flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Winners of the 2014 Architecture at Zero competition announced

Winners of the 2014 Architecture at Zero competition announced

The competition challenged design teams to create zero-net-energy buildings for the Jack London Gateway project site in Oakland, Calif. 


By BD+C Staff | January 14, 2015

The fourth annual Architecture at Zero competition, sponsored by the Pacific Gas and Electric Company, has wrapped up, with five design concepts selected as winners

The competition challenged design teams to create zero-net-energy (ZNE) buildings for the Jack London Gateway project site in Oakland, Calif. It involved two parts: affordable family housing over a childcare center or wellness clinic, and market-rate housing over a grocery store.

The California Public Utility Commission has a goal for new residential buildings to be ZNE by 2020, and for new commercial buildings to be ZNE by 2030. The Architecture at Zero competition is an attempt to make this goal a reality. It's open to students, architects, landscape architects, urban planners, engineers, and designers all over the world.

Check out the five award winners:

 

Merit Award – Student


Image Courtesy of Architecture at Zero

Gateway Residences
Judson University 
Elgin, IL 
Project Manager: Eric Blowers
Sustainability Specialist: Jaclein Ely
Designer: David Merlo
Detail Drawing Manager: Kathryn Husar
Diagrams/Illustrations Specialist: Peter Lukacs
Sponsored Faculty Member: Keelan Kaiser

 

 

Merit Award – Student 


Image Courtesy of Architecture at Zero

The Wave
University of Aalborg 
Copenhagen, Denmark 
Project Architects & Engineers: Elias Mohr Jensen, Jonas Snedevind Nielsen and Henrik Jacobsen

 

 

Honor Award - Professional


Image Courtesy of Architecture at Zero

Embracing Limits
3r studio 
Oakland, CA 
Project Architects: Le Pham and Mai Tran
Energy Consultant: Hung Dang

 

 

Honor Award - Professional


Image Courtesy of Architecture at Zero

Symbiosis
Montreal, Canada 
Team: Rocio Carvajo Lucena, Architect, LEED, Sergio Carretero Gomez, Architect, Josiane Crampé, M. Architect, and Geoffrey Diackiw, M. Architect

 

 

Special Recognition Award - Professional


Image Courtesy of Architecture at Zero

Flourish
SERA & Glumac 
Portland, OR 
Project Manager/Designer/Technical Documents: Katie Felver
Designer/Technical Documents: Nathan Burton
Designer/Graphics: Artur Grochowski
Graphics Assist: Jodi Hanson
Designer Biophilia Specialist: Matt Piccone
Designer: Jeffrey Maas
Project Engineer/Energy Modeler: Brian Goldsmith
Envelope Advisor: Mark Perepelitza
Design Advisor: Jeff Roberts
Project Management/Daylight Advisor: Lisa Petterson
Energy Advisor: Chris Lowen
Energy Advisor: James Thomas

Related Stories

| Aug 11, 2010

Draft NIST report on Cowboys practice facility collapse released for public comment

A fabric-covered, steel frame practice facility owned by the National Football League’s Dallas Cowboys collapsed under wind loads significantly less than those required under applicable design standards, according to a report released today for public comment by the Commerce Department's National Institute of Standards and Technology (NIST).

| Aug 11, 2010

ASHRAE releases free BIM introductory guide

A newly released guide from ASHRAE on building information models and building information modeling (BIM) serves as a resource for professionals considering BIM tools and applications for their businesses. According to "An Introduction to Building Information Modeling," BIM is “a digital representation of the physical and the functional characteristics of a facility.” Unlike 2D or 3D CAD, BIM software utilizes intelligent objects to create models.

| Aug 11, 2010

An Innovative Energy-Absorbing Anti-Terrorism Crash Barrier for Homeland Security

Anti-terrorism physical barrier techniques and applications have become highly desired to protect critical facilities and human lives in recent years. Based on in-depth review and practices, the systemic criteria are proposed here for selection of security barriers specifically against terrorist attacks with truck-borne explosives.

| Aug 11, 2010

NoricF4 custom metal ICF frames receive fire ratings, comply with antiterrorism standards for buildings

Reward Wall Systems' NoricF4 Custom Metal ICF Frames have received fire ratings of 1.5 hours to 3 hours and they have been evaluated to be in compliance with the prescriptive requirements of the Department of Defense Minimum Antiterrorism Standards for Buildings for blast/force protection.

| Aug 11, 2010

Embassy's dual façades add security and beauty

The British government's new 46,285-sf embassy building in Warsaw, Poland's diplomatic quarter houses the ambassador's offices, the consulate, and visa services on three floors. The $20 million Modernist design by London-based Tony Fretton Architects features a double façade—an inner concrete super structure and an outer curtain wall.

| Aug 11, 2010

Cost of HVAC equipment to remain flat in 2009, says Turner

While some manufacturers have announced slight increases in facilities equipment pricing for 2009, the average cost of equipment is expected to remain flat in 2009, according to the 2009 Turner Logistics Equipment Cost Index. However, equipment pricing could face increased pressure if there is a further decline in market demand.

| Aug 11, 2010

Toronto mandates green roofs

The city of Toronto late last month passed a new green roof by-law that consists of a green roof construction standard and a mandatory requirement for green roofs on all classes of new buildings. The by-law requires up to 50% green roof coverage on multi-unit residential dwellings over six stories, schools, nonprofit housing, and commercial and industrial buildings.

| Aug 11, 2010

Wisconsin becomes the first state to require BIM on public projects

As of July 1, the Wisconsin Division of State Facilities will require all state projects with a total budget of $5 million or more and all new construction with a budget of $2.5 million or more to have their designs begin with a Building Information Model. The new guidelines and standards require A/E services in a design-bid-build project delivery format to use BIM and 3D software from initial ...

| Aug 11, 2010

7 Tips for Installing Moisture Barriers

If you took a poll of building envelope and construction forensic experts, it's likely that moisture barriers would be high on the list of most poorly understood products used in wall assemblies. Besides deciding which type of barrier to use under various climate conditions, Building Teams must confront the nasty matter of how to install them correctly.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021