flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Texas Rangers’ Globe Life Field progresses toward its 2020 completion date

Sports and Recreational Facilities

Texas Rangers’ Globe Life Field progresses toward its 2020 completion date

The stadium will be the cornerstone of the Texas Live! Development.


By David Malone, Associate Editor | April 4, 2019

All renderings courtesy HKS Architects

Globe Life Field, the Texas Rangers currently-under-construction ballpark, is progressing towards its March 2020 completion date. The ballpark is designed by HKS architects with VLK Architects acting as the associate architect. The stadium is the cornerstone of Texas Live!, a dining, entertainment, and luxury hospitality complex that has been under construction since 2016.

One of the biggest functional changes Globe Life Field will provide compared to the Rangers’ current home ballpark is the new retractable roof that will keep players out of the Texas heat. Another large change will be the synthetic playing surface from Shaw Sports Turf. The synthetic grass will provide similar aesthetics to natural grass and will be combined with natural clay basepaths.

 

Globe Life Stadium concourse

 

The $1.1 billion, 1.7 million-sf stadium will be built on a 13-acre site and have a capacity of 40,000. It will have five entry gates to ease crowd congestion upon entering and exiting the stadium. When complete, Globe Life Field will feature 725 concrete columns throughout and 780 piers drilled into the ground that make up the building foundation.

 

See Also: HKS unveils retractable-roof ballpark in Japan

 

A series of experiences for fans will include clubs, themed restaurants, retail, and a Hall of Fame exhibit. Globe Life Park will be the MLB’s first new ballpark since the Atlanta Braves Opened SunTrust Park in 2017. Manhattan Construction Company is the general contractor. Walter P Moore is the structural engineer.

 

Behind home plate at Globe Life Field

 

Outside of Globe Life Field

Related Stories

| Apr 6, 2012

Perkins Eastman unveils Qatar mixed-use sports complex

Home stadium for Lekhwiya Club a vibrant addition to Doha’s architectural identity.

| Mar 6, 2012

EwingCole completes first design-build project for the USMA

The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.

| Mar 1, 2012

Bomel completes design-build parking complex at U.C. San Diego

The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level. 

| Feb 24, 2012

Skanska hires Tingle as senior VP and national director for its Sports Center of Excellence

Tingle has worked in the architecture and construction industries for more than 30 years, and for the last 23 years, he has focused primarily on large-scale sports construction projects

| Feb 2, 2012

Shawmut Design and Construction launches sports venues division

Expansion caps year of growth for Shawmut.

| Jan 31, 2012

Fusion Facilities: 8 reasons to consolidate multiple functions under one roof

‘Fusing’ multiple functions into a single building can make it greater than the sum of its parts. The first in a series  on the design and construction of university facilities.

| Nov 29, 2011

SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China

Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 9, 2011

Sika Sarnafil Roof Recycling Program recognized by Society of Plastics Engineers

Program leads the industry in recovering and recycling roofing membrane into new roofing products.

boombox1 - default
boombox2 -
native1 -

More In Category


Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.


Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021