flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

18-story residential tower breaks ground near Temple University

Mixed-Use

18-story residential tower breaks ground near Temple University

The tower will provide apartment units for students and young professionals.


By David Malone, Associate Editor | November 1, 2017
The residential entrance to The Nest at 1324 N. Broad St

Rendering courtesy of Bock Development Group and Cecil Baker + Partners

A new 18-story glass tower, named The Nest at 1324 N. Broad St, recently broke ground and will provide Temple University students and young professionals with 192 apartment units. The building will offer studio, two-, and three-bedroom apartments located above ground floor commercial space and second floor amenities.

The Nest at 1324 N. Broad St. will combine contemporary architecture and a community-minded exterior to create a housing option that connects its residents to the surrounding neighborhood. The façade will be composed of a metal and glass window wall system while brownstone piers will demarcate the separate retail entrance and reflect the materials of the adjacent New Freedom Theatre.

 

Looking south at The Nest at 1324 N. Broad StRendering courtesy of Bock Development Group and Cecil Baker + Partners.

 

A landscaped garden will engage the street and a cantilever featuring a marquee will provide cover along the path from Broad Street to the residential lobby entrance. An outdoor garden court will offer outdoor seating and can be used by residents and patrons of the ground floor commercial space. On the south side of the building, a rain garden will collect rainwater runoff.

The completed apartments will come fully furnished and provide access to the building’s amenities, such as an outdoor terrace with a fire pit, a game lounge, an event lounge, a fitness center, a tech center, and four study lounges. Indoor bicycle parking will also be provided on the first floor.

The building, which was designed by Cecil Baker + Partners and developed by Bock Development Group, is slated for completion in August 2019.

Related Stories

| Apr 3, 2012

Luxury hotel 'groundscraper' planned in abandoned quarry

Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

| Jan 15, 2012

Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.

The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.

| Dec 27, 2011

Ground broken for adaptive reuse project

Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.

| Dec 19, 2011

Chicago’s Aqua Tower wins international design award

Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.

| Dec 12, 2011

Mojo Stumer takes top honors at AIA Long Island Design Awards

Firm's TriBeCa Loft wins "Archi" for interior design.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 3, 2011

Hardin Construction tops out Orlando Embassy Suites

The project began in April 2011 and is expected to open in fall 2012.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021