YOY)
2. Miami: 16,262 (+66.3%)
3. Washington, D.C.: 14,541 (+50.5%)
4. Houston: 11,500 (-3.1%)
5. Los Angeles: 11,296 (+16.5%)
6. Atlanta: 10,939 (+9.7%)
7. Austin: 10,301 (-10.0%)
8. Seattle: 9,816 (+29.9%)
9. Phoenix: 9,334 (+13.6%)
10. Denver: 8,653 (-29.7%)
11. Boston: 8,449 (+20.8%)
12. Chicago: 7,797 (+0.8%)
13. New York City: 7,335 (+24.2%)
14. San Francisco: 7,166 (+64.8%)
15. Twin Cities: 6,760 (+4.9%)
16. Charlotte: 6,692 (+55.3%)
17. Orlando: 6,662 (+21.5%)
18. Philadelphia: 6,071 (+27.7%)
19. Nashville: 5,457 (+41.1%)
20. Tampa–St. Petersburg: 5,103 (+20.1%)
21. San Antonio: 4,960 (-6.5%)
22. New Jersey–Northern: 4,955 (+29.9%)
23. Salt Lake City: 4,633 (-0.6%)
24. Louisville: 4,484 (+215.6%)
25. White Plains: 4,464 (+199.6%) 
 
DOWNLOAD THE FULL REPORT

Related Stories

| Oct 16, 2014

Perkins+Will white paper examines alternatives to flame retardant building materials

The white paper includes a list of 193 flame retardants, including 29 discovered in building and household products, 50 found in the indoor environment, and 33 in human blood, milk, and tissues.

| Oct 15, 2014

Harvard launches ‘design-centric’ center for green buildings and cities

The impetus behind Harvard's Center for Green Buildings and Cities is what the design school’s dean, Mohsen Mostafavi, describes as a “rapidly urbanizing global economy,” in which cities are building new structures “on a massive scale.” 

| Oct 15, 2014

Final touches make 432 Park Avenue tower second tallest in New York City

Concrete has been poured for the final floors of the residential high-rise at 432 Park Avenue in New York City, making it the city’s second-tallest building and the tallest residential tower in the Western Hemisphere.

| Oct 14, 2014

Richard Meier unveils design for his first tower in Taiwan

Taiwan will soon have its first Richard Meier building, a 535-foot apartment tower in Taichung City, the country’s third-largest city.

| Oct 12, 2014

AIA 2030 commitment: Five years on, are we any closer to net-zero?

This year marks the fifth anniversary of the American Institute of Architects’ effort to have architecture firms voluntarily pledge net-zero energy design for all their buildings by 2030. 

| Oct 7, 2014

Analysis: Student loans will cost housing industry $83 billion in 2014

More than 410,000 single- and multifamily home sales will be lost in 2014 due to student loan debt, according to analysis by John Burns Real Estate Consulting.

| Oct 7, 2014

Economic gains are rallying rents in Raleigh, N.C.

The greater Raleigh, N.C., market appears to be getting back on its feet again, which is good news for rental property owners.

| Oct 3, 2014

Herzog & de Meuron unveil design for Manhattan hotel-condo tower [slideshow]

Herzog & de Meuron will partner with interior designer John Pawson to design a 28-story tower for Manhattan's Bowery district. The majority of the building will house a 370-room hotel, with 11 luxury residences on its top. 

| Sep 25, 2014

Look to history warily when gauging where the construction industry may be headed

Precedents and patterns may not tell you all that much about future spending or demand.

| Sep 24, 2014

Architecture billings see continued strength, led by institutional sector

On the heels of recording its strongest pace of growth since 2007, there continues to be an increasing level of demand for design services signaled in the latest Architecture Billings Index.

boombox1 - default
boombox2 -
native1 -

More In Category

MFPRO+ News

World’s largest 3D printer could create entire neighborhoods

The University of Maine recently unveiled the world’s largest 3D printer said to be able to create entire neighborhoods. The machine is four times larger than a preceding model that was first tested in 2019. The older model was used to create a 600 sf single-family home made of recyclable wood fiber and bio-resin materials.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021