flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

San Jose’s new tallest building tops out

Mixed-Use

San Jose’s new tallest building tops out

Steinberg Hart designed the project.


By David Malone, Associate Editor | August 4, 2020
MIRO mixed-use towers in San Jose

Courtesy Suffolk

At 28-stories, MIRO, a mixed-use residential project, is set to be the new tallest building in San Jose.

The design features two towers with the same window wall and curtain wall systems and alternating balconies. The rooftop of the West Tower will feature amenities for indoor/outdoor social gatherings and private events with seating. The East Tower will feature outdoor seating and fitness. Each rooftop will be landscaped and offer views of the surrounding area.

The towers, which recently celebrated their topping out, stretch along E. Santa Clara Street between 4th and 5th Streets and sit atop a parking structure with four levels of above grade parking, three levels of below grade parking, and a landscaped roof with pool deck and amenities. 

 

 

Additionally, the ground level of the parking structure will include approximately 15,000 sf of retail. Grand entry lobbies will face E. Santa Clara Street with a shared apartment entry lobby that leads to a double-height flex/retail space anchored at the southwest corner on level three.

The 630-unit project is slated for completion in spring 2021. Suffolk is building the project with Bayview Development Group as the Developer and Steinberg Hart as the architect.

Tags

Related Stories

Mixed-Use | Apr 26, 2022

Downtown Phoenix to get hundreds of residential and student housing units

In fast-growing Phoenix, Arizona, a transit-oriented development called Central Station will sit adjacent to Arizona State University’s Downtown Phoenix campus. 

Mixed-Use | Apr 22, 2022

San Francisco replaces a waterfront parking lot with a new neighborhood

A parking lot on San Francisco’s waterfront is transforming into Mission Rock—a new neighborhood featuring rental units, offices, parks, open spaces, retail, and parking.

Wood | Apr 13, 2022

Mass timber: Multifamily’s next big building system

Mass timber construction experts offer advice on how to use prefabricated wood systems to help you reach for the heights with your next apartment or condominium project. 

Office Buildings | Apr 11, 2022

SOM-designed office tower aims to promote health and wellness

Skidmore, Owings & Merrill (SOM) recently completed work on 800 Fulton Market, a new mixed-use office building in Chicago’s historic Fulton Market/West Loop neighborhood.

Multifamily Housing | Mar 29, 2022

Here’s why the U.S. needs more ‘TOD’ housing

Transit-oriented developments help address the housing affordability issue that many cities and suburbs are facing.

Multifamily Housing | Feb 24, 2022

First new, mixed-use high-rise in Detroit’s central business district in nearly 30 years opens

City Club Apartments completed two multifamily projects in 2021 in downtown Detroit including the first new, mixed-use high-rise in Detroit’s central business district in nearly 30 years.

Office Buildings | Feb 23, 2022

The Beam on Farmer, Arizona’s first mass timber, multi-story office building tops out

The Beam on Farmer, Arizona’s first mass timber, multi-story office building, topped out on Feb. 10, 2022.

Mixed-Use | Feb 9, 2022

David Chipperfield Architects to design Schützenstraße mixed-use development in Munich

The firm recently won a competition for the project.

Mixed-Use | Jan 13, 2022

Details unveiled for Atlanta’s Campus 244 mixed-use development

S9 Architecture is designing the project.

Mixed-Use | Jan 10, 2022

Mixed-use Arsenal Yards completes in Watertown’s East End

PCA master-planned the seven-building, one million sf destination and designed the urban village, residences, and open spaces.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021