Upgrade brings comfort and efficiency to Euclid Chemical

Sponsored Content Energy Efficiency

Upgrade brings comfort and efficiency to Euclid Chemical

Euclid Chemical upgrades to a dependable and efficient system that will meet their needs for years to come.


By LG | December 20, 2016

Euclid Chemical, based in Cleveland, has been supplying the construction industry with products to improve the strength, appearance, and usability of concrete since 1910. Now a large, multi-national corporation, Euclid Chemical’s main offices are in a two-story, 15,000 square foot building that also contains laboratories where they develop products ranging from sealants to micro synthetic fibers. 

Until recently, the building relied upon an aging VAV system with terminal reheat to keep their offices comfortable and to maintain environmental conditions in the laboratories.  Even when new, records showed the system had not performed as designed. This inadequate performance was compounded by cumulative effects of years of normal wear and tear along with questionable modifications. 

Ultimately, the system no longer kept people comfortable, broke down frequently and was incredibly inefficient.  After analyzing the utility bills, Joe Messer, Director of Engineering for Euclid Chemical, realized that building had an average annual energy use of 38 kWh/square foot -- over twice the average consumption for offices in the same geographic area, and more than most of Euclid’s manufacturing facilities. Messer knew Euclid Chemical needed to upgrade to a dependable and efficient system that would meet their needs for years to come.

CRITERIA:

The building housed both office areas and laboratories, so throughout the facility the system had to provide individual temperature control which, at any given time, may require both heating and cooling in different areas.

In the lab, the system also had to account for the unique challenge of quickly adapting to rapidly changing make-up air requirements as laboratory fume hoods started and stopped.  It also had to work in the Ohio climate where the outdoor temperature ranged from sub-zero weather in the winter to humid high-90’s in the summer.  But above all else, the system had to have a manageable upfront cost and an attractive payback to the Euclid financial team. 

SOLUTION: 

Messer began the process of finding a new solution and reached out to trusted engineer Andy Culberson of Geisel Heating and Cooling.  Culberson identified VRF (Variable Refrigerant Flow) technology as the optimum solution, and reached out to Peter Eno of Refrigeration Sales Corporation to collaborate on a best-in-class solution based on VRF technology from LG Electronics.  Together they designed a system around LG Multi-V heat recovery systems. 

The bulky 50 ton DX unit on the roof was replaced by a pair of small air-cooled outdoor units on the ground, and the VAV boxes inside the building were replaced with LG’s concealed high-static VRF indoor units. To account for the need for ventilation air and makeup air when the laboratory fume hoods were in use, a small makeup air unit with a water heating coil was added to provide ventilation air at a high-static pressure to the LG VRF indoor units. Since this was 100 percent outdoor air, the airflow could be adjusted to precisely meet the ventilation requirements as they changed.  The LG Multi V is a heat recovery system, so it can heat the zones that need it while cooling others simultaneously which delivers precise temperature in all parts of the facility regardless of Ohio’s weather, including subzero winters.  

After they presented the system proposal, everyone at Euclid Chemical was sold on the concept. Based on the problems and poor performance of the existing system, Messer conservatively estimated the new system would cut their utility bills by 40 percent. What’s more, they could reuse the existing distribution and supply ductwork, reducing upfront installation costs, which further sold the financial team.     

RESULTS:

Once construction was completed, the system performance exceeded expectations, according to Messer.  After implementation, the facility saw a 70 percent annual energy reduction compared to the average of the previous five years. (See graph.)  

Equally important, the new system provides a quiet, comfortable environment for people to work.  “Employees have definitely noticed an improvement in comfort,” said Messer.  “This allowed us to focus on our core business instead of worrying about HVAC.”  He is currently evaluating other buildings within the Euclid portfolio and, not surprisingly, he’s considering LG VRF solutions

Related Stories

Sustainability | Apr 10, 2018

Thermal comfort, big impact

CallisonRTKL’s Pablo La Roche explains how outdoor thermal comfort could mitigate the effects of climate change.

Sustainability | Apr 9, 2018

Planning for 100: Looking beyond the horizon of zero-net-energy buildings

Imagine a future where buildings and infrastructure are 100% utilized and 100% responsive.

Energy Efficiency | Apr 4, 2018

A new energy metric for building design and operations

A building with a higher occupant density may have a higher energy use, but expend less energy per person.

K-12 Schools | Jan 24, 2018

Hawaii’s first net-zero public school

G70 is the architect, planner, and civil engineer of record for the project.

Energy | Jan 12, 2018

Putting wastewater to work: America’s next great energy source

As much as 40 to 50% of a building’s energy literally goes down the drain every day.

Energy | Jan 11, 2018

Harvesting energy and profits: A new approach to MEP cost analysis

In the course of providing cost estimating services, educating the client on making prudent choices is a high priority.

Energy Efficiency | Dec 19, 2017

New building energy quotient portal gives quick analysis on energy performance

ASHRAE tool provides more automated approach to receive Building EQ Performance Score.

K-12 Schools | Oct 28, 2017

A new elementary school in Cambridge, Mass., aims at being a pilot for that city’s NZE commitment

The building’s programming will provide more access to the community at large. 

Codes and Standards | Oct 23, 2017

Energy efficiency investments on the rise; will increase next year

Survey of facility management executives shows onsite renewables, energy storage will spike in 2018.

Energy Efficiency | Sep 15, 2017

To reach ambitious energy targets, firms must dig deeper

The number of firms involved in AIA’s voluntary pact to slash energy consumption in buildings grew to more than 400 in July.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021