flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Survey: More than 75% of workload takes place without face-to-face interactions

Survey: More than 75% of workload takes place without face-to-face interactions

With the rise of technology, much of the workday is spent corresponding via email or conference call, according to a survey of corporate workers.


By Mancini•Duffy | November 5, 2014
Photo: suphakit73 via FreeDigitalPhotos.net
Photo: suphakit73 via FreeDigitalPhotos.net

Mancini•Duffy, a leading architectural and interiors firm, has released findings from The Coordinate, its periodic survey on workplace trends. The most recent survey indicates that less than one-quarter of the work performed in a single day requires a face-to-face interaction.

With the rise of technology, much of the workday—even the most productive morning hours—is spent corresponding via email or conference call. 

The survey results also show that for employees, being able to work at times that are most productive and being able to have a choice of places to work is not a case of either/or, but of both/and.  

“Employees want flexibility and choice,” said Fran Ferrone, Mancini•Duffy’s Director of Workplace Innovation. 

Additional findings highlight:
• Gen X and Y’s biggest dissatisfaction is “lack of stimulating atmosphere."
• While concentration is a problem for all, it is less so for Boomers and Traditionalists, who occupy the majority of private offices.
• Despite the trend toward collaboration, all generations say “information overheard” is over-performing.  

 

 

These findings are the second in a series of surveys being conducted by Mancini•Duffy this year to test the hypothesis of “the dissolution of the traditional workweek.” The next survey,  addressing “sources of inspiration and motivation,” will round out the series. 

Complete results (and their implications) will be published in early 2015. To participate in the Coordinate survey, visit: http://www.cvent.com/d/d4q2kp

Contact CWI@manciniduffy.com for additional information or questions about The Coordinate. 

About Mancini•Duffy
Mancini•Duffy is a full service design firm specializing in architecture, planning, interior design and graphic design services.  Founded almost 100 years ago, the firm is headquartered in New York City.  Also, as a member of IPID, International Partners in Design, Mancini•Duffy serves the diverse needs of its expanding multi-national client base across the U.S. and in Great Britain, Europe, East Asia and Australia. http://www.manciniduffy.com

Related Stories

Standards | Apr 22, 2024

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.

Building Materials | Apr 22, 2024

Tacoma, Wash., investigating policy to reuse and recycle building materials

Tacoma, Wash., recently initiated a study to find ways to increase building material reuse through deconstruction and salvage. The city council unanimously voted to direct the city manager to investigate deconstruction options and estimate costs. 

Student Housing | Apr 19, 2024

$115 million Cal State Long Beach student housing project will add 424 beds

A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.

Construction Costs | Apr 18, 2024

New download: BD+C's April 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.

MFPRO+ New Projects | Apr 16, 2024

Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn

The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.

Construction Costs | Apr 16, 2024

How the new prevailing wage calculation will impact construction labor costs

Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.

Healthcare Facilities | Apr 16, 2024

Mexico’s ‘premier private academic health center’ under design

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

Market Data | Apr 16, 2024

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.

Laboratories | Apr 15, 2024

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.

Codes and Standards | Apr 12, 2024

ICC eliminates building electrification provisions from 2024 update

The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021