flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Top 60 K-12 School Engineering Firms

Top 60 K-12 School Engineering Firms

AECOM, Jacobs, and STV top Building Design+Construction’s annual ranking of the nation’s largest K-12 school sector engineering and E/A firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 1, 2016

The 18,884-sf Collegiate Center addition to Thomas Edison Prepatory High School, Tulsa, Okla., has a floating cantilever study lounge. Two multipurpose rooms double as FEMA-361 safe rooms that can each protect up to 600 persons from winds up to 240 mph. The $4.4 million addition provides 15 distinct spaces. KSQ Design led the Building Team, with the assistance of Wallace Engineering (SE), AEG Engineering, and Crossland Construction (GC). Photo courtesy KSQ Design

 

TOP 60 K-12 SCHOOL ENGINEERING FIRMS
Rank Firm 2015 Revenue
1 AECOM $50,000,000
2 Jacobs $47,790,000
3 STV $10,618,628
4 KJWW / TTG $9,576,078
5 Wendel $6,321,646
6 Loring Consulting Engineers $6,000,000
7 SSOE Group $5,830,000
8 Dewberry $5,245,499
9 KCI Technologies $5,000,000
10 M/E Engineering $4,688,355
11 Interface Engineering $4,648,596
12 Shive-Hattery $4,444,746
13 Walter P Moore $4,383,887
14 Wiss, Janney, Elstner Associates $3,820,000
15 Coffman Engineers $3,477,402
16 Bridgers & Paxton Consulting Engineers $3,463,318
17 Global Engineering Solutions $3,275,000
18 Simpson Gumpertz & Heger $2,655,000
19 Henderson Engineers $2,609,752
20 Bala Consulting Engineers $2,585,000
21 H.F. Lenz Company $1,939,675
22 Glumac $1,864,154
23 KCL Engineering $1,799,671
24 Heapy Engineering $1,625,957
25 Peter Basso Associates $1,584,834
26 RMF Engineering $1,466,500
27 Thornton Tomasetti $1,398,507
28 Highland Associates $1,300,000
29 JQ Engineering $1,251,500
30 Fishbeck, Thompson, Carr & Huber $1,200,000
31 Vanderweil Engineers $1,087,600
32 CJL Engineering, Inc. $1,080,744
33 I. C. Thomasson Associates $1,057,400
34 RDK Engineers $1,016,785
35 Rist-Frost-Shumway Engineering $1,000,000
36 Karpinski Engineering $1,000,000
37 TLC Engineering for Architecture $960,783
38 P2S Engineering $891,407
39 Graef $845,962
40 Baird, Hampton & Brown $824,059
41 OLA Consulting Engineers $800,034
42 William Tao & Associates $756,935
43 JBA Consulting Engineers $650,667
44 KLH Engineers $604,408
45 KZF Design $592,946
46 Primera Engineers $547,143
47 dbHMS $537,600
48 Wallace Engineering $500,000
49 ME Engineers $500,000
50 Newcomb & Boyd $427,804
51 Davis, Bowen & Friedel $414,817
52 Architectural Engineers $394,865
53 G & W Engineering Corp. $350,090
54 Cardno Haynes Whaley $323,309
55 Spectrum Engineers $141,327
56 CTLGroup $100,000
57 Dunham Associates $100,000
58 GHT Limited $100,000
59 Apogee Consulting Group $70,000
60 Zak Companies $50,807
61 Ghafari Associates $50,000
62 Magnusson Klemencic Associates $20,143
63 Sherlock, Smith & Adams $7,000
64 Luckett & Farley $3,703

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| Feb 15, 2012

NAHB sees gradual improvement in multifamily sales for boomers

However, since the conditions of the current overall housing market are limiting their ability to sell their existing homes, this market is not recovering as quickly as might have been expected.

| Feb 15, 2012

Skanska secures $87M contract for subway project

The construction value of the project is $261.9 M. Skanska will include its full share, $87 M, in the bookings for Skanska USA Civil for the first quarter 2012.

| Feb 15, 2012

Code allowance offers retailers and commercial building owners increased energy savings and reduced construction costs

Specifying air curtains as energy-saving, cost-cutting alternatives to vestibules in 3,000-square-foot buildings and larger has been a recent trend among consulting engineers and architects.

| Feb 15, 2012

Englewood Construction announces new projects with Destination Maternity, American Girl

Englewood’s newest project for Wisconsin-based doll retailer American Girl, the company will combine four vacant storefronts into one large 15,000 square-foot retail space for American Girl.

| Feb 14, 2012

Angelo State University opens doors to new recreation center expansion

  Designed by SmithGroup, the JJR_Center for Human Performance offers enhanced fitness options, dynamic gathering space.

| Feb 14, 2012

SAIC selected for architectural and engineering design services at Lajes Field, Azores

SAIC’s services will include a broad variety of new construction projects and maintenance and repair projects

| Feb 14, 2012

Skanska promotes Aparicio and hires Leintz in Southern California

Aparicio and Leintz are both based in Skanska’s Los Angeles office.

| Feb 14, 2012

The Jackson Laboratory announces Gilbane Building Co. as program manager for Connecticut facility

Gilbane to manage program for new genomic medicine facility that will create 300 jobs in Connecticut.

| Feb 14, 2012

Thornton Tomasetti names Al Hashimi vice president for its Middle East Operations

Al Hashimi is joining the company to help expand Thornton Tomasetti’s business in the region and support clients locally.

| Feb 13, 2012

WHR Architects renovation of Morristown Memorial Hospital Simon Level 5 awarded LEED Gold

Located in the Simon Building, which serves as the main entrance leading into the Morristown Memorial Hospital campus, the project comprises three patient room wings connected by a centralized nursing station and elevator lobby.

boombox1 - default
boombox2 -
native1 -

More In Category

Laboratories

The Department of Energy breaks ground on the Princeton Plasma Innovation Center

In Princeton, N.J., the U.S. Department of Energy’s Princeton Plasma Physics Laboratory (PPPL) has broken ground on the Princeton Plasma Innovation Center (PPIC), a state-of-the-art office and laboratory building. Designed and constructed by SmithGroup, the $109.7 million facility will provide space for research supporting PPPL’s expanded mission into microelectronics, quantum sensors and devices, and sustainability sciences. 




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021