flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Top K-12 School Sector Engineering Firms [2013 Giants 300 Report]

Top K-12 School Sector Engineering Firms [2013 Giants 300 Report]

AECOM, URS, STV top Building Design+Construction's 2013 ranking of the largest K-12 school sector engineering and engineering/architecture firms in the U.S.


By BD+C Staff | July 22, 2013
Rank Company 2012 K-12 Revenue ($)
1 AECOM Technology Corp. $100,150,000
2 URS Corp. $55,927,778
3 STV $45,937,000
4 Jacobs Engineering Group $36,550,000
5 Parsons Brinckerhoff $19,100,000
6 TTG $9,985,300
7 Shive-Hattery $7,379,425
8 BRPH $4,900,000
9 KCI Technologies $4,200,000
10 Dewberry $3,852,971
11 KJWW Engineering Consultants $3,643,844
12 Thornton Tomasetti $3,589,317
13 Wiss, Janney, Elstner Associates $3,570,000
14 Joseph R. Loring & Associates $3,500,000
15 KPFF Consulting Engineers $3,000,000
16 M/E Engineering $2,779,150
17 Interface Engineering $2,745,564
18 Simpson Gumpertz & Heger $2,700,000
19 CJL Engineering $2,507,621
20 Rist-Frost-Shumway Engineering $2,500,000
21 FBA Engineering $2,405,000
22 Allen & Shariff $2,200,000
23 Coffman Engineers $2,140,000
24 Heapy Engineering $2,086,975
25 Bridgers & Paxton Consulting Engineers $2,024,266
26 RDK Engineers $1,975,000
27 AKF Group $1,576,000
28 Vanderweil Engineers $1,553,500
29 French & Parrello Associates $1,500,000
30 SSOE Group $1,473,611
31 Glumac $1,404,000
32 Peter Basso Associates $1,400,000
33 Wallace Engineering $1,350,000
34 Henderson Engineers $1,118,069
35 Brinjac Engineering $1,080,748
36 Clark Nexsen $1,063,791
37 G&W Engineering $1,000,000
37 KLH Engineers $1,000,000
37 WSP USA $1,000,000
40 TLC Engineering for Architecture $933,884
41 H.F. Lenz $847,000
42 Davis, Bowen & Friedel $833,642
43 Sparling $785,356
44 Primera Engineers $748,000
45 M-E Engineers $700,000
46 Environmental Systems Design $610,185
47 Paulus, Sokolowski and Sartor $500,000
48 RMF Engineering Design $500,000
49 OLA Consulting Engineers $400,000
50 Rolf Jensen & Associates $400,000
51 Karpinski Engineering $379,369
52 Bala Consulting Engineers $350,000
53 Eaton Energy Solutions $312,320
54 Wick Fisher White $300,697
55 Apogee Consulting Group $278,000
56 Arup $251,475
57 Aon Fire Protection Engineering $200,000
57 GHT Limited $200,000
59 Mazzetti $182,262
60 Dunham Associates $150,000
61 GRW $135,860
62 Magnusson Klemencic Associates $109,780
63 Science Applications International Corp. $109,282
64 Barge, Waggoner, Sumner and Cannon $100,000
64 CTLGroup $100,000
66 Degenkolb Engineers $97,850
67 P2S Engineering $86,100
68 Spectrum Engineers $83,820
69 Affiliated Engineers $55,000
70 Kamm Consulting $45,861
71 Newcomb & Boyd $42,814
72 Haynes Whaley Associates $34,139
73 Walter P Moore $29,068

 

Back to the K-12 School Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

Standards | Apr 22, 2024

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.

Building Materials | Apr 22, 2024

Tacoma, Wash., investigating policy to reuse and recycle building materials

Tacoma, Wash., recently initiated a study to find ways to increase building material reuse through deconstruction and salvage. The city council unanimously voted to direct the city manager to investigate deconstruction options and estimate costs. 

Student Housing | Apr 19, 2024

$115 million Cal State Long Beach student housing project will add 424 beds

A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.

Construction Costs | Apr 18, 2024

New download: BD+C's April 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.

MFPRO+ New Projects | Apr 16, 2024

Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn

The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.

Construction Costs | Apr 16, 2024

How the new prevailing wage calculation will impact construction labor costs

Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.

Healthcare Facilities | Apr 16, 2024

Mexico’s ‘premier private academic health center’ under design

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

Market Data | Apr 16, 2024

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.

Laboratories | Apr 15, 2024

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.

Codes and Standards | Apr 12, 2024

ICC eliminates building electrification provisions from 2024 update

The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021