flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

‘Speed to market’ defines general contractor activities in 2020

Contractors

‘Speed to market’ defines general contractor activities in 2020

Contractors are more receptive than ever to ways that help get projects done faster.


By John Caulfield, Senior Editor  | December 4, 2020
2020 Contractor Giants Walbridge_UofM StudentUnion

Walbridge teamed with architect Integrated Design Solutions on a 20-month renovation of The Michigan Union, the University of Michigan’s iconic 1919 student union. The project involved upgrades to the MEP systems and elevators, a roof replacement, and restoration of 540 of the building’s original windows. Courtesy Walbridge

   

Contractors continued to explore ways to expand their businesses, enhance collaboration, and boost productivity. 

Many pros found answers in their embrace of technology. Skanska’s project planning team developed Skanska Metriks, which provides benchmarking data to help evaluate the parameters of a building’s systems relative to similar projects. PCL Construction partnered with Nureva to develop and launch Nureva Visual Planner, which enables teams to effectively visualize, coordinate, and plan project activities in person or remotely. Ryan Companies is using AI, specifically computer vision, to monitor projects by placing multiple cameras around jobsites to “see” what is going on. 

At the start of 2020, Swinerton acquired two Boston Dynamics SPOT quadruped robots to use as tools for automating field data capture with attached lidar scanners, 360 cameras, and other payloads. Clancy & Theys implemented drone technology for marketing, preconstruction, and construction. Its latest drone approach captured the construction site prior to major concrete pours.

Throughout 2019, Arc Building Partners worked to integrate a management operating system (MOS) that allows the firm to incorporate tools, meetings, and behaviors used to manage teams and processes. Walbridge designed and built out virtual meeting rooms with large, collaborative technology walls to improve communication between program offices. 

Contractors are more receptive than ever to ways that help get projects done faster. Level 10 is using SpeedCore on its new 200 Park Ave. project in downtown Sunnyvale, Calif., scheduled for completion in 2023. This is the first project in that state to use the new hybrid core system, a concrete-filled composite shear wall core that takes 40% less time to erect than a comparable cast-in-place reinforced concrete core.

Modular design and construction are also saving contractors time and money. Lendlease has been rolling out Wellness Pods, a patent-pending solution that the firm claims are the first fully functioning modular restrooms introduced to the industry. The pods are engineered to be hoisted vertically, so they can be deployed on high-rise projects. 

M.C. Dean invested $25.1 million to expand its ModularMEP Manufacturing and Systems Integration Facility, which serves as the home for the firm’s product line of large-scale, fully-integrated, modularized power, electronic security, and telecom systems and rooms that are designed, engineered, integrated, tested, and pre-commissioned before being transported to project sites across the U.S.

Factory performed prefabrication in general is becoming integral to contractors’ estimating and delivery efficiencies. Balfour Beatty, in a joint venture with LF Driscoll, is part of an integrated project delivery (IPD) team building The Pavilion, a flagship hospital for Penn Medicine in Philadelphia scheduled to open next year. By standardizing the building’s structural floor plate and interior design early in the project, the team was able to prefabricate mechanical racks, bathroom pods, and zone valve boxes in a 60,000-sf offsite warehouse. CG Schmidt launched its own prefab center, housed within its existing yard operations. On a recent freestanding clinic project, prefabrication of the wood framing allowed for all walls and framework to be erected in two days. 

While nonresidential construction currently consumes a sliver of mass timber produced, the use of these engineered wood components is growing for many different projects. In June 2019, HITT Contracting opened Co|Lab, an R&D facility in Falls Church, Va., the first commercial mass timber structure in that state. DPR Construction used cross-laminated timber panels in the construction and renovation of the firm’s new office space in Sacramento, Calif. And Nabholz Corporation finished construction of the University of Arkansas’ Adohi Residence Hall, the country’s first large-scale mass timber residential hall. 

 

U.S. contractors become leaner machines

In 2019, nonresidential construction spending rose 2.8% to $782 billion, according to Census Bureau estimates. During that period, Summit Contracting Group broke ground on a dozen projects for repeat customers, including one whose contract value is the largest in the firm’s history: Novel Midtown, a mixed-use development in Tampa, Fla., showcasing 390 units in three buildings with 341,055 sf of livable space and 206,000 sf of retail.

Lean construction practices that minimize waste are catching on. More than 141 people enrolled in Gilbane’s Lean Practitioner program, a blended learning solution where the knowledge and experience of the participants work together to create a depth of expertise upon which they can build on. Sixty-two participants completed the program to become certified Gilbane Lean Practitioners. 

To encourage Lean practices, Robins & Morton held their inaugural Building Forward Connect event in March 2019. The two-day event brought together more than 600 attendees.

 


ALSO SEE: 2020 GIANTS 400 Contractor Rankings

Top 135 Contractors: Turner, Whiting-Turner, and STO Building Group head the rankings of the nation's largest general contractors, CM at risk firms, and design-builders for 2020. See the complete rankings.
Top 85 Construction Management + Project Management Firms: Jacobs, CBRE, VCC, and JLL top the rankings of the nation's largest construction management (as agent) and program/project management firms for 2020. See the complete rankings.    
For the full Giants 400 rankings and bonus categories, visit: BDCnetwork.com/Giants2020.

Pictured: Arlington (Va.) Public Schools Heights Building. Photo: Jim Tetro, courtesy Gilbane  


 

VJS Construction Services practices Lean Schedule Management, which enables its team to focus on efficient workflow, eliminating waste and over burdening of resources by looking at the project as a whole versus as a sum of its components. On VJS’s recently completed Fairway Knoll project in Germantown, Wis., the Phase-1 turnover was completed five weeks earlier than scheduled. 

On the M&A front, STO Building Group added two companies: BCCI Construction Company and Layton Construction. In September 2019, Cortland Build acquired Pure Multi-Family, a Canada-based REIT that owned and operated communities in Dallas-Fort Worth, Houston, Austin, San Antonio, and Phoenix. 

To support its burgeoning client base in the U.K., Cumming added construction consulting teams in London, Edinburgh, Manchester, and Stoke-on-Trent. Burns & McDonnell, which hired nearly 1,400 people globally last year, launched its first new brand in the firm’s history with 1898 & Co., a future-focused consulting and technology solutions arm. And McCarthy Building Companies expanded its expertise with the launch of McCarthy Mapping, a specialized service that helps owners and project teams accurately locate buried utility lines and other underground hazards before they potentially impact construction projects. 

Related Stories

| Aug 11, 2010

Citizenship building in Texas targets LEED Silver

The Department of Homeland Security's new U.S. Citizenship and Immigration Services facility in Irving, Texas, was designed by 4240 Architecture and developed by JDL Castle Corporation. The focal point of the two-story, 56,000-sf building is the double-height, glass-walled Ceremony Room where new citizens take the oath.

| Aug 11, 2010

Carpenters' union helping build its own headquarters

The New England Regional Council of Carpenters headquarters in Dorchester, Mass., is taking shape within a 1940s industrial building. The Building Team of ADD Inc., RDK Engineers, Suffolk Construction, and the carpenters' Joint Apprenticeship Training Committee, is giving the old facility a modern makeover by converting the existing two-story structure into a three-story, 75,000-sf, LEED-certif...

| Aug 11, 2010

Wisconsin becomes the first state to require BIM on public projects

As of July 1, the Wisconsin Division of State Facilities will require all state projects with a total budget of $5 million or more and all new construction with a budget of $2.5 million or more to have their designs begin with a Building Information Model. The new guidelines and standards require A/E services in a design-bid-build project delivery format to use BIM and 3D software from initial ...

| Aug 11, 2010

News Briefs: GBCI begins testing for new LEED professional credentials... Architects rank durability over 'green' in product attributes... ABI falls slightly in April, but shows market improvement

News Briefs: GBCI begins testing for new LEED professional credentials... Architects rank durability over 'green' in product attributes... ABI falls slightly in April, but shows market improvement

| Aug 11, 2010

University of Florida's traditionally modern graduate building

The University of Florida's Hough Hall Graduate Studies Building was designed by Rowe Architects, Tampa, and Sasaki Associates, Boston, to blend with the school's traditional collegiate gothic architecture outside, but reflect a 21st-century education facility inside. Tallahassee-based Ajax Building Corporation is constructing the $19 million facility, which will have traditional exterior detai...

| Aug 11, 2010

Florida International University's cantilevered design

Suffolk Construction's Miami-Dade business unit is serving as GC for the $14 million School of International and Public Affairs building at the University Park Campus of Florida International University. Designed by Arquitectonica, Miami, the five-story, 58,408-sf building will have a café and three auditoriums on the ground level; the largest auditorium will have a 40-foot cantilever abov...

| Aug 11, 2010

Restoration gives new life to New Formalism icon

The $30 million upgrade, restoration, and expansion of the Mark Taper Forum in Los Angeles was completed by the team of Rios Clementi Hale Studios (architect), Harley Ellis Devereaux (executive architect/MEP), KPFF (structural engineer), and Taisei Construction (GC). Work on the Welton Becket-designed 1967 complex included an overhaul of the auditorium, lighting, and acoustics.

| Aug 11, 2010

Best AEC Firms to Work For

2006 FreemanWhite Hnedak Bobo Group McCarthy Building Companies, Inc. Shawmut Design and Construction Walter P Moore 2007 Anshen+Allen Arup Bovis Lend Lease Cannon Design Jones Lang LaSalle Perkins+Will SmithGroup SSOE, Inc. Timothy Haahs & Associates, Inc. 2008 Gilbane Building Co. HDR KJWW Engineering Consultants Lord, Aeck & Sargent Mark G.

| Aug 11, 2010

Great Solutions: Business Management

22. Commercial Properties Repositioned for University USE Tocci Building Companies is finding success in repositioning commercial properties for university use, and it expects the trend to continue. The firm's Capital Cove project in Providence, R.I., for instance, was originally designed by Elkus Manfredi (with design continued by HDS Architects) to be a mixed-use complex with private, market-...

boombox1 - default
boombox2 -
native1 -

More In Category



AEC Tech

Lack of organizational readiness is biggest hurdle to artificial intelligence adoption

Managers of companies in the industrial sector, including construction, have bought the hype of artificial intelligence (AI) as a transformative technology, but their organizations are not ready to realize its promise, according to research from IFS, a global cloud enterprise software company. An IFS survey of 1,700 senior decision-makers found that 84% of executives anticipate massive organizational benefits from AI. 


Codes and Standards

Updated document details methods of testing fenestration for exterior walls

The Fenestration and Glazing Industry Alliance (FGIA) updated a document serving a recommended practice for determining test methodology for laboratory and field testing of exterior wall systems. The document pertains to products covered by an AAMA standard such as curtain walls, storefronts, window walls, and sloped glazing. AAMA 501-24, Methods of Test for Exterior Walls was last updated in 2015. 

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021